BLD-Conference | 7/16/2019 | 7/16/2019 | 7/16/2019 | P | PASS |
Tony Young
|
|
|
Ron Phone #: ###-####,, ?s on final,, ok for final now,, cloned added final inspection
|
DOC - Permit Finaled | 7/16/2019 | 7/16/2019 | 7/16/2019 | P | PASS |
Tony Young
|
|
|
|
BLD-Final | 7/16/2019 | 7/16/2019 | 7/16/2019 | P | PASS |
Tony Young
|
|
|
Ron Phone #: ###-####
|
Routing - MECHANICAL | 5/30/2019 | | 5/30/2019 | | PASS |
Troy James
|
|
|
New manual j report
|
BLD-Energy code compliance | 4/9/2019 | 4/10/2019 | 4/10/2019 | P | PASS |
Tony Young
|
|
|
Ron Phone #: ###-####
|
BLD-Framing/Rough-in | 4/2/2019 | 4/3/2019 | 4/3/2019 | A | PASS |
Tony Young
|
|
|
Ron Phone #: ###-####,, ok to insulate
|
BLD-Framing/Rough-in | 4/2/2019 | 4/2/2019 | 4/2/2019 | P | PART |
Tony Young
|
|
|
Ron Phone #: ###-####,, needs seal pack
|
BLD-Wall Bracing | 1/16/2019 | 1/16/2019 | 1/16/2019 | P | PASS |
Tony Young
|
|
|
Ron Phone #: ###-####,, work in progress,, ok
|
BLD-Footing | 11/15/2018 | 11/16/2018 | 11/16/2018 | A | PASS |
Tony Young
|
|
|
John Phone #: ###-####
|
BLD-Footing | 11/14/2018 | 11/15/2018 | 11/15/2018 | A | PART |
Tony Young
|
|
|
John Phone #: ###-####,, work in progress
|
BLD-Footing | 11/13/2018 | 11/14/2018 | 11/14/2018 | P | NR |
Tony Young
|
|
|
John Phone #: ###-####
|
Issue PAID IN FULL permit | | | 11/7/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 11/6/2018 | | |
|
|
|
|
Plan assigned to (BJM) | 10/8/2018 | 10/8/2018 | 11/6/2018 | | DONE |
Brian McGowan
|
|
|
Corrections Required
|
Routing - PLAN CHECK | 10/24/2018 | | 11/6/2018 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 11/6/2018 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 11/6/2018 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/6/2018 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 11/6/2018 | | DONE |
|
|
|
met
|
Telephone call | | | 11/6/2018 | | DONE |
|
|
|
Spoke with Alexander to inform him the permit is ready and what fees are due.
|
Routing Walk-In (Zoning) | 11/5/2018 | 11/5/2018 | 11/5/2018 | A | PASS |
Colleen T Carroll
|
|
|
|
Routing - MECHANICAL | 10/24/2018 | | 10/24/2018 | | PASS |
Troy James
|
|
|
Resubmitted Plans
|
Plan resubmittals received | | | 10/23/2018 | | DONE |
|
|
|
Changing size of addition. Two copies of manual J and two copies of sheets A0, A1, A2, A3, A4, A5, A6, A7 and A8. Taken to Brian
|
Routing - PLAN CHECK | 10/8/2018 | | 10/16/2018 | | FAIL |
Brian McGowan
|
|
|
Need the existing structure verified as requested previously, sketch of Basement Floor Plan and code compliant deck piers.
|
Routing Walk-In (BLD) | 10/8/2018 | 10/8/2018 | 10/8/2018 | A | PASS |
Josh Bogle
|
|
|
took in as level two for Mechanical review - put on BJM task list
|
Routing - MECHANICAL | 10/8/2018 | | 10/8/2018 | | PASS |
Troy James
|
|
|
|
Routing Walk-In (Zoning) | 9/24/2018 | 9/24/2018 | 9/24/2018 | A | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 9/24/2018 | 9/24/2018 | 9/24/2018 | A | FAIL |
Brian McGowan
|
|
|
|
1st review completed | | | 9/24/2018 | | FAIL |
Brian McGowan
|
|
|
Need manual J, modify wall bracing, verify the existing structure can support the proposed additional loads, provide structure for proposed deck.
|
Routing - PLAN CHECK | 9/24/2018 | | 9/24/2018 | | FAIL |
Brian McGowan
|
|
|
|
Application received | | 9/24/2018 | | | |
|
|
|
|