Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD18-03513
StatusFinaled
Name HAUDER BUILDING CO
Site Address 608 N ROSS ST
Project NameRoss Townhomes
Customer Number 
ePlanReviewNo
Description
(TOWNHOME - WITH BLD18-03514) UNIT #2 - Permit for the construction of a new 1560 sq. ft., two story (first story 614 sq. ft., second story 946 sq. ft.) townhouse with 3 bedrooms, 2.5 bathrooms, approximately 158 sq. ft. of covered patio/porch and a 484 sq. ft. attached garage per the approved plans and any notations. R-2 zoning and setbacks per planning. Prescriptive Energy Code is proposed. ***BJM***
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Letter of compliance/Occupancy  8/26/2019 DONE
BLD-Final7/8/20197/10/20197/10/2019APASS
DetailsDave Hannah
Nate Phone #: ###-####
DOC - Permit Finaled7/10/20197/10/20197/10/2019PPASS
DetailsDave Hannah
BLD-Blower Door Test Results7/10/20197/10/20197/10/2019PPASS
DetailsDave Hannah
5.0
BLD-Energy code compliance3/14/20193/14/20193/14/2019PPASS
DetailsDave Hannah
Nate Phone #: ###-####
BLD-Framing/Rough-in3/6/20193/6/20193/14/2019PPASS
DetailsDave Hannah
Nate Phone #: ###-####
BLD-Conference3/7/20193/7/20193/7/2019PPASS
DetailsDave Hannah
Nate Phone #: ###-####
BLD-Conference3/5/20193/5/20193/5/2019PPART
DetailsJim Storey
Nate Phone #: ###-#### ok to insulate pending c/n idems
BLD-Framing/Rough-in2/28/20193/4/20193/4/2019ANR
DetailsJim Storey
Nate Phone #: ###-#### riser height to high/ header needed at fireplace flue// need truss engineering.
BLD-Wall Bracing1/31/20192/1/20192/1/2019APASS
DetailsJim Sly
Nate Phone #: ###-####
Exterior Nailing Only.....OK.
BLD-Foundation12/21/201812/21/201812/21/2018PPASS
DetailsDave Hannah
Brandon Phone #: ###-####-pour time 4:00
BLD-Footing12/21/201812/21/201812/21/2018PPASS
DetailsDave Hannah
Brandon-we think it''s already been inspected but may need signed off Phone #: ###-####
Inspection Record Card- Bld  12/10/2018 DONE
Issue PAID IN FULL permit  12/10/2018 DONE
Telephone call  11/2/2018 DONE
called Nate and told him permit is ready and fee due
OVERRIDE  11/1/2018  
Plan assigned to (BJM)10/9/201810/9/201811/1/2018 DONE
DetailsBrian McGowan
10/09 #402 L2 paper- Corrections Required
Routing - PLAN CHECK11/1/2018 11/1/2018 PASS
DetailsBrian McGowan
Case Summary (BLD)  11/1/2018 DONE
DetailsBrian McGowan
PLANS/APPL TAKEN TO FRONT DESK  11/1/2018 DONE
DetailsBrian McGowan
Inspection Record Card- Bld  11/1/2018 DONE
Permit Ready to Issue  11/1/2018 DONE
DO NOT ISSUE WITHOUT BLD18-03514
Plan resubmittals received  10/18/2018 DONE
Resubmittals received 2 complete sets of drawings & 2 struc calcs & 2 eng cover sheets-took to BJM
1st review completed  10/9/2018 FAIL
DetailsBrian McGowan
Structural questions
Routing - PLAN CHECK10/3/2018 10/9/2018 FAIL
DetailsBrian McGowan
Structural questions
Routing - MECHANICAL  10/3/2018 PASS
DetailsTroy James
Routing - PLANNING9/25/2018 10/2/2018 PASS
DetailsLeon Letson
Route to Impact Fee Review9/25/20189/28/20189/26/2018 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - Addressing9/25/2018 9/25/2018 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS  9/25/2018 PASS
Plans ACCEPTED BY PLAN TECH  9/25/2018 DONE
Intake Approval  9/25/2018 PASS
Recd Pcfee & Taken To Pln CK  9/25/2018 DONE
Plan assigned to (M_H)9/25/2018 9/25/2018 DEFR
DetailsMichael Hanson
10/09 #402 L1 ePlan
Application received 9/24/2018