Print Statement | | | 12/26/2019 | | DONE |
|
|
|
2nd reminder
|
Print Statement | | | 12/2/2019 | | DONE |
|
|
|
first past due
|
Print Statement | | | 10/23/2019 | | DONE |
|
|
|
|
Second Notice | | 8/12/2019 | 9/19/2019 | | DONE |
|
|
|
mailed 9-20-19
|
First Notice | | 8/1/2019 | 8/2/2019 | | DONE |
|
|
|
mailed out 8/5/2019
|
BLD-Final | 7/19/2019 | 7/22/2019 | 7/22/2019 | A | PASS |
Jim Storey
|
|
|
Mike Phone #: ###-####
|
Permanent Occupancy | | | 7/22/2019 | | DONE |
|
|
|
|
FIRE-Final Inspection | 7/17/2019 | 7/19/2019 | 7/19/2019 | A | PASS |
Jim Page
|
|
|
Fire sprinkler inspection is complete, no fire alarm modifications, fire extinguishers are placed with current inspection tags. Final life fire safety inspection for area of work complete.
Michael Phone #: ###-####
|
PubWorks Occupancy Approval | 7/19/2019 | 7/19/2019 | 7/19/2019 | | DONE |
Jason C. Taylor
|
|
|
Project Complete- Ok for Occupancy. JCT
|
Override - Parcel Holds | | | 7/19/2019 | | |
|
|
|
|
FIRE-Conference | 7/2/2019 | 7/2/2019 | 7/2/2019 | A | DONE |
Jim Page
|
|
|
During my fire sprinkler inspection it was noticed that equipment was running, asked warehouse personnel if they were setting up equipment or if they were producing. I was informed that they were in fact producing. The fire sprinkler inspection has not been finaled for extra work, the electrical permit is in issued status as of this entry and no life fire safety inspection has been performed. I spoke with Gareth over the phone and informed him that production should not be happening until all inspections are complete and finaled for all permits associated with area of work.
|
Zoning Approval | 5/17/2019 | 5/17/2019 | 5/17/2019 | | DONE |
Andrea Tuning
|
|
|
|
FIRE-Conference | 5/16/2019 | 5/16/2019 | 5/16/2019 | P | DONE |
Jim Page
|
|
|
Fire conference complete, GC will need to contact a fire sprinkler contractor to fix blocked sprinkler head issues, elevated platforms and possible head addition under industrial containers.
Mike- please call Phone #: ###-####
|
FIRE-Final Inspection | 5/16/2019 | 5/16/2019 | 5/16/2019 | P | CANC |
Jim Page
|
|
|
Mike- please call Phone #: ###-####
|
Telephone call | | | 5/16/2019 | | DONE |
|
|
|
Tried calling Mike at ###-#### (number not in Service) to inform him that he needs a Mechanical permit per Julie and Troy
|
BLD-Conference | 5/14/2019 | 5/14/2019 | 5/14/2019 | P | DONE |
Jim Storey
|
|
|
Michael Phone #: ###-####
|
Print Occupancy Form | | | 3/8/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 3/8/2019 | | DONE |
|
|
|
|
Meeting | | | 3/6/2019 | | DONE |
|
|
|
sent email to jeremy@neudesignarch.com recommending to sent in a request for an extension if the permit was not going to be picked up this week
|
Plan assigned to (JAR) | 9/12/2018 | 9/12/2018 | 2/28/2019 | | DONE |
Julie Romig
|
|
|
02/25 - 1st Rev Comp - 3rd Rev - L3 Teffco Warehouse
|
Routing - PLAN CHECK | 2/15/2019 | | 2/28/2019 | | PASS |
Julie Romig
|
|
|
3rd Review
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/28/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/28/2019 | | DONE |
|
|
|
Need GC
Need Rev cert of val
|
Routing - FIRE | 2/15/2019 | 2/19/2019 | 2/27/2019 | | PASS |
Erika Akin
|
|
|
Attached revised comments to case
|
Routing Off Site - C.D.H | 2/19/2019 | | 2/27/2019 | | PASS |
Julie Romig
|
|
|
|
Routing Off Site - C.D.H | 11/27/2018 | | 12/6/2018 | | FAIL |
Julie Romig
|
|
|
|
Routing - PLAN CHECK | 11/8/2018 | | 11/27/2018 | | FAIL |
Julie Romig
|
|
|
2nd Review - report emailed to applicant
|
Routing - FIRE | 11/8/2018 | 11/8/2018 | 11/21/2018 | | FAIL |
Erika Akin
|
|
|
Attached comments to case and emailed architect
|
Routing - MECHANICAL | 11/8/2018 | | 11/8/2018 | | PASS |
Troy James
|
|
|
|
Route to Impact Fee Review | 10/18/2018 | 10/21/2018 | 10/19/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 10/18/2018 | | DONE |
Julie Romig
|
|
|
|
Routing - PLAN CHECK | 9/12/2018 | | 10/18/2018 | | FAIL |
Julie Romig
|
|
|
|
Routing - FIRE | 9/12/2018 | 9/12/2018 | 10/16/2018 | | FAIL |
Erika Akin
|
|
|
Attached comments to case and emailed architect
|
Routing Off Site - STRUCTURAL | 9/12/2018 | | 9/27/2018 | | PASS |
Julie Romig
|
|
|
AHJ
|
Routing PW Environmental | 9/13/2018 | | 9/20/2018 | | PASS |
Rick Christenson
|
|
|
|
Routing - MECHANICAL | 9/12/2018 | | 9/18/2018 | | FAIL |
Troy James
|
|
|
Need equipment plan and its function. Dust collection may be required.
|
Routing - Design Review | 9/12/2018 | | 9/17/2018 | | PASS |
Andrea Tuning
|
|
|
|
Routing - Addressing | 9/12/2018 | | 9/13/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 9/12/2018 | | 9/13/2018 | | PASS |
Morgan Webb
|
|
|
|
Routing - Erosion and Sediment | 9/12/2018 | | 9/13/2018 | | PASS |
Michael Zawacki
|
|
|
No new ESC permit required. Site operating under ESC17-01488
|
Intake Approval | | | 9/10/2018 | | PASS |
|
|
|
|
Intake Approval | | | 9/6/2018 | | FAIL |
Joe Bruce
|
|
|
Provide the following items to complete your prescreen:
1. Sheets G-003, G-004, and S0.3 do not have the required space reserved for City approval stamps as specified in the Electronic Plans Submittal Standards. Revise sheets with a blank 4” x 2” space located 3” off the right sheet edge to allow for the title block. Verify all sheets have the required space for city approval stamp.
2. Sheet G-001 references the wrong energy code. The City of Boise has adopted the 2015 IECC. Revise drawings to show correct code.
3. Show required locations exit signs and fire extinguishers even if they are existing or on another permit package.
|
Application received | | | 9/4/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 4 2018 2:13PM
|