BLD-Final | 11/19/2019 | 11/20/2019 | 11/20/2019 | A | PASS |
Mike Jordan
|
|
|
Dwight Phone #: ###-####
|
DOC - Permit Finaled | 11/20/2019 | 11/20/2019 | 11/20/2019 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Blower Door Test Results | 11/20/2019 | 11/20/2019 | 11/20/2019 | A | DONE |
Mike Jordan
|
|
|
4.2
|
BLD-Final | 11/14/2019 | 11/15/2019 | 11/15/2019 | A | FAIL |
Mike Jordan
|
|
|
Dwight Phone #: ###-####. Install driveway, provide returns on handrails, provide additional guard in stair rail, provide blower door results.
|
BLD-Final | 11/6/2019 | 11/6/2019 | 11/6/2019 | P | NR |
Mike Jordan
|
|
|
Dwight Phone #: ###-####. Needs plumbing and mech. finals first.
|
BLD-Energy code compliance | 7/29/2019 | 7/30/2019 | 7/30/2019 | A | PASS |
Mike Jordan
|
|
|
Dwight Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 7/24/2019 | 7/25/2019 | 7/25/2019 | A | PASS |
Brandon Shaw
|
|
|
trusses // Dwight Phone #: ###-####
|
BLD-Framing/Rough-in | 7/19/2019 | 7/23/2019 | 7/23/2019 | A | NR |
Dave Hannah
|
|
|
dEWIT Phone #: ###-#### needs truss engineering on site
|
BLD-Foundation | 6/17/2019 | 6/18/2019 | 6/18/2019 | A | PASS |
Mike Jordan
|
|
|
portico // Dwight Phone #: ###-####. Non shrink grout under column bases for portico.
|
BLD-Wall Bracing | 5/15/2019 | 5/16/2019 | 5/16/2019 | P | PASS |
Mike Jordan
|
|
|
Eddy Phone #: ###-####
|
BLD-Foundation | 3/11/2019 | 3/12/2019 | 3/12/2019 | A | PASS |
Mike Jordan
|
|
|
As early as possible Phone #: 2088708888 >> Inspection requested via mobile web by Wes
|
BLD-Foundation | 3/8/2019 | 3/11/2019 | 3/11/2019 | P | NR |
Mike Jordan
|
|
|
As early as possible Phone #: 2088708888 >> Inspection requested via mobile web by Wes
|
BLD-Footing | 3/6/2019 | 3/7/2019 | 3/7/2019 | P | PASS |
Mike Jordan
|
|
|
Wes Phone #: ###-####
|
BLD-Footing | 3/6/2019 | 3/6/2019 | 3/6/2019 | P | CANC |
Jim Storey
|
|
|
As late as possible Phone #: 2088708888 >> Inspection requested via mobile web by Wes
|
Issue PAID IN FULL permit | | | 2/7/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 9/27/2018 | | |
|
|
|
|
Plan assigned to (J_N) | 9/18/2018 | 9/18/2018 | 9/27/2018 | | DONE |
|
|
|
09/21 sfd L1 paper. 1st review complete 9/20, foundation footing size, foundation extend above grade, braced wall end conditions, special inspections form.
|
Case Summary (BLD) | | | 9/27/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 9/27/2018 | | 9/27/2018 | | PASS |
Michael Hanson
|
|
|
Per JJN review. MDH
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/27/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/27/2018 | | DONE |
|
|
|
Need
RP
|
Inspection Record Card- Bld | | | 9/27/2018 | | DONE |
|
|
|
|
Telephone call | | | 9/27/2018 | | DONE |
|
|
|
Left message for Dwight that permit is ready, fee amount due and need rp (his expired 2/2011)
|
Plan resubmittals received | | | 9/26/2018 | | DONE |
|
|
|
two copies of structural design stamped and taken to Jenny
|
Plan resubmittals received | | | 9/25/2018 | | DONE |
|
|
|
Two copies of sheets A-6, S-1.0 and S-4.0. Taken to Jenny
|
Routing - PLAN CHECK | 9/18/2018 | | 9/21/2018 | | FAIL |
Rob Patrick
|
|
|
As per JJN review
|
1st review completed | | | 9/20/2018 | | FAIL |
|
|
|
foundation footing, foundation walls extend 6" min, braced wall end conditions, 310 special inspections form needed.
|
Routing - MECHANICAL | 9/19/2018 | | 9/19/2018 | | PASS |
Troy James
|
|
|
|
Plan assigned to (RDP) | 9/10/2018 | 9/10/2018 | 9/18/2018 | | DEFR |
Rob Patrick
|
|
|
9/21 sfd L1 ePlan
|
Routing - MECHANICAL | 9/14/2018 | | 9/18/2018 | | FAIL |
Troy James
|
|
|
Need a complete manual j report. Left message with designer to email me a complete report.
|
Routing - PLANNING | 9/11/2018 | | 9/14/2018 | | PASS |
Susan Riggs
|
|
|
CAA18-00109 Susan Riggs
|
Route to Impact Fee Review | 9/10/2018 | 9/13/2018 | 9/11/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - Addressing | 9/10/2018 | | 9/11/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | | | 9/11/2018 | | PASS |
|
|
|
|
Intake Approval | | | 9/10/2018 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/10/2018 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/10/2018 | | DONE |
|
|
|
|
Application received | | 9/10/2018 | | | |
|
|
|
|