Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD18-03410
StatusFinaled
Name ST LUKES HEALTH SYSTEM LTD
Site Address 190 E BANNOCK ST
Project NameSt. Lukes Sleep Study Remodel
Customer Number 
ePlanReviewYes
Description
(ST. LUKE’S SLEEP STUDY REMODEL – 4TH STORY – WEST WING) The fire sprinkler system is used for high rise and for occupancy. To remodel two guest rooms to be used as sleep study exam rooms and to convert a former storage room located across the corridor into a sleep study control room. The total floor area of the remodel is about 632 square feet. Work is to include a low height wall, keypads or card readers to control access to rooms, ceiling mounted video cameras, a new hand sink in the sleep study control room, medical gas piping and controls, window coverings, and finishes. The fire-resistance-rating of the existing corridor is required to be maintained. Since the corridor serves guest sleeping units, it likely has 20-minute self-closing fire doors, smoke dampers, etc. At least one sleep study exam room, including its toilet / shower room, is required to be accessible to the disabled as defined by current accessibility standards. Emergency lighting within the common corridor is required to be operational. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 3/17/20194/12/2019 DONE
This permit finaled on the web by Curtis Weedop
First Notice 2/8/20193/7/2019 DONE
emailed curtis 3-7-19
Permanent Occupancy  1/29/2019 DONE
BLD-Final1/28/20191/28/20191/28/2019APASS
DetailsDave Hannah
Stan phone # 208 713 6975
BLD-Final1/24/20191/25/20191/28/2019ACANC
DetailsDave Hannah
Stan phone # 208 713 6975
BLD-Final1/25/20191/25/20191/28/2019PCANC
DetailsDave Hannah
Stan phone # 208 713 6975
BLD-Final1/23/20191/24/20191/24/2019PCANC
DetailsJim Sly
Stan Phone #: ###-####
Canc. by Contr.
FIRE-Final Inspection1/23/20191/24/20191/24/2019APASS
DetailsTroy Cobbley
life safety passed


Stan Phone #: ###-####
BLD-Ceiling Grid Inspection1/9/20191/10/20191/10/2019APASS
DetailsDave Hannah
4th floor sleep study // Stan Phone #: ###-####
Issue PAID IN FULL permit  11/5/2018  
Print Occupancy Form  11/5/2018 DONE
Route to Impact Fee Review10/15/201810/18/201810/16/2018 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Permit Ready to Issue  10/16/2018 DONE
Need
GC
Revised Certificate of Value
Plan assigned to (CJW)9/25/20189/25/201810/15/2018 PASS
DetailsCarl Westfall
(1st done) 10/11/18 (L3 - 15 days) (ePlan - 16 sheets) St. Lukes Sleep Study Room
Routing - FIRE9/25/20189/25/201810/15/2018 PASS
DetailsErika Akin
Attached comments to case
1st review completed  10/15/2018 DONE
PLANS/APPL TAKEN TO FRONT DESK  10/15/2018 DONE
Routing - PLAN CHECK9/25/2018 10/15/2018 PASS
DetailsCarl Westfall
Routing - MECHANICAL9/25/2018 9/27/2018 PASS
DetailsTroy James
Routing - PUBLIC WORKS9/25/2018 9/27/2018 PASS
DetailsBeverly Mountain
Routing - PLUMBING9/25/2018 9/26/2018 PASS
DetailsBill VanDegrift
Per plan and ISPC and NFPA 99.
Routing - Addressing9/25/2018 9/26/2018 PASS
DetailsDoug Chausow
Intake Approval  9/21/2018 PASS
Application received  9/19/2018 DONE
Application submitted via PDS Online on Sep 19 2018 8:09AM