BLD-Final | 5/13/2019 | 5/13/2019 | 5/13/2019 | P | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Gus Brandon
|
DOC - Permit Finaled | 5/13/2019 | 5/13/2019 | 5/13/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 5/13/2019 | 5/13/2019 | 5/13/2019 | P | DONE |
Brandon Shaw
|
|
|
ACH50- 4.5
|
BLD-Other | 5/13/2019 | 5/13/2019 | 5/13/2019 | P | CANC |
Brandon Shaw
|
|
|
Drainage test and landscaping final Phone #: ###-#### Inspection requested via web by Gus Brandon
|
PubWorks Occupancy Approval | 5/13/2019 | 5/13/2019 | 5/13/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Other | 2/18/2019 | 2/19/2019 | 2/19/2019 | P | PASS |
Brandon Shaw
|
|
|
Soffit Please Phone #: ###-#### Inspection requested via web by Kyle Seick
|
BLD-Energy code compliance | 2/13/2019 | 2/13/2019 | 2/13/2019 | P | PASS |
Brandon Shaw
|
|
|
Work in progress
|
BLD-Energy code compliance | 2/11/2019 | 2/12/2019 | 2/12/2019 | P | NR |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
BLD-Framing/Rough-in | 2/8/2019 | 2/8/2019 | 2/11/2019 | P | PART |
Brandon Shaw
|
|
|
Per plans- (3) 2x6 header needed at man door from garage... Anchor bolts to be no more than 12" from ends of sill plate... Positive connection required for 3 ply truss in garage, see orange paint...
|
BLD-Wall Bracing | 1/24/2019 | 1/24/2019 | 1/24/2019 | P | CANC |
Brandon Shaw
|
|
|
Work in progress... First floor only...
|
BLD-Foundation | 12/11/2018 | 12/11/2018 | 12/11/2018 | P | PASS |
Brandon Shaw
|
|
|
Work in progress... Frost protection is required...
|
BLD-Footing | 12/10/2018 | 12/10/2018 | 12/10/2018 | A | PASS |
Brandon Shaw
|
|
|
Work in progress... Frost protection required...
|
BLD-Footing | 12/6/2018 | 12/7/2018 | 12/7/2018 | A | NR |
Brandon Shaw
|
|
|
As early as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
|
BLD-Footing | 12/6/2018 | 12/6/2018 | 12/6/2018 | P | FAIL |
Brandon Shaw
|
|
|
As per ACI 318... forms, rebar, and soil sub-grade to be a minimum 35 F...
At itme of inspection, average sub-grade temp 11-32 F...
|
PubWorks Subgrade Approval | 12/6/2018 | 12/6/2018 | 12/6/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Inspection Record Card- Bld | | | 11/26/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 11/26/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 10/10/2018 | | |
|
|
|
|
Plan assigned to (RDP) | 9/24/2018 | 9/24/2018 | 10/10/2018 | | DONE |
Rob Patrick
|
|
|
10/11 sfd L2 ePlan
|
Routing - PLAN CHECK | 9/24/2018 | | 10/10/2018 | | PASS |
Rob Patrick
|
|
|
|
1st review completed | | | 10/10/2018 | | DONE |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/10/2018 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 10/10/2018 | | DONE |
|
|
|
met
|
Routing - FIRE | 9/24/2018 | 9/24/2018 | 10/1/2018 | | PASS |
Erika Akin
|
|
|
New SFH 4708 fire flow area, 1750 gpm available. Per alternate request signed 9-6-18, fire flow duration is allowed to be reduced to achieve flow required for homes up to 5000 square feet in Harris Ranch North. Hydrant proximity, access and WUI checked and compliant.
|
Route to Impact Fee Review | 9/24/2018 | 9/27/2018 | 9/25/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing PW Grading-Hillside | 9/24/2018 | | 9/25/2018 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
|
Routing - Addressing | 9/24/2018 | | 9/25/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - MECHANICAL | 9/24/2018 | | 9/25/2018 | | PASS |
Troy James
|
|
|
|
Application received | | | 9/24/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 24 2018 9:25AM
|
Plans ACCEPTED BY PLAN TECH | | | 9/24/2018 | | DONE |
|
|
|
|
Intake Approval | | | 9/24/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/24/2018 | | DONE |
|
|
|
|
Routing - PLANNING | 9/24/2018 | | 9/24/2018 | | PASS |
Sue Cummings
|
|
|
Maximum driveway widthe is 33 ft. in the front setback.
|
Routing - PUBLIC WORKS | 9/24/2018 | | 9/24/2018 | | PASS |
Morgan Webb
|
|
|
|
Routing - Erosion and Sediment | 9/24/2018 | | 9/24/2018 | | PASS |
Michael Zawacki
|
|
|
Foothills lot, site prep inspection required.
|