Permit Information
Permit NumberBLD18-03237
StatusFinaled
Name ALPINE CONSTRUCTION INC
Site Address 213 N 9TH ST Unit: 510
Project NameColumbia Bank
Customer Number 
ePlanReviewYes
Description
(COLUMBIA BANK - SUITE #510 & #520) The fire sprinkler system is used to meet high-rise provisions. Permit is to remodel (2) tenant suites into one 3,189 sq. ft. office tenant space on the 5th floor within an existing building. Work to include: removal of select interior nonbearing walls, removal of select door/door frames, construction of select interior non-bearing walls, new door/door frames, new interior windows/glazing, new millwork, new sink & dishwasher, select new suspended acoustic ceiling, electrical work, plumbing work, mechanical work and interior finishes in compliance with Ch. 8 of the current IBC. The corridor for this building is rated and all penetrations and wall infill shall maintain the corridor rating. This building is fully Fire Sprinklered. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JHB**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 6/12/20196/24/2019 DONE
This permit finaled on the web by Garrett Bailey
Third Notice 5/11/20196/7/2019 DONE
mailed 6-10
Third Notice 4/13/20195/6/2019 DONE
mailed 5-10-19
Second Notice 3/17/20194/8/2019 DONE
mailed 4-11-19
First Notice 3/1/20193/7/2019 DONE
mailed 3-11
BLD-Final2/19/20192/19/20192/19/2019PPASS
DetailsDave Hannah
Call 15 minutes ahead // Garret Phone #: ###-#### all of the locks have been removed from office doors and blanks installed
Permanent Occupancy  2/19/2019 DONE
BLD-Conference2/15/20192/15/20192/15/2019PPEND
DetailsTony Young
Garrett,, still waiting on the hardware
BLD-Conference2/8/20192/11/20192/15/2019APEND
DetailsTony Young
BLD-Final2/8/20192/8/20192/8/2019PFAIL
DetailsDave Hannah
Garrett-please call 20 minutes prior to meet Phone #: ###-#### lock on doors to offices not code complant
FIRE-Final Inspection2/7/20192/8/20192/8/2019APASS
DetailsJim Page
Previously noted items have been completed, final life fire safety inspection for area of work complete.

Garrett Phone #: ###-####
BLD-Final2/1/20192/1/20192/1/2019PPART
DetailsBrandon Shaw
Per Jim page- TCO authorized for 14 days for life fire safety inspection per conversation with Ron Johnson contingent on the permit for the access control door release permit (FIR19-00076) is inspected and finaled. Life fire safety can be finaled when mentioned permit is complete and finalized as well.
BLD-Ceiling Grid Inspection1/31/20192/1/20192/1/2019ACANC
DetailsBrandon Shaw
Garrett Phone #: ###-####
FIRE-Final Inspection1/31/20191/31/20191/31/2019PPART
DetailsJim Page
TCO authorized for 14 days for life fire safety inspection per conversation with Ron Johnson contingent on the permit for the access control door release permit (FIR19-00076) is inspected and finaled. Life fire safety can be finaled when mentioned permit is complete and finalized as well.
FIRE-Final Inspection1/31/20191/31/20191/31/2019PCANC
DetailsJim Page
Garett Phone #: ###-####-as -per Garrett cancel insp
BLD-Final1/28/20191/29/20191/30/2019PNR
DetailsDave Hannah
Garret Phone #: ###-#### needs fire finals
FIRE-Final Inspection1/28/20191/29/20191/29/2019AFAIL
DetailsJim Page
Access control door to the right of the main entry when entering space appears to not be connected to the fire alarm panel, access control needs to de-energize during general fire alarm.

Garret Phone #: ###-####
BLD-Ceiling Grid Inspection1/15/20191/16/20191/16/2019APASS
DetailsDave Hannah
Garret Phone #: ###-####
BLD-Framing/Rough-in11/19/201811/19/201811/19/2018PPASS
DetailsDave Hannah
billy yeager Phone #: ###-####
Issue PAID IN FULL permit  10/26/2018 DONE
Print Occupancy Form  10/26/2018 DONE
Plan assigned to (JHB)9/17/20189/17/201810/2/2018 PASS
DetailsJoe Bruce
10/03 (L2) - Columbia Bank ePlan
Routing - PLAN CHECK9/17/2018 10/2/2018 PASS
DetailsJoe Bruce
1st review completed  10/2/2018 DONE
DetailsJoe Bruce
PLANS/APPL TAKEN TO FRONT DESK  10/2/2018 DONE
Permit Ready to Issue  10/2/2018 DONE
MET (in person)
NEED
GC FORM
REVISED CERT OF VALUE
Routing - MECHANICAL9/17/2018 9/24/2018 PASS
DetailsTroy James
Routing - PUBLIC WORKS9/17/2018 9/19/2018 PASS
DetailsRachael Beierle
Routing - PLUMBING9/17/2018 9/18/2018 PASS
DetailsDaryl Spivey
Per plan and ISPC.
Routing - Addressing9/17/2018 9/18/2018 PASS
DetailsDoug Chausow
Suite 510
Intake Approval  9/13/2018 PASS
DetailsJavier Guzman
Intake Approval  9/12/2018 FAIL
DetailsJoe Bruce
1) Mechanical and plumbing drawings were uploaded into the incorrect folder. Please upload those drawings into the "Drawings" folder.

All the other items have been verified.
Intake Approval  9/11/2018 FAIL
DetailsJoe Bruce
1) Name and contact information of the Design Professional must be filled in on form #304.
2) Show any existing plumbing fixtures that are located in the common space for required plumbing fixtures (IBC Chapter 29)
3) MP200 and MP201 - COMCheck sheets are blank. Upload Mechanical Compliance / COMCheck with required forms.
4) Mechanical/Plumbing sheets are missing the required stamp by an Idaho licensed engineer. Upload new mechanical sheets with stamp/signature.
5) Heating and cooling load calculations could not be found on sheet MP100. Provide heating and cooling load calculations.
6) Cover Sheet (G101) - Reserve the bottom right corner for City approval stamps. Leave a blank 4” x 4” space located 3” off the right sheet edge to allow for the title block. Upload sheet G101 with space for City approval stamp. - Reference the online ePlanReview electronic plan submittal standards.
7) Drawing files (MP001, A001) - Reserve the bottom right corner for City electronic stamps. Leave a blank 4” x 2” space located 3” off the right sheet edge to allow for the title block. - Reference the online ePlanReview electronic plan submittal standards.
Application received  9/4/2018 DONE
Application submitted via PDS Online on Sep 4 2018 3:35PM