BLD-Final | 10/16/2019 | 10/16/2019 | 10/16/2019 | P | PASS |
Tell Riley
|
|
|
PAT Phone #: ###-####//all trades passed and life safety//all signatures required complete//final complete//
|
Zoning Approval | 10/16/2019 | 10/16/2019 | 10/16/2019 | | PASS |
Katelyn Menuge
|
|
|
|
Permanent Occupancy | | | 10/16/2019 | | DONE |
|
|
|
|
BLD-Final | 10/14/2019 | 10/15/2019 | 10/15/2019 | P | CANC |
Tell Riley
|
|
|
Pat Phone #: ###-####
|
FIRE-Final Inspection | 10/14/2019 | 10/15/2019 | 10/15/2019 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. Phone #: ###-####
|
PubWorks Occupancy Approval | 10/14/2019 | 10/14/2019 | 10/14/2019 | | DONE |
Tiffany Lowery
|
|
|
|
BLD-Aging Inspection | 9/16/2019 | 9/16/2019 | 9/16/2019 | | PASS |
Tell Riley
|
|
|
WIP....
|
Temporary Occupancy | 7/18/2019 | 10/16/2019 | 7/18/2019 | | DONE |
Brittany Hill
|
|
|
|
PubWorks Temp Occupancy Appr | 7/18/2019 | 7/18/2019 | 7/18/2019 | | DONE |
Tiffany Lowery
|
|
|
|
PubWorks Temp Occupancy Appr | 7/18/2019 | 7/18/2019 | 7/18/2019 | | DONE |
Brian Murphy
|
|
|
per brian murphy bond is in place.
|
BLD-Final | 7/16/2019 | 7/16/2019 | 7/16/2019 | P | PASS |
Tell Riley
|
|
|
Bill Phone #: ###-####//corrections made//ok for temp occupancy//
|
Zoning Approval Temp | 7/11/2019 | 7/11/2019 | 7/11/2019 | | DONE |
Andrea Tuning
|
|
|
|
BLD-Final | 7/10/2019 | 7/10/2019 | 7/10/2019 | P | FAIL |
Tell Riley
|
|
|
Matt Phone #: ###-####//need to seal penetrations in storage rooms//label fire riser room//anchor railings at stairway//will call for re-isnpection//
|
BLD-Energy code compliance | 4/3/2019 | 4/4/2019 | 4/4/2019 | A | PASS |
Jim Sly
|
|
|
Bill Phone #: ###-####
|
BLD-Framing/Rough-in | 4/1/2019 | 4/1/2019 | 4/1/2019 | P | PASS |
Jim Sly
|
|
|
Bill Phone #: ###-####
|
BLD-Wall Bracing | 3/19/2019 | 3/19/2019 | 3/19/2019 | P | PASS |
Jim Sly
|
|
|
Bill Phone #: ###-####
|
BLD-Foundation | 1/16/2019 | 1/17/2019 | 1/17/2019 | P | PASS |
Jim Storey
|
|
|
Dane Phone #: ###-####
|
BLD-Footing | 1/15/2019 | 1/16/2019 | 1/16/2019 | P | PASS |
Jim Sly
|
|
|
Dean Phone #: ###-####
|
BLD-Footing | 1/14/2019 | 1/15/2019 | 1/16/2019 | P | CANC |
Jim Sly
|
|
|
Dean Phone #: ###-####
|
Issue PAID IN FULL permit | | | 1/11/2019 | | DONE |
|
|
|
emailed Jeremy the permits to sign and send back
|
Print Occupancy Form | | | 1/11/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 1/3/2019 | | |
|
|
|
|
Plan assigned to (JAR) | 10/12/2018 | 10/12/2018 | 1/3/2019 | | DONE |
Julie Romig
|
|
|
1st Rev Comp - 2nd Comp - 506 Fairview Apts Bldg D3
|
Routing - Addressing | 10/12/2018 | | 1/3/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PLAN CHECK | 1/3/2019 | | 1/3/2019 | | PASS |
Julie Romig
|
|
|
Form 310 Deferred. Special Inspections required for post installed anchors into concrete if used.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/3/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/3/2019 | | DONE |
|
|
|
need
Revised Cert of Value (need correct address)
MET
ACHD
GC Form (need an updated form)
|
Routing - PLANNING | 12/14/2018 | | 12/21/2018 | | PASS |
Leon Letson
|
|
|
|
Routing Off Site - STRUCTURAL | 12/14/2018 | | 12/21/2018 | | PASS |
Julie Romig
|
|
|
|
Routing - PLAN CHECK | 12/14/2018 | | 12/20/2018 | | FAIL |
Julie Romig
|
|
|
|
Routing - PLANNING | 10/12/2018 | | 12/14/2018 | | FAIL |
Leon Letson
|
|
|
Bond must be recorded for sidewalks, landscaping, amenities before building permits can be issued.
