Second Notice | | 4/18/2019 | 5/6/2019 | | DONE |
|
|
|
mailed 5-10-19
|
First Notice | | 4/1/2019 | 4/8/2019 | | DONE |
|
|
|
mailed 4-11-19
|
BLD-Final | 3/22/2019 | 3/22/2019 | 3/22/2019 | P | PASS |
Tony Young
|
|
|
Fire Life Safety final requested. Final Building inspection requested for late afternoon, after/during Fire Life Safety. Phone #: ###-#### Inspection requested via web by Greg Hedin
|
FIRE-Final Inspection | 3/22/2019 | 3/22/2019 | 3/22/2019 | P | PASS |
Jim Page
|
|
|
Previously noted items have been corrected, final life fire safety inspection complete.
Fire Life Safety final requested. Phone #: ###-#### Inspection requested via web by Greg Hedin
|
Permanent Occupancy | | | 3/22/2019 | | DONE |
|
|
|
|
BLD-Final | 3/14/2019 | 3/15/2019 | 3/15/2019 | A | CANC |
Tony Young
|
|
|
Greg Phone #: ###-####
|
FIRE-Final Inspection | 3/14/2019 | 3/14/2019 | 3/14/2019 | P | FAIL |
Jim Page
|
|
|
Mag lock access control needs to be integrated with the fire alarm system for door release under general water flow alarm. Ceiling fan on main floor needs to be integrated with the fire alarm panel to shut down on general water flow alarm per manufacture instructions. Provide emergency egress lighting for exit discharge as shown on city approved drawings. Verfiy CFM of newly installed HVAC unit, if unit moves more than 2000CFM then an in-duct smoke detector will be required for unit shutdown. Modifications to the fire alarm system requires a permit.
Greg Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 3/5/2019 | 3/5/2019 | 3/5/2019 | P | PASS |
Tony Young
|
|
|
Request ceiling grid inspection for cover, this afternoon. Phone #: ###-#### Inspection requested via web by Greg Hedin
|
BLD-Framing/Rough-in | 2/4/2019 | 2/5/2019 | 2/5/2019 | P | PART |
Tony Young
|
|
|
request rough framing inspection for cover. Phone #: ###-#### Inspection requested via web by Greg Hedin,, walls ok
|
(F) Reprint permit | | | 12/27/2018 | | DONE |
|
|
|
|
Place hold on job | 12/26/2018 | | 12/26/2018 | | DONE |
Brittany Hill
|
|
|
NEED TO PAY $46.31 ON BLD18-04479
***NO INSPECTION ALLOWED UNTIL COMPLETED ^^^^****
|
Telephone call | | | 12/26/2018 | | DONE |
|
|
|
Spoke with Jim informing him that we still need the 302 and 306 for the early start permit on BLD18-04479 and the fee of $46.31 needs to be paid. State a hold will be put on this permit and no inspection can be called in until those items are sent in and fee paid
|
Issue PAID IN FULL permit | | | 12/21/2018 | | DONE |
|
|
|
emailed jimraines@datumconstruction.com; keithjones@datumconstruction.com to sign permit
both emails came back so called John-left message on his cell-the other number on file has a mail box that is full-sent Brice the permit to sign and send back 12-27-18 CAN
|
Print Occupancy Form | | | 12/21/2018 | | DONE |
|
|
|
|
(F) Reprint permit | | | 12/21/2018 | | DONE |
|
|
|
|
(F) Reprint permit | | | 12/21/2018 | | DONE |
|
|
|
|
Plan assigned to (JAR) | 11/4/2018 | 11/4/2018 | 12/20/2018 | | DONE |
Julie Romig
|
|
|
1st Rev Comp - L3 Workout Anytime TI
|
Routing - PLAN CHECK | 12/19/2018 | | 12/20/2018 | | PASS |
Julie Romig
|
|
|
|
Routing - PLUMBING | 12/19/2018 | | 12/20/2018 | | PASS |
Daryl Spivey
|
|
|
Install ASSE 1070 tempering device on lavs per 403.7 ISPC.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/20/2018 | | |
|
|
|
|
Permit Ready to Issue | | | 12/20/2018 | | DONE |
|
|
|
need:
ACHD
GC - met
Cert. Value- met
|
Routing - PLAN CHECK | 12/14/2018 | | 12/19/2018 | | FAIL |
Julie Romig
|
|
|
Plan review report emailed to applicant
|
Routing - MECHANICAL | 12/14/2018 | | 12/18/2018 | | PASS |
Troy James
|
|
|
Need mechanical Comcheck.
|
Routing - PLUMBING | 12/14/2018 | | 12/18/2018 | | PASS |
Daryl Spivey
|
|
|
1) provide ASSE 1070 tempering device on lavs.
2) May require additional water service protection.
|
Routing - Design Review | 12/14/2018 | | 12/17/2018 | | PASS |
Josh Wilson
|
|
|
Ok per CZC18-00236
|
Routing - PUBLIC WORKS | 12/14/2018 | | 12/17/2018 | | PASS |
Morgan Webb
|
|
|
|
Route to Impact Fee Review | 12/3/2018 | 12/6/2018 | 12/3/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing - FIRE | 11/4/2018 | 11/4/2018 | 12/3/2018 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
Routing - PLAN CHECK | 11/4/2018 | | 11/26/2018 | | FAIL |
Julie Romig
|
|
|
IBC Plan Review Report emailed to architect.
|
1st review completed | | | 11/26/2018 | | FAIL |
Julie Romig
|
|
|
|
Routing - PLUMBING | 11/8/2018 | | 11/8/2018 | | PASS |
Dan Ediger
|
|
|
Per plans and ISPC
|
Routing - PLANNING | 11/4/2018 | | 11/6/2018 | | PASS |
Leon Letson
|
|
|
|
Routing - Design Review | 11/6/2018 | | 11/6/2018 | | FAIL |
Josh Wilson
|
|
|
Certificate of Zoning Compliance required for exterior building modifications
|
Routing - PUBLIC WORKS | 11/4/2018 | | 11/6/2018 | | PASS |
Angela Hardy
|
|
|
|
Routing - Addressing | 11/4/2018 | | 11/5/2018 | | PASS |
Doug Chausow
|
|
|
|
Intake Approval | | | 10/31/2018 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 9/19/2018 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
sending back to pre screen No DR approval
|
Intake Approval | | | 9/19/2018 | | FAIL |
Michael Hanson
|
|
|
This permit has failed prescreen due to the following:
1. Provide design review approval letter for exterior modifications.
|
Application received | | | 9/17/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 17 2018 1:47PM
|