BLD-Final | 4/17/2019 | 4/18/2019 | 4/18/2019 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
DOC - Permit Finaled | 4/18/2019 | 4/18/2019 | 4/18/2019 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Blower Door Test Results | 4/17/2019 | 4/18/2019 | 4/18/2019 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall 5.0
|
BLD-Final | 4/14/2019 | 4/16/2019 | 4/16/2019 | A | CANC |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD-Blower Door Test Results | 4/14/2019 | 4/16/2019 | 4/16/2019 | A | CANC |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD-Energy code compliance | 2/6/2019 | 2/8/2019 | 2/8/2019 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD-Framing/Rough-in | 2/4/2019 | 2/6/2019 | 2/6/2019 | A | PEND |
Brandon Shaw
|
|
|
Pending review for modification to roof trusses... No framing issues... OK to insulate...
|
Plan assigned to (J_N) | 2/6/2019 | 2/6/2019 | 2/6/2019 | | DONE |
Jenny Nelson
|
|
|
|
Routing - PLAN CHECK | 2/6/2019 | | 2/6/2019 | | PASS |
Jenny Nelson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/6/2019 | | DONE |
Jenny Nelson
|
|
|
|
CHANGE STATUS TO (ISS) | | | 2/6/2019 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 2/6/2019 | | DONE |
|
|
|
plan mod started-called Josh B to let know i started the plan mod workflow in e plan for changes that were made in the field that need to be uploaded in e plan. Left message at ###-#### and sent him an email
|
BLD-Wall Bracing | 1/23/2019 | 1/24/2019 | 1/24/2019 | A | PASS |
Brandon Shaw
|
|
|
rudy Phone #: ###-####
|
BLD-Footing | 11/8/2018 | 11/8/2018 | 11/8/2018 | P | PASS |
Dave Hannah
|
|
|
Matt Phone #: ###-####
|
PubWorks Subgrade Approval | 11/6/2018 | 11/6/2018 | 11/6/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Issue PAID IN FULL permit | | | 10/29/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/29/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 10/26/2018 | | |
|
|
|
|
Plan assigned to (J_N) | 9/14/2018 | 9/14/2018 | 10/26/2018 | | DONE |
|
|
|
09/19 sfd L1 ePlan. 2nd review, steel column not addressed 1st review complete, 310 special inspection form needed for steel column.
|
Routing - PLAN CHECK | 10/26/2018 | | 10/26/2018 | | PASS |
Jenny Nelson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/26/2018 | | DONE |
Jenny Nelson
|
|
|
|
Override - Parcel Holds | | | 10/26/2018 | | |
|
|
|
|
Permit Ready to Issue | | | 10/26/2018 | | DONE |
|
|
|
|
Routing - FIRE | 10/25/2018 | 10/25/2018 | 10/25/2018 | | PASS |
Tim Frost
|
|
|
|
Routing - PLAN CHECK | 10/23/2018 | | 10/23/2018 | | FAIL |
Jenny Nelson
|
|
|
|
Routing - FIRE | 10/22/2018 | 10/22/2018 | 10/22/2018 | | FAIL |
Tim Frost
|
|
|
One item of the review comments was not addressed
|
1st review completed | | | 9/20/2018 | | FAIL |
|
|
|
Need 310 special inspection form
|
Routing - PLAN CHECK | 9/6/2018 | | 9/20/2018 | | FAIL |
Rob Patrick
|
|
|
See ePlan comments per JJN. MDH
|
Plan assigned to (RDP) | 9/6/2018 | 9/6/2018 | 9/14/2018 | | DEFR |
Rob Patrick
|
|
|
9/19 sfd L1 ePlan
|
Routing - FIRE | 9/6/2018 | 9/6/2018 | 9/10/2018 | | FAIL |
Tim Frost
|
|
|
New SFH ePlan
Not enough fire flow available.
The home is inside the defensible space.
Emailed contractor failed review
|
Route to Impact Fee Review | 9/6/2018 | 9/9/2018 | 9/7/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - MECHANICAL | 9/6/2018 | | 9/7/2018 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 9/6/2018 | | 9/6/2018 | | PASS |
Jeff Lowe
|
|
|
|
Routing - Addressing | 9/6/2018 | | 9/6/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 9/6/2018 | | 9/6/2018 | | PASS |
Rachael Beierle
|
|
|
|
Meeting | | | 9/6/2018 | | DONE |
|
|
|
Per Melissa she does not need to review these plans. Gate City
|
Plans ACCEPTED BY PLAN TECH | | | 9/6/2018 | | DONE |
|
|
|
|
Intake Approval | | | 9/6/2018 | | PASS |
|
|
|
|
Override - Parcel Holds | | | 9/6/2018 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/6/2018 | | DONE |
|
|
|
|
Application received | | | 9/5/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 5 2018 2:50PM
|