|
Route to Impact Fee Review | 11/21/2018 | 11/24/2018 | 11/23/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing - PLAN CHECK | 10/12/2018 | | 11/21/2018 | | FAIL |
Julie Romig
|
|
|
|
1st review completed | | | 11/21/2018 | | FAIL |
Julie Romig
|
|
|
|
Routing - FIRE | 10/12/2018 | 10/12/2018 | 11/20/2018 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
Routing Off Site - STRUCTURAL | 10/12/2018 | | 10/25/2018 | | FAIL |
Julie Romig
|
|
|
AHJ
|
Routing - MECHANICAL | 10/12/2018 | | 10/23/2018 | | PASS |
Troy James
|
|
|
|
Routing - PLUMBING | 10/12/2018 | | 10/16/2018 | | PASS |
Dan Ediger
|
|
|
Per ISPC. See redline note
|
Routing - Erosion and Sediment | 10/12/2018 | | 10/16/2018 | | PASS |
Andy J. Long
|
|
|
SWPPP approved. Valid stormwater team designated. Site already started under GRD18-00035, no site prep required.
|
Routing - PUBLIC WORKS | 10/12/2018 | | 10/15/2018 | | PASS |
Morgan Webb
|
|
|
|
Routing PW Drainage | 10/15/2018 | | 10/15/2018 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Street Lights | 10/15/2018 | | 10/15/2018 | | PASS |
Tom Marshall
|
|
|
Street lights being tracked under BLD18-03485.
|
Routing PW Sewer Design | 10/15/2018 | | 10/15/2018 | | PASS |
DeAnn Brown
|
|
|
|
Routing PW Solid Waste | 10/15/2018 | | 10/15/2018 | | PASS |
Evan Carpenter
|
|
|
|
Routing - Design Review | 10/12/2018 | | 10/15/2018 | | PASS |
Andrea Tuning
|
|
|
|
Intake Approval | | | 10/12/2018 | | PASS |
|
|
|
|
Intake Approval | | | 9/25/2018 | | FAIL |
Joe Bruce
|
|
|
Provide the following items to complete the prescreen process:
1) Missing stamped/signed Structural Calculations. Provide per checklist.
2) Missing Special Inspections (Form #310) Provide per checklist.
3) Drawing sheets do not have required space reserved for City approval stamps as specified in the Electronic Plans Submittal Standards. Revise sheets with a blank 4” x 2” space located 3” off the right sheet edge to allow for the title block. Verify all sheets have the required space for city approval stamp. Cover sheet needs a 4"x4" space.
4) Portions of interior finish schedule appear to be missing - Sheet A-105
5) It's unclear who signed the Structural Sheets since the engineer and architect stamp overlap. Provide a clear engineer stamp/signature on the structural drawings.
6) REScheck Building Envelope Compliance Certificate utilizes the 2012 IECC. The City of Boise has adopted the 2015 IECC. Revise the Compliance Certificate with current code. - Sheet G-6
|
Application received | | | 9/23/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 23 2018 1:00AM
|
First Notice | | 10/26/2019 | | | |
|
|
|
|