Information based on query as of Wednesday, August 14, 2024.
Permit Information
Permit NumberBLD18-03347
StatusFinaled
Name SHADEWORKS INC
Site Address 2929 S GREBE PL
Project NameMILLER pergolas
Customer Number 
ePlanReviewYes
Description
HILLSIDE - Permit for two pre-engineered metal pergolas. One pergola will be 17'x14' with 16" footings, attached to the house wall. The other will be 10'x12' with 15" footings, attached to the eaves. All work per plans, engineering, manufacturer’s specs, & local code. **JAB**
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/29/201810/30/201810/30/2018APASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by David Dexter
DOC - Permit Finaled10/30/201810/30/201810/30/2018PPASS
DetailsBrandon Shaw
BLD-Footing10/23/201810/23/201810/23/2018PPASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by David Dexter
PubWorks Subgrade Approval10/23/201810/23/201810/23/2018 DONE
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
BLD-Footing10/10/201810/11/201810/11/2018PFAIL
DetailsBrandon Shaw
Need Sub grade inspection submitted and approved by PW...
Permit Ready to Issue  9/19/2018 DONE
Issue PAID IN FULL permit  9/19/2018 DONE
Inspection Record Card- Bld  9/19/2018 DONE
Plan assigned to (JAB) Josh9/13/20189/13/20189/18/2018 PASS
DetailsJosh Bogle
09/19 pergola, ePlan - Hillside
Routing - PLAN CHECK9/13/2018 9/18/2018 PASS
DetailsJosh Bogle
1st review completed  9/18/2018 DONE
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  9/18/2018 DONE
DetailsJosh Bogle
ESC no - Energy no
Routing PW Grading-Hillside9/13/2018 9/14/2018 PASS
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Application received  9/13/2018 DONE
Application submitted via PDS Online on Sep 13 2018 11:01AM
Plans ACCEPTED BY PLAN TECH  9/13/2018 DONE
Intake Approval  9/13/2018 PASS
Recd Pcfee & Taken To Pln CK  9/13/2018 DONE
Routing - PLANNING9/13/2018 9/13/2018 PASS
DetailsSue Cummings
Routing - PUBLIC WORKS9/13/2018 9/13/2018 PASS
DetailsMorgan Webb