Print Statement | | | 1/9/2020 | | DONE |
|
|
|
|
First Notice | | 12/30/2019 | 12/30/2019 | | DONE |
|
|
|
mailed 1-1-20
|
Telephone call | | | 12/20/2019 | | DONE |
|
|
|
this permit was on FNL status because it had been doc final on the 11/27/19
|
Permanent Occupancy | | | 12/20/2019 | | DONE |
|
|
|
|
PubWorks Occupancy Approval | 12/2/2019 | 12/2/2019 | 12/2/2019 | | DONE |
Tiffany Lowery
|
|
|
|
BLD-Final | 11/27/2019 | 11/27/2019 | 11/27/2019 | P | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Scott Simons
|
DOC - Permit Finaled | 11/27/2019 | 11/27/2019 | 11/27/2019 | P | PASS |
Brandon Shaw
|
|
|
|
FIRE-Final Inspection | 11/27/2019 | 11/27/2019 | 11/27/2019 | A | PASS |
Jim Page
|
|
|
Previously noted items have been corrected, final life fire safety inspection is complete, signature card not available at time of inspection.
Phone #: ###-#### Inspection requested via web by Scott Simons
|
BLD-Final | 11/21/2019 | 11/22/2019 | 11/22/2019 | P | PART |
Brandon Shaw
|
|
|
All trades have OK'd Temp C. of O... Employee training and classroom set up only...
|
FIRE-Final Inspection | 11/22/2019 | 11/22/2019 | 11/22/2019 | A | PART |
Jim Page
|
|
|
Partial final inspection for life fire safety inspection complete. Fire sprinkler inspection is complete, fire alarm inspection is complete, fire extinguishers are placed with current inspection tags. Items to inspect before final sign off are internally illuminated exit signs placed on exterior gates as discussed, place a class K fire extinguisher is kitchen per building permit fire code review comments, verify motion sensor operation on mag locks, south main entry, place map at fire panel with floor plan and location of initiating devices. Per conversation with Joe Bruce, Fire Section Supervisor, a 30 day TCO is authorized for life fire safety.
|
FIRE-Conference | 11/21/2019 | 11/22/2019 | 11/22/2019 | A | DONE |
Jim Page
|
|
|
Fire conference complete.
Really need Fire and life safety! No line item for that inspection! Thanks! Phone #: ###-#### Inspection requested via web by Scott Simons
|
BLD-Ceiling Grid Inspection | 11/6/2019 | 11/6/2019 | 11/6/2019 | P | PEND |
Brandon Shaw
|
|
|
See FIR19-00536 for areas OK to cover...
|
BLD-Energy code compliance | 9/24/2019 | 9/24/2019 | 9/24/2019 | P | PASS |
Brandon Shaw
|
|
|
Anytime you’re available...thanks Phone #: ###-#### Inspection requested via web by Scott Simons
|
BLD-Framing/Rough-in | 9/19/2019 | 9/19/2019 | 9/19/2019 | P | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Scott Simons
|
BLD-Other | 9/13/2019 | 9/13/2019 | 9/13/2019 | A | PASS |
Brandon Shaw
|
|
|
Interior shear wall inspection Phone #: ###-#### Inspection requested via web by Scott Simons
|
BLD-Framing/Rough-in | 8/29/2019 | 8/30/2019 | 8/30/2019 | A | PASS |
Brandon Shaw
|
|
|
Exterior shear wall inspection ...
|
BLD-Framing/Rough-in | 8/16/2019 | 8/16/2019 | 8/16/2019 | A | PART |
Brandon Shaw
|
|
|
Need a partial inspection framing because closed cell insulation above ceiling grid...
|
BLD-Conference | 8/15/2019 | 8/15/2019 | 8/15/2019 | A | DONE |
Brandon Shaw
|
|
|
A quick telephone conference about a partial framing inspection ... thanks! Scott Phone #: ###-#### Inspection requested via web by Scott Simons
|
BLD-Conference | 7/15/2019 | 7/15/2019 | 7/15/2019 | P | DONE |
Brandon Shaw
|
|
|
I know you’re plate is full today should just take a few minutes.... Thanks! Scott Phone #: ###-#### Inspection requested via web by Scott Simons
|
BLD-Concrete | 6/25/2019 | 6/26/2019 | 6/26/2019 | P | PASS |
Brandon Shaw
|
|
|
Need a re-bar inspection on building slab please please call Shane ###-#### Phone #: ###-#### Inspection requested via web by Jake Mathews
|
BLD-Footing | 5/30/2019 | 5/31/2019 | 5/31/2019 | P | PASS |
Brandon Shaw
|
|
|
columns // Dane Phone #: ###-####
|
BLD-Foundation | 5/28/2019 | 5/29/2019 | 5/29/2019 | P | PART |
Brandon Shaw
|
|
|
Work in progress... Pending Special Inspection...
|
BLD-Footing | 5/14/2019 | 5/15/2019 | 5/15/2019 | A | PART |
Brandon Shaw
|
|
|
Work in progress... Pending Special Inspection...
