BLD-Final | 4/23/2019 | 4/23/2019 | 4/23/2019 | A | PASS |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 4/23/2019 | 4/23/2019 | 4/23/2019 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Final | 4/22/2019 | 4/23/2019 | 4/23/2019 | A | CANC |
Mike Jordan
|
|
|
Matt Phone #: ###-####
|
BLD-Energy code compliance | 2/4/2019 | 2/4/2019 | 2/4/2019 | A | PASS |
Mike Jordan
|
|
|
Matt Ross ###-#### Phone #: ###-#### Inspection requested via web by David Webster
|
BLD-Energy code compliance | 2/1/2019 | 2/1/2019 | 2/1/2019 | P | FAIL |
Mike Jordan
|
|
|
Matt Phone #: 208-###-####-Matt said you still need to look at the engineering (?)report that wasn't there at frame. Nail off 3ply A3 girder truss per the engineering and install missed lateral bracing on A3 truss. Correction notice posted.
|
BLD-Energy code compliance | 1/25/2019 | 1/28/2019 | 1/28/2019 | P | CANC |
Mike Jordan
|
|
|
Job Freman - Matt Ross ###-#### Phone #: ###-#### >> Inspection requested via web by David Webster Inspection cancelled from web by: David Webster
|
BLD-Framing/Rough-in | 1/15/2019 | 1/16/2019 | 1/16/2019 | A | PART |
Mike Jordan
|
|
|
Site Foreman Matt Ross ###-#### Phone #: ###-#### Inspection requested via web by David Webster. Ok to insulate. Will provide truss engineering on energy inspection.
|
BLD-Wall Bracing | 12/5/2018 | 12/6/2018 | 12/6/2018 | A | PASS |
Brandon Shaw
|
|
|
Ok to cover exterior...
|
Issue PAID IN FULL permit | | | 10/3/2018 | | DONE |
|
|
|
|
Plan assigned to (JAB) Josh | 9/20/2018 | 9/20/2018 | 9/26/2018 | | PASS |
Josh Bogle
|
|
|
09/26 fire repair, paper
|
Routing - PLAN CHECK | 9/24/2018 | | 9/26/2018 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 9/26/2018 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 9/26/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 9/26/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/26/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 9/26/2018 | | DONE |
|
|
|
|
Telephone call | | | 9/26/2018 | | DONE |
|
|
|
left voicemail informing the permit is ready and what fees are due.
|
Routing - MECHANICAL | 9/20/2018 | | 9/24/2018 | | PASS |
Troy James
|
|
|
|
Routing Walk-In (BLD) | 9/20/2018 | 9/20/2018 | 9/20/2018 | P | PASS |
Josh Bogle
|
|
|
took in as level 2 for Mechanical Review
|
Application received | | 9/20/2018 | | | |
|
|
|
|