BLD-Final | 9/10/2019 | 9/11/2019 | 9/11/2019 | A | PASS |
Dave Hannah
|
|
|
Leroy Phone #: ###-####
|
DOC - Permit Finaled | 9/11/2019 | 9/11/2019 | 9/11/2019 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 10/22/2018 | 10/25/2018 | 10/25/2018 | A | PASS |
Jim Storey
|
|
|
Leroy Phone #: ###-#### ok pending ele/ wire sds bottom of stair and bedroom
|
Plan assigned to (JAB) Josh | 9/26/2018 | 9/26/2018 | 9/26/2018 | | PASS |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 9/26/2018 | | 9/26/2018 | | PASS |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 9/26/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/26/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 9/26/2018 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 9/26/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/26/2018 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 9/26/2018 | | DONE |
|
|
|
plan mod to add 2 egress windows-sent to JAB
|
Routing Walk-In (Zoning) | 9/14/2018 | 9/14/2018 | 9/14/2018 | P | PASS |
Katelyn Menuge
|
|
|
No DR required for single family home
|
Routing Walk-In (BLD) | 9/14/2018 | 9/14/2018 | 9/14/2018 | P | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 9/14/2018 | | 9/14/2018 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 9/14/2018 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 9/14/2018 | | JAB |
|
|
|
|
Case Summary (BLD) | | | 9/14/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/14/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 9/14/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 9/14/2018 | | DONE |
|
|
|
|
Application received | | 9/14/2018 | | | |
|
|
|
|