Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD18-03485
StatusFinaled
Name BILTMORE COMPANY
Site Address 11740 W KING ST
Project NameFairview Apartments - Bldg D2
Customer Number 
ePlanReviewYes
Description
(FAIRVIEW APARTMENTS) (BLDG D2) (DRH17-00532) (GRD18-00035) Permit for the construction of Building D2, a 8,737 sq ft, 2-story, 8-unit apartment building. This building is one of six buildings within a multi-family development, which includes (3) three-story, 24-unit multi-family buildings and (3) two-story, 8-unit buildings for a total of 96 units on the site. Work to include general site work and the construction of the new building per the approved plans. Special inspections are required for post installed anchors into concrete when used per Sheet S-001.1 and Form 310. All buildings are to be fully fire sprinklered with an NFPA 13-R system as required for residential occupancy and story increase. **JAR**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/16/201910/16/201910/16/2019PPASS
DetailsTell Riley
PAT Phone #: 208-941-829//trades finals complete//all signatures complete//final complete//
Zoning Approval10/16/201910/16/201910/16/2019 PASS
DetailsKatelyn Menuge
Permanent Occupancy  10/16/2019 DONE
BLD-Final10/14/201910/15/201910/15/2019PCANC
DetailsTell Riley
Pat Phone #: ###-####
PubWorks Occupancy Approval10/14/201910/14/201910/14/2019 DONE
DetailsTiffany Lowery
BLD-Aging Inspection10/7/201910/7/201910/7/2019 PASS
DetailsTell Riley
working on finishing all permits
Temporary Occupancy9/25/201912/24/20199/25/2019 DONE
DetailsCandy A. Nichols
Jason Blais ok'd Temp C of O extension good for 30 days from 9/16/19
BLD-Aging Inspection8/5/20198/5/20198/5/2019 PASS
DetailsTell Riley
Temporary Occupancy6/18/20199/16/20196/18/2019 DONE
DetailsBrittany Hill
Zoning Approval Temp6/13/20196/13/20196/13/2019 DONE
DetailsAndrea Tuning
Bond has been placed
BLD-Final6/4/20196/4/20196/4/2019PPART
DetailsTony Young
Bill Phone #: ###-#### temp occ. ok pending trades.
FIRE-Final Inspection6/3/20196/4/20196/4/2019APASS
DetailsTroy Cobbley
Life safety passed. Life safety/Egress plan provided and letter of intent to be scaned to case file. This life safety plan to be provided by the Apartment Leasing Office to each tenant at move in.
Bill Phone #: ###-####
FIRE-Final Inspection5/28/20195/29/20195/29/2019AFAIL
DetailsTroy Cobbley
Need project related fire alarm permit finaled, both fire sprinkler permits finaled, need clarification/add the emergency lighting and additional smoke alarms as per the approved plans and fire dept access implemented as discussed.

Bill Phone #: ###-####
BLD-Other3/14/20193/14/20193/14/2019PPASS
DetailsJim Sly
RCChannnel inspection- Bill Phone #: ###-####
BLD-Energy code compliance3/12/20193/12/20193/13/2019PPASS
DetailsJim Sly
Bill Phone #: ###-####
BLD-Energy code compliance3/11/20193/11/20193/11/2019PNR
DetailsJim Sly
bill Phone #: ###-####
BLD-Framing/Rough-in3/8/20193/8/20193/9/2019PPASS
DetailsJim Sly
Bill Phone #: ###-####
BLD-Wall Bracing3/8/20193/8/20193/8/2019PPASS
DetailsJim Sly
Bill Phone #: ###-####
BLD-Conference3/7/20193/6/20193/7/2019ADONE
DetailsBob Archibald
Review of rated floor/ceiling penetrations.
BLD-Framing/Rough-in3/5/20193/5/20193/5/2019PNR
DetailsJim Sly
Bill Phone #: ###-####
Need Mech rough in approval.......
BLD-Conference3/1/20193/4/20193/5/2019ACANC
DetailsJim Sly
Pat Phone #: ###-####
BLD-Foundation1/9/20191/10/20191/10/2019PPASS
DetailsJim Sly
wall // dane Phone #: ###-####
BLD-Footing1/8/20191/9/20191/10/2019PPASS
DetailsJim Sly
Dane Phone #: ###-####
Print Occupancy Form  1/8/2019 DONE
Issue PAID IN FULL permit  1/8/2019 DONE
OVERRIDE  1/3/2019  
Plan assigned to (JAR)11/21/201811/21/20181/3/2019 DONE
DetailsJulie Romig
1st Rev Comp - 2nd Comp - 506 Farivew Apts Bldg D2
Routing - PLAN CHECK1/3/2019 1/3/2019 PASS
DetailsJulie Romig
Form 310 Deferred. Special Inspections required for post installed anchors into concrete if used.
