BLD-Final | 7/28/2020 | 7/29/2020 | 7/29/2020 | A | NR |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by chad christensen// needs trades,, driveway cut and hard surface or fire / zoning approval as is// smoke detector outside of bedrooms in 2nd area// (not a duplex,, see project scope)// firecaulking in firewalls// address visible from 28th// landings or steps at doors// firedoor// etc called and left a voicemail
|
BLD-Aging Inspection | 4/30/2020 | 4/30/2020 | 5/4/2020 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 4/29/2020 | 4/29/2020 | 4/30/2020 | | PEND |
Tony Young
|
|
|
|
BLD-Wall cover | 12/16/2019 | 12/17/2019 | 12/17/2019 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by chad christensen
|
BLD-Framing/Rough-in | 12/10/2019 | 12/11/2019 | 12/11/2019 | A | PART |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by chad christensen,, c/n posted,, ok to insulate,, needs to have full sprinkler pass prior to cover
|
BLD-Energy code compliance | 11/14/2019 | 11/14/2019 | 11/14/2019 | P | NR |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by chad christensen
|
BLD-Framing/Rough-in | 11/13/2019 | 11/13/2019 | 11/13/2019 | P | NR |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by chad christensen
|
BLD-Wall Bracing | 8/14/2019 | 8/15/2019 | 8/15/2019 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by chad christensen needs to add two hd hold downs each side of front door ok to cover ext
|
BLD-Foundation | 7/15/2019 | 7/15/2019 | 7/15/2019 | P | PASS |
Dave Hannah
|
|
|
Nate Phone #: ###-####
|
BLD-Footing | 7/9/2019 | 7/9/2019 | 7/9/2019 | P | PART |
Tony Young
|
|
|
Nate Phone #: ###-####,, work in progress,, setbacks appear ok,, pin on side is apparently in the tree,, contractor noted that he would take full responsibility via phone call with concrete guys phone
|
OVERRIDE | | | 7/1/2019 | | |
|
|
|
|
Routing - FIRE | 6/28/2019 | 6/28/2019 | 7/1/2019 | | PASS |
Mark Scharfen
|
|
|
Building shown with fire sprinklers. Uploaded rev_fire 07.01.2019.pdf.
|
Plan assigned to (J_N) | 5/16/2019 | 5/16/2019 | 7/1/2019 | | DONE |
Jenny Nelson
|
|
|
resubmitt/plan mod. 3rd, failed fire. 2nd review, failed planning, need engineering for pre-fab green house. 1st complete 5/20 not all plans match updated structure, failed planning, waiting on fire review
|
Permit Ready to Issue | | | 7/1/2019 | | DONE |
|
|
|
need GC form
|
Issue PAID IN FULL permit | | | 7/1/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/1/2019 | | DONE |
|
|
|
|
Routing - FIRE | 6/28/2019 | 6/28/2019 | 6/28/2019 | | FAIL |
Mark Scharfen
|
|
|
06.26.2019-Completed fire review, inadequate fire flow. uploaded rev_fire 06.28.2019.pdf.
|
Routing - FIRE | 6/21/2019 | 6/21/2019 | 6/27/2019 | | FAIL |
Mark Scharfen
|
|
|
completed fire review 06.27.2019. Uploaded rev_fire 06.27.2019.pdf and emailed to applicant.
|
Routing - PLANNING | 6/21/2019 | | 6/21/2019 | | PASS |
Sue Cummings
|
|
|
Only one kitched now
|
Routing - PLAN CHECK | 6/21/2019 | | 6/21/2019 | | PASS |
Jenny Nelson
|
|
|
|
Routing - FIRE | 5/31/2019 | 5/31/2019 | 6/10/2019 | | FAIL |
Mark Scharfen
|
|
|
06.10.2019-Completed fire review. uploaded rev_fire 06.10.2019.pdf and emailed applicant.
|
Routing - PLAN CHECK | 6/5/2019 | | 6/5/2019 | | FAIL |
Jenny Nelson
|
|
|
Need engineering for pre-fab green house. Failed planning due to 3 kitchens - needs approval for adu or duplex.
|
Routing - PLANNING | 5/31/2019 | | 5/31/2019 | | FAIL |
Sue Cummings
|
|
|
STILL HAS THREE KITCHENS. Please change the floor plan.