|
BLD-Footing | 5/13/2019 | 5/14/2019 | 5/14/2019 | P | CANC |
Brandon Shaw
|
|
|
Dane Phone #: ###-####
|
Meeting | | | 3/29/2019 | | DONE |
|
|
|
Working with Kayla and Kirk on this permit. DO NOT EXPIRE
|
Issue PAID IN FULL permit | | | 3/29/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 3/29/2019 | | DONE |
|
|
|
|
Meeting | | | 3/28/2019 | | DONE |
|
|
|
sent overall fee amount due to Kayla KLEMONS21@YAHOO.COM
|
Meeting | | | 3/27/2019 | | DONE |
|
|
|
sent email to doug and kayla recommending they send in a request for an extension on their permit if it is not going to be paid for and picked up by friday 3-29. see documents
|
Plan assigned to (CJW) | 1/18/2019 | 1/23/2019 | 3/21/2019 | | PASS |
Carl Westfall
|
|
|
(2nd done) 02/21/19 (new - 25 days) (eplan - 63 sheets) The Barnyard Daycare (routed to staff)
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/21/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/21/2019 | | DONE |
|
|
|
MET KLEMONS21@YAHOO.COM
Need
GC form
Revised value
|
Routing Off Site - STRUCTURAL | 3/12/2019 | | 3/20/2019 | | PASS |
Carl Westfall
|
|
|
Ena Beganovic (KPFF)
|
Routing - FIRE | 3/12/2019 | 3/12/2019 | 3/15/2019 | | PASS |
Mark Scharfen
|
|
|
IFC Final review 03.15.2019.pdf uploaded.
|
Routing PW Street Lights | 3/12/2019 | | 3/13/2019 | | PASS |
Tom Marshall
|
|
|
|
Routing - PLUMBING | 3/12/2019 | | 3/13/2019 | | PASS |
Daryl Spivey
|
|
|
Install ASSE 1070 tempering valves on P-10 Lavs as required by ISPC 407.3
|
Routing - Design Review | 3/12/2019 | | 3/13/2019 | | PASS |
Katelyn Menuge
|
|
|
Moved redlines
|
Plan resubmittals received | | | 3/12/2019 | | DONE |
Carl Westfall
|
|
|
|
Routing - PLAN CHECK | 3/12/2019 | | 3/12/2019 | | PASS |
Carl Westfall
|
|
|
Pending structural
|
Route to Impact Fee Review | 2/28/2019 | 3/3/2019 | 3/1/2019 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing - FIRE | 1/18/2019 | 1/23/2019 | 2/28/2019 | | FAIL |
Mark Scharfen
|
|
|
IFC 1st review 02.28.2019.pdf uploaded and emailed to architect.
|
Routing - PLAN CHECK | 1/23/2019 | | 2/28/2019 | | FAIL |
Carl Westfall
|
|
|
|
Plan resubmittals requested | | | 2/28/2019 | | DONE |
|
|
|
|
1st review completed | | | 2/28/2019 | | DONE |
|
|
|
|
Routing Off Site - STRUCTURAL | 1/23/2019 | | 2/5/2019 | | FAIL |
Carl Westfall
|
|
|
Ena Beganovic (KPFF)
|
Routing - MECHANICAL | 1/23/2019 | | 2/4/2019 | | PASS |
Troy James
|
|
|
|
Routing PW Environmental | 1/23/2019 | | 1/31/2019 | | PASS |
Rick Christenson
|
|
|
|
Routing - Design Review | 1/23/2019 | | 1/25/2019 | | PASS |
Katelyn Menuge
|
|
|
|
Routing - PLUMBING | 1/23/2019 | | 1/24/2019 | | PASS |
Daryl Spivey
|
|
|
See red line remarks. Install per plan and ISPC.
|
Routing - PLANNING | 1/23/2019 | | 1/24/2019 | | PASS |
David Moser
|
|
|
Allowed in Harris Ranch SE14 block type - see DRH18-00250
|
Routing PW Street Lights | 1/23/2019 | | 1/24/2019 | | FAIL |
Tom Marshall
|
|
|
sent email to Doug Cooper about required changes.
|
Routing PW Solid Waste | 1/23/2019 | | 1/24/2019 | | PASS |
Evan Carpenter
|
|
|
|
Routing PW Drainage | 1/23/2019 | | 1/23/2019 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Sewer Design | 1/23/2019 | | 1/23/2019 | | PASS |
DeAnn Brown
|
|
|
|
Routing - Addressing | 1/23/2019 | | 1/23/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 1/23/2019 | | 1/23/2019 | | PASS |
Angela Hardy
|
|
|
|
Routing - Erosion and Sediment | 1/23/2019 | | 1/23/2019 | | PASS |
Michael Zawacki
|
|
|
Duplicate. Please refer to ESC18-01286 for site.
|
Intake Approval | | | 1/18/2019 | | PASS |
Julie Romig
|
|
|
Prescreen approved by JAR on 11/29/18; Fees paid 01/18/2019.
|
Telephone call | | | 11/29/2018 | | DONE |
|
|
|
Spoke with Kayla Harman. Changed value due to grading permit value (GRD18-00074)
|
Intake Approval | | | 11/28/2018 | | FAIL |
Julie Romig
|
|
|
Sheet S2.1, S2.2 and S3.3 are missing the structural stamp/signature. Please upload revised sheets with stamp/signature.
|
Intake Approval | | | 9/12/2018 | | FAIL |
Julie Romig
|
|
|
Need:
1. Stamp/signature on Sheets A4.0, A4.1.
|
Application received | | | 9/5/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 5 2018 9:52AM
|