PLANS/APPL TAKEN TO FRONT DESK  1/3/2019 DONE
Permit Ready to Issue  1/3/2019 DONE
need - met
Revised Cert of Value (need correct address)
MET
ACHD
GC Form (need an updated form)-met
Routing - PLAN CHECK12/14/2018 12/21/2018 FAIL
DetailsJulie Romig
Routing Off Site - STRUCTURAL12/14/2018 12/21/2018 PASS
DetailsJulie Romig
AHJ
Routing - PLANNING12/14/2018 12/18/2018 PASS
DetailsNicolette Womack
Routing - PLANNING10/12/2018 12/18/2018 PASS
DetailsSusan Riggs
Route to Impact Fee Review11/21/201811/24/201811/23/2018 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Plan assigned to (JG)10/12/201810/12/201811/21/2018 DEFR
DetailsJavier Guzman
11/08 Fairview Apartments New ePlan
Routing - PLAN CHECK10/12/2018 11/21/2018 FAIL
DetailsJulie Romig
1st review completed  11/21/2018 FAIL
DetailsJulie Romig
Routing - FIRE10/12/201810/12/201811/20/2018 PASS
DetailsErika Akin
Attached comments to case
Routing Off Site - STRUCTURAL10/12/2018 10/25/2018 FAIL
DetailsJulie Romig
AHJ
Routing - MECHANICAL10/12/2018 10/23/2018 PASS
DetailsTroy James
Routing - PLUMBING10/12/2018 10/16/2018 PASS
DetailsDan Ediger
Per ISPC. See redline note
Routing - Erosion and Sediment10/12/2018 10/16/2018 PASS
DetailsAndy J. Long
SWPPP approved. Valid stormwater team designated. Site already started under GRD18-00035, no site prep required.
Routing - Design Review10/12/2018 10/15/2018 PASS
DetailsAndrea Tuning
Routing PW Drainage10/15/2018 10/15/2018 PASS
DetailsBrian Murphy
Routing PW Street Lights10/15/2018 10/15/2018 PASS
DetailsTom Marshall
Street lights will be tracked on this case.
Routing PW Sewer Design10/15/2018 10/15/2018 PASS
DetailsDeAnn Brown
Routing PW Solid Waste10/15/2018 10/15/2018 PASS
DetailsEvan Carpenter
Routing - Addressing10/12/2018 10/15/2018 PASS
DetailsDoug Chausow
Address changed to 11740 W King St
Parcel # updated to: S1103336611
Routing - PUBLIC WORKS10/12/2018 10/15/2018 PASS
DetailsMorgan Webb
Intake Approval  10/12/2018 PASS
Intake Approval  10/11/2018 FAIL
DetailsJoe Bruce
Jeremy, There are just a few additional sheets that need the space reserved for the stamp that look like they were missed.
This document on our website illustrates these requirements: https://pds.cityofboise.org/media/464072/pdox86_electronic_standards_full_050718.pdf

1) Drawing sheets (C1.0, EC-101, A-103, S-105.10, and SE-1) do not have required space reserved for City approval stamps as specified in the Electronic Plans Submittal Standards. Revise sheets with a blank 4” x 2” space located 3” off the right sheet edge to allow for the title block. Verify all sheets have the required space for city approval stamp.
Intake Approval  9/25/2018 FAIL
DetailsJoe Bruce
Provide the following items to complete the prescreen process:
1) Missing stamped/signed Structural Calculations. Provide per checklist.
2) Missing Special Inspections (Form #310) Provide per checklist.
3) Drawing sheets do not have required space reserved for City approval stamps as specified in the Electronic Plans Submittal Standards. Revise sheets with a blank 4” x 2” space located 3” off the right sheet edge to allow for the title block. Verify all sheets have the required space for city approval stamp. Cover sheet needs a 4"x4" space.
4) Portions of interior finish schedule appear to be missing - Sheet A-105
5) It's unclear who signed the Structural Sheets since the engineer and architect stamp overlap. Provide a clear engineer stamp/signature on the structural drawings.
6) REScheck Building Envelope Compliance Certificate utilizes the 2012 IECC. The City of Boise has adopted the 2015 IECC. Revise the Compliance Certificate with current code. - Sheet G-6
Application received  9/23/2018 DONE
Application submitted via PDS Online on Sep 23 2018 12:55AM
First Notice 10/26/2019