BLD-Final | 10/26/2018 | 10/29/2018 | 10/29/2018 | A | PASS |
Jim Sly
|
|
|
Tracy Phone #: ###-####
|
DOC - Permit Finaled | 10/29/2018 | 10/29/2018 | 10/29/2018 | P | PASS |
Jim Sly
|
|
|
|
BLD-Framing/Rough-in | 9/25/2018 | 9/26/2018 | 9/26/2018 | A | PASS |
Jim Sly
|
|
|
Kathlen Phone #: ###-#### Header above window....OK. Temp glass verified.
|
BLD-Framing/Rough-in | 9/24/2018 | 9/25/2018 | 9/25/2018 | A | CANC |
Jim Storey
|
|
|
Katherine Phone #: ###-####
|
Issue PAID IN FULL permit | | | 9/14/2018 | | DONE |
|
|
|
|
Plan assigned to (JAB) Josh | 9/6/2018 | 9/6/2018 | 9/10/2018 | | PASS |
Josh Bogle
|
|
|
09/12 window header, paper
|
Routing - PLAN CHECK | 9/6/2018 | | 9/10/2018 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 9/10/2018 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 9/10/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 9/10/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/10/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 9/10/2018 | | DONE |
|
|
|
|
Telephone call | | | 9/10/2018 | | DONE |
|
|
|
Spoke with Toby informing him this permit is ready and the fee amount due for issuance
|
Plans ACCEPTED BY PLAN TECH | | | 9/6/2018 | | DONE |
|
|
|
|
Intake Approval | | | 9/6/2018 | | PASS |
|
|
|
|
Application received | | 9/6/2018 | | | |
|
|
|
|