Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD18-03304
StatusFinaled
Name YMC INC
Site Address 8000 S FEDERAL WAY
Project NameAT&T Wireless
Customer Number 
ePlanReviewYes
Description
(AT&T – MICRON - OUTSIDE DISTRIBUTED ANTENNA SYSTEM) Permit for the addition of AT&T antennas to the existing rooftop penthouse equipment room of building #26 within the Micron compound. Approval is contingent upon adhering to the approved plans on file and attached engineering. Work to include: installation of (3) new 6.5’ panel antennas and (1) GPS antenna on the exterior of the rooftop penthouse, installation of (6) RRH units mounted on new steel frame within the interior of the rooftop penthouse equipment room, installation of (1) new equipment rack within the rooftop penthouse equipment room, installation of (1) new armored fiber cable from the existing equipment IDAS room to new rooftop equipment rack and associated rooftop raceway to new rooftop equipment rack, adding (2) steel support reinforcements under new equipment rack. Note: antenna mount, RRH unit mounts, steel frames and steel support reinforcement are engineer designed, Structural engineering and plans provided. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/5/20196/6/20196/6/2019APASS
DetailsJim Storey
Please contact Russ at least 30 min prior to inspection, thank you. Phone #: ###-#### Inspection requested via web by Rhonda Marcum
DOC - Permit Finaled6/6/20196/6/20196/6/2019PPASS
DetailsJim Storey
FIRE-Final Inspection5/13/20195/17/20195/17/2019APASS
DetailsMark Scharfen
Conducted fire life safety. Checked battery rack and fire extinguisher. Passed. Note: Contractor was not given stamped plans. No approved plans on site.

Please call Russ at least 30 min prior to inspection, thank you. Phone #: ###-#### Inspection requested via web by Rhonda Marcum
BLD-Final3/13/20193/14/20193/14/2019ANR
DetailsJim Storey
Please call Russ Wood, thank you! Phone #: ###-#### Inspection requested via web by Rhonda Marcum need ele permit and fire insp per plan reviewer.
BLD-Final12/4/201812/10/201812/10/2018ANR
DetailsMike Jordan
Please call Russ with any questions, Thank YOU! Phone #: ###-#### Inspection requested via web by Rhonda Marcum. Needs to provide 3rd. party inspections on ll field welding.
Inspection Record Card- Bld  11/15/2018 DONE
Issue PAID IN FULL permit  11/15/2018 DONE
Plan assigned to (JG)10/2/201810/2/201810/16/2018 PASS
DetailsJavier Guzman
10/15 L2 AT&T ePlan, pend eng
Routing Off Site - STRUCTURAL10/2/2018 10/16/2018 PASS
DetailsJavier Guzman
signed off in ePlan by AHJ Engineers Chris Holladay
PLANS/APPL TAKEN TO FRONT DESK  10/16/2018 DONE
Permit Ready to Issue  10/16/2018 DONE
email permit to jfouts@ymcinc.com
1st review completed  10/15/2018 DONE
DetailsJavier Guzman
Routing - PLAN CHECK10/2/2018 10/13/2018 PASS
DetailsJavier Guzman
Routing - PLANNING10/2/2018 10/2/2018 PASS
DetailsNicolette Womack
Intake Approval  10/2/2018 PASS
DetailsJavier Guzman
Intake Approval  9/25/2018 FAIL
DetailsJavier Guzman
Provide and upload the following:
• Plans drawn on 18”x24” minimum size plan sheets. (currently 23 drawing plans on 11” x 17”)
• Plan sheets E1.1, RF1.0, RF1.1 are required to stamped by the Idaho licensed engineer
• Provide a completed special inspection form 310 found at our website at https://pds.cityofboise.org/media/104147/final310_special_inspections.pdf for the welding found at the platform reinforcement on plan sheet S1.5 and connections details found on plan sheet S1.4
Application received  9/10/2018 DONE
Application submitted via PDS Online on Sep 10 2018 4:48PM
First Notice6/6/20196/6/2019   
DetailsJim Storey