BLD-Final | 10/16/2019 | 10/16/2019 | 10/16/2019 | P | PASS |
Tell Riley
|
|
|
PAT Phone #: ###-####//all trades finals complete//all signatures required complete//final complete//
|
Zoning Approval | 10/16/2019 | 10/16/2019 | 10/16/2019 | | PASS |
Katelyn Menuge
|
|
|
|
Permanent Occupancy | | | 10/16/2019 | | DONE |
|
|
|
|
BLD-Final | 10/14/2019 | 10/15/2019 | 10/15/2019 | P | CANC |
Tell Riley
|
|
|
Pat Phone #: ###-####
|
BLD-Aging Inspection | 10/14/2019 | 10/14/2019 | 10/14/2019 | | CANC |
Tell Riley
|
|
|
entire project almost complete//
|
PubWorks Occupancy Approval | 10/14/2019 | 10/14/2019 | 10/14/2019 | | DONE |
Tiffany Lowery
|
|
|
|
Temporary Occupancy | 10/7/2019 | 1/5/2020 | 10/7/2019 | | DONE |
Candy A. Nichols
|
|
|
Jason Blais ok'd 30 day temp c of o from 9/16/19
|
Temporary Occupancy | 9/25/2019 | 12/24/2019 | 9/25/2019 | | DONE |
Candy A. Nichols
|
|
|
Jason Blais ok'd Temp C of O extension good for 30 days from 9/16/19
|
BLD-Aging Inspection | 8/12/2019 | 8/12/2019 | 8/12/2019 | | PASS |
Tell Riley
|
|
|
still working on projects
|
PubWorks Temp Occupancy Appr | 7/18/2019 | 7/18/2019 | 7/18/2019 | | DONE |
Tiffany Lowery
|
|
|
|
Temporary Occupancy | 6/18/2019 | 9/16/2019 | 6/18/2019 | | DONE |
Brittany Hill
|
|
|
|
CHANGE STATUS TO (ISS) | | | 6/18/2019 | | DONE |
|
|
|
has not had a full pass on all inspections
|
BLD-Final | 6/12/2019 | 6/13/2019 | 6/13/2019 | A | PASS |
Tell Riley
|
|
|
Bill Phone #: ###-####//ok per approved plans//
|
FIRE-Final Inspection | 6/12/2019 | 6/13/2019 | 6/13/2019 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
Bill Phone #: ###-####
|
Zoning Approval Temp | 6/13/2019 | 6/13/2019 | 6/13/2019 | | DONE |
Andrea Tuning
|
|
|
|
FIRE-Final Inspection | 6/12/2019 | 6/12/2019 | 6/12/2019 | P | FAIL |
Jim Page
|
|
|
Self closing door hinges on east level 1 units are not operable, doors will not close on their own. Provide signage for fire sprinkler riser room and FACP for fire alarm control panel. Provide apartment unit number for each apartment, signage not in place at time of inspection. Install knox box for fire department. Bill Phone #: ###-####
|
BLD-Energy code compliance | 3/21/2019 | 3/21/2019 | 3/21/2019 | P | PASS |
Jim Sly
|
|
|
Bill Phone #: ###-####
|
BLD-Energy code compliance | 3/20/2019 | 3/20/2019 | 3/20/2019 | P | NR |
Dave Hannah
|
|
|
Bill Phone #: ###-####
|
BLD-Energy code compliance | 3/19/2019 | 3/20/2019 | 3/20/2019 | A | PASS |
Mike Jordan
|
|
|
joe Phone #: ###-####
|
BLD-Framing/Rough-in | 3/18/2019 | 3/19/2019 | 3/19/2019 | A | PASS |
Jim Sly
|
|
|
Bill Phone #: ###-####
|
BLD-Framing/Rough-in | 3/18/2019 | 3/18/2019 | 3/18/2019 | P | FAIL |
Mike Jordan
|
|
|
Bill Phone #: ###-####. Still needs mech and fire sprinkler rough in inspections. Noted several aeas were fire caulking is missing. All concealed ares at the 1hr. florr cieling assembly need to be shhet rocked.
