Information based on query as of Tuesday, July 23, 2024.
Permit Information
Permit NumberBLD18-03479
StatusFinaled
Name RRC CONTRACTORS
Site Address 904 W MAIN ST
Project NameMain Street Deli
Customer NumberBLD19-00130
ePlanReviewYes
Description
(MAIN STREET DELI) (TWO PERMITS IN EPLAN - BLD19-00130) **4th Review - Fees Due** Permit is to add approximately 830 sq. ft. of tenant space to the existing tenant space to bring the total new tenant area to: 1,930 sq. ft. Approval contingent upon adhering to the approved plans on file. Work to include: demolition of existing non-structural walls, remodel of dining/seating area, and finishes in compliance with chapter 8 of the 2015 IBC. NOTE: This prior C of O was issued under BLD15-00311. This building is fully fire sprinklered any alterations or modifications to the sprinkler system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA #13 as regulated by the fire department. **JHB**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 11/3/201911/26/2019 DONE
This permit finaled on the web by derek cooper
Third Notice 9/25/201910/29/2019 DONE
mailed 11-1 with second follow up
Second Follow up  10/29/2019 DONE
Third Notice 8/18/20199/20/2019 DONE
mailed 9-23-19 with first follow up letter
First Follow up  9/20/2019 DONE
Third Notice 7/15/20198/13/2019 DONE
mailed 8-13
Second Notice 6/20/20197/10/2019 DONE
mailed 7-11
First Notice 5/17/20196/10/2019 DONE
mailed 6-11
BLD-Final5/7/20195/7/20195/7/2019PPASS
DetailsDave Hannah
per Dave H. over the phone, inspection pass
Zack Phone #: ###-####
Permanent Occupancy  5/7/2019 DONE
BLD-Final4/19/20194/22/20194/22/2019APART
DetailsJim Storey
Zack Phone #: ###-#### health dept sign off/ mech permit resolved// ok to final upon all others sign offs
BLD-Final4/18/20194/19/20194/19/2019PNR
DetailsBrandon Shaw
Need to have permit and plans readily available...
Install all grab bars in ADA bathroom...
FIRE-Final Inspection4/18/20194/19/20194/19/2019APASS
DetailsMark Scharfen
Life saftey inspection complete. Zack will hang extinguishers before Building inspection.

Zack Phone #: ###-####
FIRE-Final Inspection4/16/20194/16/20194/16/2019PFAIL
DetailsTroy Cobbley
The contractor actually just wanted a conference. I noted that the project related fire sprinkler pemit has not been finaled and the city approved plans indicate panic hardware at the rear exit door so panic hardware may be required at the front exit door from the space. The plans indicate that hardware is to be provided if not existing but not what type of hardware. Will also need exit signs and emergency lights placed as per plans. It does not appear to be any fire alarm notification devices with-in the space. Phone #: ###-####
BLD-Ceiling Grid Inspection4/1/20194/2/20194/2/2019APASS
DetailsDave Hannah
Zack Phone #: ###-####
BLD-Ceiling Grid Inspection3/27/20193/27/20193/28/2019PNR
DetailsDave Hannah
Zach Phone #: ###-####
BLD-Framing/Rough-in2/22/20192/22/20192/22/2019PPEND
DetailsDave Hannah
Zack Phone #: ###-#### plumbing location of toilet not in rigth spot and no grab bar backing
BLD-Framing/Rough-in2/12/20192/13/20192/13/2019APASS
DetailsDave Hannah
Zack Phone #: ###-####
Issue PAID IN FULL permit  1/22/2019 DONE
Print Occupancy Form  1/22/2019 DONE
Plan assigned to (JHB)10/8/201810/8/20181/11/2019 PASS
DetailsJoe Bruce
*(4th Rev Comp) 10/23 (L2) - Main Street Deli (Plan)
Plan resubmittals received  1/11/2019 DONE
DetailsJoe Bruce
Routing - PLAN CHECK1/11/2019 1/11/2019 PASS
DetailsJoe Bruce
PLANS/APPL TAKEN TO FRONT DESK  1/11/2019 DONE
Permit Ready to Issue  1/11/2019 DONE
all met-NEED
ACHD-met
GC FORM-met
REVISED VALUE-met
do not issue without BLD19-00130
Routing - PLAN CHECK1/9/2019 1/10/2019 FAIL
DetailsJoe Bruce
Telephone call  1/10/2019 DONE
DetailsJoe Bruce
Spoke with Andrew Britt regarding additional corrections that are required on the plans. Another plan review cycle will be required to address necessary comments. **JHB**
Plan resubmittals requested  1/10/2019 FAIL
DetailsJoe Bruce
Routing - PLAN CHECK11/21/2018 11/23/2018 FAIL
DetailsJoe Bruce
Plan resubmittals requested  11/23/2018 DONE
DetailsJoe Bruce
Emailed the plan review report (2nd Review) to the architect. **JHB**
Plan resubmittals received  11/21/2018 DONE
DetailsJoe Bruce
Received resubmittal in ePlan. **JHB**
Route to Impact Fee Review10/24/201810/27/201810/24/2018 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Routing - PLAN CHECK10/8/2018 10/24/2018 FAIL
DetailsJoe Bruce
1st review completed  10/24/2018 FAIL
DetailsJoe Bruce
Plan resubmittals requested  10/24/2018 FAIL
DetailsJoe Bruce
Emailed Plan Review Report to Architect on 10/24. **JHB**
Routing - FIRE10/8/201810/8/201810/23/2018 PASS
DetailsErika Akin
Attached comments to case
Routing - Addressing10/8/2018 10/23/2018 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS10/8/2018 10/8/2018 PASS
DetailsMorgan Webb
Routing - PLANNING10/8/2018 10/8/2018 PASS
DetailsNicolette Womack
Intake Approval  10/4/2018 PASS
Intake Approval  9/25/2018 FAIL
DetailsJavier Guzman
Provide and upload the following:
• Provide plan sheets G1.1 and A1.1 with the Architects stamp that is signed and dated from the Idaho licensed architect
• Provide a stamped floor plan from CDH for the expansion.
• Provide on plans the furniture and fixture layout of the tenant space
Application received  9/21/2018 DONE
Application submitted via PDS Online on Sep 21 2018 5:36PM