BLD-Final | 12/26/2019 | 12/27/2019 | 12/27/2019 | P | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Ken Litzinger
|
DOC - Permit Finaled | 12/27/2019 | 12/27/2019 | 12/27/2019 | P | PASS |
Dave Hannah
|
|
|
|
PubWorks Occupancy Approval | 12/27/2019 | 12/27/2019 | 12/27/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s design professional indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Grading Inspection | 12/19/2019 | 12/19/2019 | 12/23/2019 | P | CANC |
Dave Hannah
|
|
|
Inspection requested via web by Ken Litzinger
|
BLD-Energy code compliance | 5/21/2019 | 5/22/2019 | 5/22/2019 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Ken Litzinger ok to sheetrock after fire sprinkler oks
|
BLD-Framing/Rough-in | 5/20/2019 | 5/20/2019 | 5/21/2019 | P | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Ken Litzinger c/n on site ok to insulate
|
BLD-Wall Bracing | 4/9/2019 | 4/10/2019 | 4/10/2019 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Ken Litzinger
|
BLD-Foundation | 1/30/2019 | 1/30/2019 | 1/30/2019 | P | PASS |
Dave Hannah
|
|
|
Giber Phone #: ###-####
|
BLD-Footing | 1/28/2019 | 1/28/2019 | 1/28/2019 | P | PASS |
Dave Hannah
|
|
|
giber Phone #: ###-####
|
PubWorks Subgrade Approval | 1/28/2019 | 1/28/2019 | 1/28/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
BLD-Foundation | 1/3/2019 | 1/4/2019 | 1/4/2019 | A | PASS |
Brandon Shaw
|
|
|
Work in progress... Frost protection is required...
|
BLD-Footing | 12/20/2018 | 12/21/2018 | 12/21/2018 | A | PART |
Dave Hannah
|
|
|
Gibr Phone #: ###-#### basement ftgs ok to pour
|
PubWorks Subgrade Approval | 12/21/2018 | 12/21/2018 | 12/21/2018 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Issue PAID IN FULL permit | | | 11/30/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/30/2018 | | DONE |
|
|
|
|
Plan assigned to (J_N) | 11/5/2018 | 11/5/2018 | 11/29/2018 | | DONE |
|
|
|
11/26 sfd L2 ePlan. 2nd review 11/27, wall bracing first floor, cs-wsp length, holddown, verify header, engineer stamp foundation plan. 1st review complete 11/19, show girder trusses, bracing calculations, bracing length, wui soffit detail, basement dampproofing, decking material, patio footing detail.
|
Routing - FIRE | 11/5/2018 | 11/5/2018 | 11/29/2018 | | PASS |
Lee G Meredith
|
|
|
New SFH
See 1st fire review comments.
11-29-18 applicant added a note to the cover sheet indicating that NFPA 13D fire protection will be provided.
|
Routing - PLAN CHECK | 11/29/2018 | | 11/29/2018 | | PASS |
Jenny Nelson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/29/2018 | | DONE |
Jenny Nelson
|
|
|
|
Permit Ready to Issue | | | 11/29/2018 | | DONE |
|
|
|
met
|
Routing - PLAN CHECK | 11/27/2018 | | 11/27/2018 | | FAIL |
Jenny Nelson
|
|
|
|
1st review completed | | | 11/19/2018 | | FAIL |
Jenny Nelson
|
|
|
show girder trusses, bracing calculations, bracing length, wui soffit detail, basement dampproofing, decking material, patio footing detail.
|
Routing - PLAN CHECK | 11/5/2018 | | 11/19/2018 | | FAIL |
Jenny Nelson
|
|
|
|
Routing PW Grading-Hillside | 11/6/2018 | | 11/16/2018 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
An erosion and sediment control site preparation inspection is required for this site. The site preparation inspection takes place after all required erosion and sediment control best management practices have been installed and BEFORE any earthwork takes place. Call ###-#### to schedule an inspection.
All disturbed slopes included in the construction of this project must be stabilized and approved by Public Works before a Final Occupancy Permit is granted. If weather conditions prohibit revegetation and stabilization activities, the contractor shall provide a bond/surety agreement or an irrevocable letter of credit in the amount of 110% of the cost estimated by the project engineer to enable stabilization of the site. Call ###-#### for an inspection.
|
Route to Impact Fee Review | 11/5/2018 | 11/8/2018 | 11/6/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - PUBLIC WORKS | 11/5/2018 | | 11/6/2018 | | PASS |
Morgan Webb
|
|
|
|
Routing - MECHANICAL | 11/5/2018 | | 11/6/2018 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 11/5/2018 | | 11/5/2018 | | PASS |
Sue Cummings
|
|
|
In Hillside
|
Routing - Addressing | 11/5/2018 | | 11/5/2018 | | PASS |
Doug Chausow
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 11/5/2018 | | DONE |
|
|
|
|
Intake Approval | | | 11/5/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/5/2018 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 11/5/2018 | | 11/5/2018 | | PASS |
Michael Zawacki
|
|
|
Foothills home, site prep inspection required.
|
Intake Approval | | | 10/30/2018 | | FAIL |
|
|
|
Stamp and signature did not fully come through on Structural Calculations and Missing Site Specific Fire Flow at Hydrants Letter from Suez Water
|
Application received | | | 9/18/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 18 2018 9:11AM
|