Second Notice | | 7/18/2020 | 8/11/2020 | | DONE |
|
|
|
mailed 8-14-2020
|
First Notice | | 5/18/2020 | 7/8/2020 | | DONE |
|
|
|
maileed 7-9-2020
|
BLD-Final | 5/7/2020 | 5/8/2020 | 5/8/2020 | P | PASS |
Tony Young
|
|
|
Jon Phone #: ###-####
|
FIRE-Final Inspection | 5/8/2020 | 5/8/2020 | 5/8/2020 | P | PASS |
Jim Page
|
|
|
Previously noted items have been corrected, fire sprinkler inspection is complete, fire alarm inspection is complete, fire extinguishers are placed with current inspection tags. Final life fire safety inspection is complete, signatures provided on permit sign off card.
Jon *screened* Phone #: ###-####
|
Print Occupancy Form | | | 5/8/2020 | | DONE |
|
|
|
|
Permanent Occupancy | | | 5/8/2020 | | DONE |
|
|
|
|
BLD-Final | 5/6/2020 | 5/7/2020 | 5/7/2020 | P | NR |
Tony Young
|
|
|
Jon Phone #: ###-####
|
BLD-Final | 5/6/2020 | 5/6/2020 | 5/7/2020 | P | PEND |
Tony Young
|
|
|
Jon Phone #: ###-####.. needs fire/ life/saftey
|
BLD-Final | 5/5/2020 | 5/5/2020 | 5/6/2020 | P | NR |
Tony Young
|
|
|
Jon Phone #: ###-####,, needs f/l/s
|
BLD-Final | 5/4/2020 | 5/5/2020 | 5/5/2020 | A | PEND |
Tony Young
|
|
|
Jon Phone #: ###-####// needs Fire and life safety
|
FIRE-Final Inspection | 5/4/2020 | 5/5/2020 | 5/5/2020 | A | FAIL |
Jim Page
|
|
|
Provide exit/e,emergency light that was shown in the basement that is noted on the city approved drawings as not placed. Provide egress light in basement that is noted on the city approved drawings as not placed. Provide signage for the fire sprinkler riser room and fire alarm control panel (FACP is acceptable). Provide code compliant door hardware on two storage rooms, basement level, rooms noted on city approved drawings have round type door hardware.
Jon Phone #: ###-####
|
BLD-Final | 4/30/2020 | 5/4/2020 | 5/4/2020 | A | NR |
Tony Young
|
|
|
Jon Phone #: ###-####// needs f/l/s and mech. 1st
|
BLD-Conference | 3/5/2020 | 3/9/2020 | 3/9/2020 | A | PART |
Tony Young
|
|
|
verify status on building/ permit,, walk through with owner,, needs trades and needs an electrical permit,, talked with concrete guys doing new steps up to the building,, work in progress
|
BLD-Conference | 3/3/2020 | 3/4/2020 | 3/5/2020 | P | PEND |
Tony Young
|
|
|
verify status on building/ permit,, met with owner,, all is ok except needs a electrical permit and inspections,, will try to get all finaled within 2 weeks
|
BLD-Conference | 3/3/2020 | 3/3/2020 | 3/3/2020 | P | PEND |
Tony Young
|
|
|
verify status on building/ permit// no one around
|
Telephone call | | | 3/4/2019 | | DONE |
|
|
|
Spoke with Jon informing him that this permit will expiring 3/16/19, stated what the fee amount is and what can be done if he is not ready to pick up the permit
|
Print Occupancy Form | | | 3/4/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 3/4/2019 | | DONE |
|
|
|
|
Expiration Notice | 2/25/2019 | 3/18/2019 | 2/25/2019 | | DONE |
Brittany Hill
|
|
|
|
Plan assigned to (CJW) | 10/4/2018 | 10/4/2018 | 11/6/2018 | | PASS |
Carl Westfall
|
|
|
* 10/22/18 (L3 - 15 days) (ePlan - 15 sheets) Bomb Shelter
|
Routing - PLAN CHECK | 10/4/2018 | | 11/6/2018 | | PASS |
Carl Westfall
|
|
|
Drawings approved with referenced code sections
|
1st review completed | | | 11/6/2018 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/6/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/6/2018 | | DONE |
|
|
|
NEED
GC FORM (owner Jon; applicant)
|
Routing - FIRE | 10/4/2018 | 10/4/2018 | 11/5/2018 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
Routing PW Grading-Hillside | 10/4/2018 | | 10/10/2018 | | CANC |
Melissa Jannusch
|
|
|
Interior only no hillside review required
|
Routing - MECHANICAL | 10/4/2018 | | 10/9/2018 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 10/4/2018 | | 10/8/2018 | | PASS |
Nicolette Womack
|
|
|
|
Routing - Addressing | 10/4/2018 | | 10/5/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 10/4/2018 | | 10/4/2018 | | PASS |
Morgan Webb
|
|
|
|
Intake Approval | | | 10/2/2018 | | PASS |
|
|
|
|
Application received | | | 9/17/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 17 2018 2:25PM
|
Third Notice | | 8/16/2020 | | | |
|
|
|
|