|
Routing - FIRE | 5/17/2019 | 5/17/2019 | 5/22/2019 | | FAIL |
Mark Scharfen
|
|
|
Completed review. Structure exceeds fd access, hydrant access and no fire flow letter. Uploaded rev_fire 05.22.2019.pdf and emailed contractor. Resubmittal required.
|
Routing - PLANNING | 5/17/2019 | | 5/20/2019 | | FAIL |
Sue Cummings
|
|
|
Structure still has three kitchens. Only one is allowed unless approval of an ADU or a duplex is approved.
|
Routing - PLAN CHECK | 5/16/2019 | | 5/20/2019 | | FAIL |
Jenny Nelson
|
|
|
Not all plans match structural updates
|
Plan resubmittals received | | | 5/16/2019 | | DONE |
|
|
|
Switching from slab to crawl space. (permit has never been issued)
|
Extend Review Timeline | | | 3/15/2019 | | DONE |
|
|
|
1st approved 180 day extension per adele. see documents
|
Meeting | | | 3/14/2019 | | DONE |
|
|
|
sent letter to alex informing this permit is going to expire soon and is welcome to send in a request for an extension. see documents
|
Meeting | | | 3/14/2019 | | DONE |
|
|
|
sent in request for extension
|
Expiration Notice | 2/25/2019 | 3/18/2019 | 2/25/2019 | | DONE |
Brittany Hill
|
|
|
|
Meeting | | | 11/19/2018 | | DONE |
|
|
|
Flynner Properties not longer working on project. Permit is now under parcel owner
|
OVERRIDE | | | 10/23/2018 | | |
|
|
|
|
Plan assigned to (J_N) | 10/9/2018 | 10/9/2018 | 10/23/2018 | | DONE |
Jenny Nelson
|
|
|
10/09 sfd L1 ePlan. 2nd review 10/22, emergency escape window master bed. 1st review 10/10 update code year, specify egress windows, show mech equip on plans, specify girder trusses, update wind speed
|
Routing - PLAN CHECK | 10/23/2018 | | 10/23/2018 | | PASS |
Jenny Nelson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/23/2018 | | DONE |
Jenny Nelson
|
|
|
|
Permit Ready to Issue | | | 10/23/2018 | | DONE |
|
|
|
MET-need GC form
received a letter from the parcel owner-i emailed him the GC form to fill out and send back
|
Routing - PUBLIC WORKS | 10/22/2018 | | 10/22/2018 | | PASS |
Beverly Mountain
|
|
|
|
Routing - PLAN CHECK | 10/22/2018 | | 10/22/2018 | | FAIL |
Jenny Nelson
|
|
|
Emergency escape window needed in master bedroom
|
Routing - PLANNING | 10/22/2018 | | 10/22/2018 | | PASS |
Sue Cummings
|
|
|
No ADU approval at this time
|
1st review completed | | | 10/10/2018 | | FAIL |
|
|
|
Update code year, egress windows, specify mech equipment on plans, specify girder trusses, update wind speed
|
Routing - PLAN CHECK | 9/25/2018 | | 10/10/2018 | | FAIL |
Michael Hanson
|
|
|
|
Plan assigned to (M_H) | 9/25/2018 | | 10/9/2018 | | DEFR |
Michael Hanson
|
|
|
10/09 #402 L1 ePlan
|
Route to Impact Fee Review | 9/25/2018 | 9/28/2018 | 9/26/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - MECHANICAL | 9/25/2018 | | 9/26/2018 | | PASS |
Chad Schwendiman
|
|
|
|
Routing - Addressing | 9/25/2018 | | 9/26/2018 | | PASS |
Doug Chausow
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/25/2018 | | DONE |
|
|
|
|
Intake Approval | | | 9/25/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/25/2018 | | DONE |
|
|
|
|
Intake Approval | | | 9/24/2018 | | FAIL |
|
|
|
9/25/18 took out bath & second kitchen, will apply for ADU once approval with zoning is complete
9/24/18
plans and documents good
NEED APPROVAL FROM PLANNING FOR THE ADU ON OTHER SIDE OF GARAGE
|
Application received | | | 9/18/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 18 2018 2:46PM
|
Routing - PUBLIC WORKS | 9/25/2018 | | | | FAIL |
Beverly Mountain
|
|
|
Per PW requirement verify structure does not encroach into existing Boise City Sanitary Sewer Easement. Called Kristy 9-25-18 bam
|
Routing - PLANNING | 9/25/2018 | | | | FAIL |
|
|
|
Too many kitchens. Only one is allowed. Need a separate floor plan
|