|
BLD-Wall Bracing | 3/11/2019 | 3/11/2019 | 3/11/2019 | P | PASS |
Jim Sly
|
|
|
shear // bill Phone #: ###-####
|
BLD-Foundation | 1/11/2019 | 1/14/2019 | 1/14/2019 | P | PASS |
Brandon Shaw
|
|
|
Work in progress
|
BLD-Footing | 1/11/2019 | 1/11/2019 | 1/11/2019 | P | PASS |
Jim Sly
|
|
|
Dane Phone #: ###-####
|
Print Occupancy Form | | | 1/8/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 1/8/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 1/3/2019 | | |
|
|
|
|
Plan assigned to (JAR) | 10/12/2018 | 10/12/2018 | 1/3/2019 | | DONE |
Julie Romig
|
|
|
1st Rev Comp - 2nd Comp - 506 Fairview Apts Bldg D1
|
Routing - Design Review | 10/12/2018 | | 1/3/2019 | | PASS |
Andrea Tuning
|
|
|
|
Routing - PLAN CHECK | 1/3/2019 | | 1/3/2019 | | PASS |
Julie Romig
|
|
|
Form 310 Deferred. Special Inspections required for post installed anchors into concrete if used.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/3/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/3/2019 | | DONE |
|
|
|
need - met
Revised Cert of Value (need correct address)
MET
ACHD
GC Form (need an updated form)-met
|
Routing Off Site - STRUCTURAL | 12/14/2018 | | 12/21/2018 | | PASS |
Julie Romig
|
|
|
|
Routing - PLAN CHECK | 12/14/2018 | | 12/20/2018 | | FAIL |
Julie Romig
|
|
|
|
Routing - PLANNING | 12/14/2018 | | 12/18/2018 | | PASS |
Nicolette Womack
|
|
|
|
Routing - PLANNING | 10/12/2018 | | 12/18/2018 | | PASS |
Nicolette Womack
|
|
|
|
Route to Impact Fee Review | 11/21/2018 | 11/24/2018 | 11/23/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 11/21/2018 | | DONE |
Julie Romig
|
|
|
|
Routing - PLAN CHECK | 10/12/2018 | | 11/21/2018 | | FAIL |
Julie Romig
|
|
|
11/21 - 506 Fairview Apts Bldg D1
|
Routing - FIRE | 10/12/2018 | 10/12/2018 | 11/20/2018 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
Routing Off Site - STRUCTURAL | 10/12/2018 | | 10/26/2018 | | FAIL |
Julie Romig
|
|
|
AHJ
|
Routing - MECHANICAL | 10/12/2018 | | 10/25/2018 | | PASS |
Troy James
|
|
|
|
Routing - PLUMBING | 10/12/2018 | | 10/16/2018 | | PASS |
Dan Ediger
|
|
|
Per ISPC See redline notes
|
Routing - Erosion and Sediment | 10/12/2018 | | 10/16/2018 | | PASS |
Andy J. Long
|
|
|
SWPPP approved. Valid stormwater team designated. Site already started under GRD18-00035, no site prep required.
|
Routing - Addressing | 10/12/2018 | | 10/15/2018 | | PASS |
Doug Chausow
|
|
|
Addressed changed to 11758 W King St
Parcel # updated: S1103336611
|
Routing - PUBLIC WORKS | 10/12/2018 | | 10/15/2018 | | PASS |
Morgan Webb
|
|
|
|
Routing PW Drainage | 10/15/2018 | | 10/15/2018 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Street Lights | 10/15/2018 | | 10/15/2018 | | PASS |
Tom Marshall
|
|
|
Street lights are being tracked under BLD18-03485.
|
Routing PW Sewer Design | 10/15/2018 | | 10/15/2018 | | PASS |
DeAnn Brown
|
|
|
|
Routing PW Solid Waste | 10/15/2018 | | 10/15/2018 | | PASS |
Evan Carpenter
|
|
|
|
Intake Approval | | | 10/12/2018 | | PASS |
|
|
|
|
Intake Approval | | | 10/11/2018 | | FAIL |
Joe Bruce
|
|
|
Jeremy, There are just a few additional sheets that need the space reserved for the stamp that look like they were missed.
This document on our website illustrates these requirements: https://pds.cityofboise.org/media/464072/pdox86_electronic_standards_full_050718.pdf
1) Drawing sheets (C1.0, EC-101, A-103, S-105.10, and SE-1) do not have required space reserved for City approval stamps as specified in the Electronic Plans Submittal Standards. Revise sheets with a blank 4” x 2” space located 3” off the right sheet edge to allow for the title block. Verify all sheets have the required space for city approval stamp.
|
Intake Approval | | | 9/25/2018 | | FAIL |
Joe Bruce
|
|
|
Provide the following items to complete the prescreen process:
1) Missing stamped/signed Structural Calculations. Provide per checklist.
2) Missing Special Inspections (Form #310) Provide per checklist.
3) Drawing sheets do not have required space reserved for City approval stamps as specified in the Electronic Plans Submittal Standards. Revise sheets with a blank 4” x 2” space located 3” off the right sheet edge to allow for the title block. Verify all sheets have the required space for city approval stamp. Cover sheet needs a 4"x4" space.
4) Portions of interior finish schedule appear to be missing - Sheet A-105
5) It's unclear who signed the Structural Sheets since the engineer and architect stamp overlap. Provide a clear engineer stamp/signature on the structural drawings.
6) REScheck Building Envelope Compliance Certificate utilizes the 2012 IECC. The City of Boise has adopted the 2015 IECC. Revise the Compliance Certificate with current code. - Sheet G-6
|
Application received | | | 9/23/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 23 2018 12:49AM
|
First Notice | | 10/26/2019 | | | |
|
|
|
|