BLD-Blower Door Test Results | 9/16/2019 | 9/16/2019 | 9/16/2019 | P | DONE |
Tell Riley
|
|
|
4.06 ACH 50 1166 CFM @ 50 PA
|
BLD-Final | 9/13/2019 | 9/13/2019 | 9/16/2019 | P | PASS |
Tell Riley
|
|
|
Damion Phone #: ###-####//corrections made//
|
DOC - Permit Finaled | 9/16/2019 | 9/16/2019 | 9/16/2019 | P | PASS |
Tell Riley
|
|
|
|
BLD-Final | 9/11/2019 | 9/11/2019 | 9/11/2019 | P | FAIL |
Tell Riley
|
|
|
call for access // Damion Phone #: ###-####//second story layout does not reflect plans//added room upstairs// add step at garage man door//need blower door test//no crawl space access// see correction notice//
|
BLD-Framing/Rough-in | 2/21/2019 | 2/22/2019 | 2/22/2019 | A | PASS |
Jim Sly
|
|
|
Damion Phone #: ###-#### Frame and Energy pass.
|
BLD-Framing/Rough-in | 2/20/2019 | 2/20/2019 | 2/20/2019 | P | PART |
Jim Storey
|
|
|
Damon Phone #: ###-#### colm plm drilled thur 5 ply nee approval/ other isued marked on truss engineering// ok to insulate.
|
BLD-Wall Bracing | 1/30/2019 | 1/30/2019 | 1/30/2019 | P | PASS |
Jim Sly
|
|
|
Bob Phone #: ###-####
|
BLD-Foundation | 12/6/2018 | 12/7/2018 | 12/7/2018 | A | PASS |
Jim Sly
|
|
|
wall // Damion Phone #: ###-####
|
BLD-Footing | 11/19/2018 | 11/20/2018 | 11/20/2018 | P | PASS |
Jim Sly
|
|
|
Damion Phone #: ###-####
|
Issue PAID IN FULL permit | | | 11/19/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/19/2018 | | DONE |
|
|
|
|
Telephone call | | | 11/19/2018 | | DONE |
|
|
|
emailed damion@groupone.com permit to be signed
|
OVERRIDE | | | 11/5/2018 | | |
|
|
|
|
Routing - PLANNING | 11/2/2018 | | 11/5/2018 | | PASS |
Sue Cummings
|
|
|
|
Routing - PLAN CHECK | 11/5/2018 | | 11/5/2018 | | PASS |
Michael Hanson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/5/2018 | | DONE |
Michael Hanson
|
|
|
|
Permit Ready to Issue | | | 11/5/2018 | | DONE |
|
|
|
|
Plan assigned to (M_H) | 9/17/2018 | | 11/5/2018 | | DONE |
Michael Hanson
|
|
|
09/27 #402 L1 ePlan. 1st review completed - See changemarks and blue notes in ePlan. MDH 2nd review completed - See changemark in ePlan. MDH
|
Routing - PLAN CHECK | 11/1/2018 | | 11/1/2018 | | FAIL |
Michael Hanson
|
|
|
Structural deficiences. MDH
|
Routing - PLAN CHECK | 10/22/2018 | | 10/22/2018 | | FAIL |
Michael Hanson
|
|
|
Structural defeciences. MDH
|
Plan Reviewer's activity | | | 10/22/2018 | | DONE |
Michael Hanson
|
|
|
Phone call with applicant help them navigate the system and let them know of the tall wall calc's required per the plans. MDH
|
Routing - PLAN CHECK | 10/16/2018 | | 10/16/2018 | | FAIL |
Michael Hanson
|
|
|
Provide required tall wall engineering as noted. MDH
|
Routing - PLANNING | 10/3/2018 | | 10/3/2018 | | PASS |
Sue Cummings
|
|
|
No variance required as per Hal and Todd
|
1st review completed | | | 9/25/2018 | | FAIL |
Michael Hanson
|
|
|
See changemarks and blue notes in ePlan. MDH
|
Routing - PLAN CHECK | 9/17/2018 | | 9/25/2018 | | FAIL |
Michael Hanson
|
|
|
See changemarks and blue notes in ePlan. MDH
|
Routing - MECHANICAL | 9/17/2018 | | 9/19/2018 | | PASS |
Troy James
|
|
|
|
Route to Impact Fee Review | 9/17/2018 | 9/20/2018 | 9/18/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - PUBLIC WORKS | 9/17/2018 | | 9/18/2018 | | PASS |
Morgan Webb
|
|
|
|
Routing - PLANNING | 9/17/2018 | | 9/18/2018 | | FAIL |
Sue Cummings
|
|
|
Requires a variance for driveway in rear setback.
|
Application received | | | 9/17/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 17 2018 1:51PM
|
Recd Pcfee & Taken To Pln CK | | | 9/17/2018 | | DONE |
|
|
|
|
Intake Approval | | | 9/17/2018 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/17/2018 | | DONE |
|
|
|
|
Routing - Addressing | 9/17/2018 | | 9/17/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PLANNING | 10/29/2018 | | | | FAIL |
|
|
|
He changed the site plan and location of the garage. Site plan shows the landsace buffer in front of the garage. Will submit new
|