BLD-Final | 2/19/2020 | 2/19/2020 | 2/19/2020 | P | PASS |
Mike Jordan
|
|
|
Cody- please call for access Phone #: ###-####
|
DOC - Permit Finaled | 2/19/2020 | 2/19/2020 | 2/19/2020 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Final | 2/14/2020 | 2/18/2020 | 2/18/2020 | A | FAIL |
Mike Jordan
|
|
|
Cody Phone #: ###-####. Provide landing from on exterior door from master bedroom. provide blower door test rsults.
|
BLD-Energy code compliance | 6/27/2019 | 6/28/2019 | 6/28/2019 | A | PASS |
Mike Jordan
|
|
|
Coty Phone #: ###-####
|
BLD-Framing/Rough-in | 6/27/2019 | 6/28/2019 | 6/28/2019 | A | PASS |
Mike Jordan
|
|
|
Coty Phone #: ###-####
|
BLD-Framing/Rough-in | 6/11/2019 | 6/12/2019 | 6/12/2019 | A | PART |
Mike Jordan
|
|
|
Call ahead // Cody Phone #: ###-####
|
BLD-Framing/Rough-in | 5/21/2019 | 5/22/2019 | 5/22/2019 | A | FAIL |
Mike Jordan
|
|
|
Cody Phone #: ###-####. Nail off all multiply trusses per the engineering, B2 E2 and A20. Roll block C2 and C3 trusses. Install hangar on A01 truss for bearing. Install all blocking for Gyp board shear walls.
|
BLD-Framing/Rough-in | 5/14/2019 | 5/15/2019 | 5/15/2019 | A | NR |
Jim Storey
|
|
|
Cody Phone #: ###-#### need air seal/ need truss engneering
|
BLD-Framing/Rough-in | 4/8/2019 | 4/8/2019 | 4/8/2019 | P | CANC |
Mike Jordan
|
|
|
Phone #: 2082159239 >> Inspection requested via mobile web by Cody
|
BLD-Wall Bracing | 4/8/2019 | 4/8/2019 | 4/8/2019 | P | PASS |
Mike Jordan
|
|
|
Phone #: 2082159239 >> Inspection requested via mobile web by Cody
|
BLD-Framing/Rough-in | 4/4/2019 | 4/5/2019 | 4/5/2019 | A | FAIL |
Mike Jordan
|
|
|
Call prior to going Phone #: 2082159239 >> Inspection requested via mobile web by Cody. Install all missed blocking, complete portal frames, install holdowns, re nail missed areas on sheathing.
|
BLD-Foundation | 2/11/2019 | 2/11/2019 | 2/11/2019 | P | PART |
Mike Jordan
|
|
|
wall- Derik Phone #: ###-####
|
BLD-Footing | 2/8/2019 | 2/8/2019 | 2/8/2019 | P | PART |
Mike Jordan
|
|
|
Derik Phone #: ###-####
|
Place hold on job | 1/23/2019 | | 1/24/2019 | | DONE |
Tiffany Carson-Herker
|
|
|
waiting for signed permit
|
Inspection Record Card- Bld | | | 1/22/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/22/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 1/22/2019 | | DONE |
|
|
|
|
Meeting | | | 1/22/2019 | | DONE |
|
|
|
emiled Cody permits to sign.
|
Meeting | | | 1/11/2019 | | DONE |
|
|
|
emailed cody informing him that the erosion permit will need to be paid for as well before issuance
|
Routing - PLAN CHECK | 1/2/2019 | | 1/2/2019 | | PASS |
Michael Hanson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/2/2019 | | DONE |
Michael Hanson
|
|
|
|
Permit Ready to Issue | | | 1/2/2019 | | DONE |
|
|
|
|
Plan assigned to (M_H) | 11/13/2018 | | 1/2/2019 | | DONE |
Michael Hanson
|
|
|
11/26 #402 L1 ePlan. 1st review completed - See changemarks in ePlan for corrections required. MDH
|
Routing - PLANNING | 12/10/2018 | | 12/10/2018 | | PASS |
Sue Cummings
|
|
|
No approval of the shop is with this permit SC
|
Routing - PLAN CHECK | 12/10/2018 | | 12/10/2018 | | FAIL |
Michael Hanson
|
|
|
See changemarks in ePlan for corrections required. MDH
|
Routing - PLAN CHECK | 11/29/2018 | | 11/29/2018 | | FAIL |
Michael Hanson
|
|
|
Nothing was uploaded... Returned to applicant. MDH
|
1st review completed | | | 11/26/2018 | | FAIL |
Michael Hanson
|
|
|
See changemarks in ePlan for corrections required. MDH
|
Routing - PLAN CHECK | 11/13/2018 | | 11/26/2018 | | FAIL |
Michael Hanson
|
|
|
See changemarks in ePlan for corrections required. MDH
|
Routing - MECHANICAL | 11/13/2018 | | 11/16/2018 | | PASS |
Troy James
|
|
|
|
Route to Impact Fee Review | 11/13/2018 | 11/16/2018 | 11/14/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Plans ACCEPTED BY PLAN TECH | | | 11/13/2018 | | DONE |
|
|
|
|
Intake Approval | | | 11/13/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/13/2018 | | DONE |
|
|
|
|
Routing - Addressing | 11/13/2018 | | 11/13/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 11/13/2018 | | 11/13/2018 | | PASS |
Rita DeYoung
|
|
|
|
Telephone call | | | 10/2/2018 | | DONE |
|
|
|
Cody called seeing where the permit is for review. informed him on the corrections that are needed and sent back to him on 9/27 at 4:30. labeling is inncorrect, need cross section and can not have his personal address on the manual J
|
Intake Approval | | | 9/27/2018 | | FAIL |
|
|
|
NEED TO
LABEL CORRECTLY
MISSING CROSS SECTION
MANUAL J NEEDS CORRECT ADDRESS
|
Intake Approval | | | 9/17/2018 | | FAIL |
|
|
|
NEED TO LABEL CORRECTLY
MISSING CROSS SECTION
MANUAL J NEEDS CORRECT ADDRESS
|
Application received | | | 9/4/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 4 2018 4:32PM
|
Routing - PLANNING | 11/13/2018 | | | | FAIL |
|
|
|
The shop over 1,000 s.f. requires approval of a zoning certificate prior to obtaining a building permit
|
Routing - PLANNING | 11/29/2018 | | | | FAIL |
|
|
|
Shop over 1,000 s.f. requires a zoning certificate prior to approval of a building permit
|