Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD18-03504
StatusFinaled
Name CBH HOMES
Site Address 6026 N TARAKO AVE
Project Name2-7 Roe Street Townhomes
Customer Number18-03481, 03503 - 03505
ePlanReview 
Description
(4 PERMITS IN EPLAN UNDER BLD18-03481) Permit for the construction of a new 1644 sq. ft., 2 story (first story 730 sq. ft., second story 914 sq. ft.) Townhouse with 3 bedrooms, 2.5 bathrooms, approximately 15 sq. ft. of covered patio/porch and a 515 sq. ft. attached garage per the approved plans and any notations. R-2D zoning and setbacks per planning.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/26/20196/27/20196/27/2019APASS
DetailsTony Young
colby Phone #: ###-####
DOC - Permit Finaled6/27/20196/27/20196/27/2019PPASS
DetailsTony Young
BLD-Blower Door Test Results6/27/20196/27/20196/27/2019PDONE
DetailsTony Young
colby Phone #: ###-####// 4.8
BLD-Energy code compliance5/16/20195/17/20195/17/2019APASS
DetailsBrandon Shaw
colby Phone #: ###-####
BLD-Framing/Rough-in5/14/20195/15/20195/16/2019PPASS
DetailsTony Young
Colby Phone #: ###-####,, ok to insulate
BLD-Wall Bracing4/23/20194/24/20194/24/2019APASS
DetailsJim Sly
Colby Phone #: ###-####
BLD-Other4/8/20194/9/20194/9/2019APASS
DetailsJim Sly
second layer sheet rock // Colby Phone #: ###-####
1st floor
BLD-Wall Bracing4/3/20194/3/20194/3/2019PPART
DetailsJim Sly
Colby-dry wall Phone #: ###-####
Rated wall 1st layer OK.
BLD-Footing3/21/20193/21/20193/22/2019PPART
DetailsTony Young
Colby Phone #: ###-####,, interior slab footings, work in progress, ok
BLD-Foundation3/7/20193/8/20193/8/2019PPART
DetailsTony Young
Dane Phone #: ###-####, work in progress,, ok
BLD-Footing3/6/20193/7/20193/7/2019PPART
DetailsTony Young
Dane Phone #: ###-####,, work in progress
Issue PAID IN FULL permit  2/19/2019 DONE
OVERRIDE  1/11/2019  
Plan assigned to (RDP)1/11/20191/11/20191/11/2019 DONE
DetailsRob Patrick
Routing - PLAN CHECK1/11/2019 1/11/2019 PASS
DetailsRob Patrick
PLANS/APPL TAKEN TO FRONT DESK  1/11/2019 DONE
DetailsRob Patrick
Permit Ready to Issue  1/11/2019 DONE
Routing - Design Review1/11/2019 1/11/2019 PASS
DetailsJosh Wilson
Plan assigned to (M_H)10/26/2018 1/11/2019 DEFR
DetailsMichael Hanson
10/16 sfd L2 ePlan...10/16 Failed; Corrections Needed 10/26 Failed arch sealed and wall bracing. 12/17 Failed arch sealed and wall bracing. MDH
Routing - PLANNING9/27/2018 1/11/2019 PASS
DetailsLeon Letson
Routing - PLAN CHECK12/17/2018 12/17/2018 FAIL
DetailsMichael Hanson
Failed arch sealed and wall bracing. MDH
Plan assigned to (RDP)9/27/20189/27/201810/26/2018 DEFR
DetailsRob Patrick
10/11 sfd L2 ePlan...10/16 Failed; Corrections Needed
Routing - PLAN CHECK9/27/2018 10/26/2018 FAIL
DetailsRob Patrick
10/16 sfd L2 ePlan...10/16 Failed; Corrections Needed 10/26 Failed arch sealed and wall bracing. MDH
1st review completed  10/16/2018 FAIL
DetailsRob Patrick
Route to Impact Fee Review9/27/20189/30/201810/1/2018 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - MECHANICAL9/27/2018 9/27/2018 PASS
DetailsTroy James
Routing - Addressing9/27/2018 9/27/2018 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS9/27/2018 9/27/2018 PASS
DetailsBeverly Mountain
Plans ACCEPTED BY PLAN TECH  9/27/2018 DONE
Recd Pcfee & Taken To Pln CK  9/27/2018 DONE
Intake Approval  9/27/2018 PASS
Application received 9/24/2018   
Application received 9/24/2018