First Notice | 12/11/2018 | 12/11/2018 | 12/13/2018 | | DONE |
Brandon Shaw
|
|
|
mailed 12-14
|
BLD-Final | 12/7/2018 | 12/11/2018 | 12/11/2018 | P | PASS |
Brandon Shaw
|
|
|
John Phone #: ###-####
|
DOC - Permit Finaled | 12/11/2018 | 12/11/2018 | 12/11/2018 | P | PASS |
Brandon Shaw
|
|
|
|
FIRE-Final Inspection | 12/7/2018 | 12/11/2018 | 12/11/2018 | A | PASS |
Jim Page
|
|
|
Space is now back to a vanilla TI space with no occupancy, modifications will be required for the fire alarm system with future occupants, no modifications required for the fire sprinkler system in vanilla TI section for this permit. Life fire safety inspection for vanilla TI complete. As stated, no occupancy allowed under this permit. John Phone #: ###-####252
|
BLD-Final | 11/28/2018 | 11/29/2018 | 11/29/2018 | P | NR |
Mike Jordan
|
|
|
jon Phone #: ###-####. fire/life/safety has failed.
|
FIRE-Final Inspection | 11/28/2018 | 11/29/2018 | 11/29/2018 | A | FAIL |
Troy Cobbley
|
|
|
Space is supposed to be a vanilla but is actually occupied and I noted issues with the fire alarm notification being overspaced and alot of cables taped to the floor (temp. wiring)
jon Phone #: ###-####
|
Inspection Record Card- Bld | | | 10/9/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 9/28/2018 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/28/2018 | | DONE |
|
|
|
|
Route to Impact Fee Review | 9/25/2018 | 9/28/2018 | 9/26/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Permit Ready to Issue | | | 9/26/2018 | | DONE |
Christina Prado
|
|
|
All met -
DO NOT ISSUE W/OUT BLD18-03196
|
Plan assigned to (JG) | 9/12/2018 | 9/12/2018 | 9/25/2018 | | PASS |
Javier Guzman
|
|
|
9/24 L2 Vanilla from ePlan BLD18-03196
|
Routing - PLAN CHECK | 9/12/2018 | | 9/25/2018 | | PASS |
Javier Guzman
|
|
|
|
1st review completed | | | 9/25/2018 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/25/2018 | | DONE |
|
|
|
|
Routing - Addressing | 9/12/2018 | | 9/13/2018 | | PASS |
Doug Chausow
|
|
|
Suite 130
|
Routing - PUBLIC WORKS | 9/12/2018 | | 9/12/2018 | | PASS |
Morgan Webb
|
|
|
|
Intake Approval | | | 9/12/2018 | | |
|
|
|
|
Intake Approval | | | 9/11/2018 | | PASS |
Javier Guzman
|
|
|
|
Application received | | 9/12/2018 | | | |
|
|
|
|