Permit Information
Permit NumberBLD18-03480
StatusFinaled
Name CBH HOMES
Site Address 6076 N TARAKO AVE
Project Namelot 1 (24C)
Customer NumberEPLAN BLD18-03480 & 18-03494-03498
ePlanReviewYes
Description
(SIX BUILDING PERMITS IN REVIEW IN EPLAN BLD18-03480)Permit for the construction of a new 1,824 sq. ft., two story (first story 752 sq. ft., second story 1072 sq. ft.) single family dwelling with 2 bedrooms, 1 and a half bathrooms, approximately 13 sq. ft. of covered patio/porch and a 483 sq. ft. attached garage per the approved plans and any notations. Prescriptive Energy Compliance. R-2Dzoning and setbacks per planning.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/1/20198/2/20198/2/2019APASS
DetailsTony Young
Colby Phone #: ###-####
BLD-Blower Door Test Results8/2/20198/2/20198/2/2019PDONE
DetailsTony Young
Colby Phone #: ###-####// 7.08
DOC - Permit Finaled8/2/20198/2/20198/2/2019PPASS
DetailsTony Young
BLD-Energy code compliance6/17/20196/18/20196/18/2019APASS
DetailsTony Young
Colby Phone #: ###-####
BLD-Framing/Rough-in6/17/20196/17/20196/17/2019PPASS
DetailsTony Young
Colby Phone #: ###-####
BLD-Framing/Rough-in6/14/20196/14/20196/17/2019PPART
DetailsTony Young
Colby Phone #: ###-####// most frame corrections made,, ok to insulate
BLD-Energy code compliance6/14/20196/17/20196/17/2019APART
DetailsTony Young
Colby Phone #: ###-####,, seal pack ok,, ok to insulate
BLD-Framing/Rough-in6/13/20196/14/20196/14/2019ANR
DetailsTony Young
Colby Phone #: ###-####,, c/n posted
BLD-Wall Bracing6/3/20196/3/20196/3/2019PPASS
DetailsTony Young
Colby Phone #: ###-####
BLD-Other5/8/20195/9/20195/9/2019APART
DetailsTony Young
Colby-1st layer sheetrock inspect Phone #: ###-####, work in progress
BLD-Other4/18/20194/18/20194/18/2019PPART
DetailsJim Sly
Eric-fire wall inspection Phone #: ###-####
1st layer.......OK.
BLD-Concrete4/4/20194/4/20194/4/2019PPART
DetailsTony Young
underslab // Eric Phone #: ###-####,, work in progress
BLD-Foundation3/21/20193/22/20193/23/2019PDONE
DetailsTony Young
Dane Phone #: ###-####
BLD-Footing3/19/20193/20/20193/21/2019PDONE
DetailsTony Young
Dane Phone #: ###-####
BLD-Footing3/19/20193/20/20193/20/2019APART
DetailsTony Young
Dane Phone #: ###-####, work in progress
BLD-Footing3/18/20193/19/20193/19/2019PNR
DetailsTony Young
Dane Phone #: ###-####
Issue PAID IN FULL permit  2/19/2019 DONE
OVERRIDE  1/30/2019  
Permit Ready to Issue  1/30/2019 DONE
BLD18-03480 & BLD18-03494 - BLD18-03498
Plan assigned to (RDP)1/11/20191/11/20191/29/2019 DONE
DetailsRob Patrick
1/16 Failed; Wall Bracing Corrections Required
Routing - PLAN CHECK1/29/2019 1/29/2019 PASS
DetailsRob Patrick
PLANS/APPL TAKEN TO FRONT DESK  1/29/2019 DONE
DetailsRob Patrick
Routing - PLAN CHECK1/11/2019 1/16/2019 FAIL
DetailsRob Patrick
Wall Brace Corrections Required
Routing - Design Review1/11/2019 1/15/2019 PASS
DetailsJosh Wilson
Plan assigned to (M_H)10/26/2018 1/11/2019 DEFR
DetailsMichael Hanson
10/11 sfd L2 ePlan...10/08 Failed; Corrections Needed 10/26 Failed arch sealed and wall bracing. 12/13 Failed arch sealed and wall bracing. MDH
Routing - PLAN CHECK12/13/2018 12/13/2018 FAIL
DetailsMichael Hanson
Changemarks regarding wall bracing have not been resolved.
Update CS-PF detail to 2015 has not been resolved.
Architectural stamp, signed and dated missing on sheet A2.0, A4.0, A5.0, A7.0.
Plan assigned to (RDP)9/24/20189/24/201810/26/2018 DEFR
DetailsRob Patrick
10/11 sfd L2 ePlan...10/8 Failed; Corrections Needed
Routing - PLAN CHECK10/26/2018 10/26/2018 FAIL
DetailsMichael Hanson
10/11 sfd L2 ePlan...10/08 Failed; Corrections Needed 10/26 Failed arch sealed and wall bracing. MDH
Routing - PLAN CHECK9/24/2018 10/8/2018 FAIL
DetailsRob Patrick
Corrections Needed
1st review completed  10/8/2018 FAIL
DetailsRob Patrick
Corrections Needed
Routing - PLANNING9/24/2018 9/27/2018 PASS
DetailsLeon Letson
Route to Impact Fee Review9/24/20189/27/20189/25/2018 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - MECHANICAL9/24/2018 9/25/2018 PASS
DetailsTroy James
Plans ACCEPTED BY PLAN TECH  9/24/2018 DONE
Intake Approval  9/24/2018 PASS
Recd Pcfee & Taken To Pln CK  9/24/2018 DONE
Routing - Addressing9/24/2018 9/24/2018 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS9/24/2018 9/24/2018 PASS
DetailsMorgan Webb
Application received  9/22/2018 DONE
Application submitted via PDS Online on Sep 22 2018 12:35PM