Letter of compliance/Occupancy | | | 8/26/2019 | | DONE |
|
|
|
|
BLD-Final | 7/8/2019 | 7/10/2019 | 7/10/2019 | A | PASS |
Dave Hannah
|
|
|
Nate Phone #: ###-####
|
DOC - Permit Finaled | 7/10/2019 | 7/10/2019 | 7/10/2019 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Blower Door Test Results | 7/10/2019 | 7/10/2019 | 7/10/2019 | P | PASS |
Dave Hannah
|
|
|
5.0
|
BLD-Energy code compliance | 3/14/2019 | 3/14/2019 | 3/14/2019 | P | PASS |
Dave Hannah
|
|
|
Nate Phone #: ###-####
|
BLD-Framing/Rough-in | 3/6/2019 | 3/6/2019 | 3/14/2019 | P | PASS |
Dave Hannah
|
|
|
Nate Phone #: ###-####
|
BLD-Conference | 3/7/2019 | 3/7/2019 | 3/7/2019 | P | PASS |
Dave Hannah
|
|
|
Nate Phone #: ###-####
|
BLD-Conference | 3/5/2019 | 3/5/2019 | 3/5/2019 | P | PART |
Jim Storey
|
|
|
Nate Phone #: ###-#### ok to insulate pending c/n idems
|
BLD-Framing/Rough-in | 2/28/2019 | 3/4/2019 | 3/4/2019 | A | NR |
Jim Storey
|
|
|
Nate Phone #: ###-#### riser height to high/ header needed at fireplace flue// need truss engineering.
|
BLD-Wall Bracing | 1/31/2019 | 2/1/2019 | 2/1/2019 | A | PASS |
Jim Sly
|
|
|
Nate Phone #: ###-#### Exterior Nailing Only.....OK.
|
BLD-Foundation | 12/21/2018 | 12/21/2018 | 12/21/2018 | P | PASS |
Dave Hannah
|
|
|
Brandon Phone #: ###-####-pour time 4:00
|
BLD-Footing | 12/21/2018 | 12/21/2018 | 12/21/2018 | P | PASS |
Dave Hannah
|
|
|
Brandon-we think it''s already been inspected but may need signed off Phone #: ###-####
|
Inspection Record Card- Bld | | | 12/10/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 12/10/2018 | | DONE |
|
|
|
|
Telephone call | | | 11/2/2018 | | DONE |
|
|
|
called Nate and told him permit is ready and fee due
|
OVERRIDE | | | 11/1/2018 | | |
|
|
|
|
Plan assigned to (BJM) | 10/9/2018 | 10/9/2018 | 11/1/2018 | | DONE |
Brian McGowan
|
|
|
10/09 #402 L2 paper- Corrections Required
|
Routing - PLAN CHECK | 11/1/2018 | | 11/1/2018 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 11/1/2018 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/1/2018 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 11/1/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/1/2018 | | DONE |
|
|
|
DO NOT ISSUE WITHOUT BLD18-03514
|
Plan resubmittals received | | | 10/18/2018 | | DONE |
|
|
|
Resubmittals received 2 complete sets of drawings & 2 struc calcs & 2 eng cover sheets-took to BJM
|
1st review completed | | | 10/9/2018 | | FAIL |
Brian McGowan
|
|
|
Structural questions
|
Routing - PLAN CHECK | 10/3/2018 | | 10/9/2018 | | FAIL |
Brian McGowan
|
|
|
Structural questions
|
Routing - MECHANICAL | | | 10/3/2018 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 9/25/2018 | | 10/2/2018 | | PASS |
Leon Letson
|
|
|
|
Route to Impact Fee Review | 9/25/2018 | 9/28/2018 | 9/26/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - Addressing | 9/25/2018 | | 9/25/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | | | 9/25/2018 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/25/2018 | | DONE |
|
|
|
|
Intake Approval | | | 9/25/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/25/2018 | | DONE |
|
|
|
|
Plan assigned to (M_H) | 9/25/2018 | | 9/25/2018 | | DEFR |
Michael Hanson
|
|
|
10/09 #402 L1 ePlan
|
Application received | | 9/24/2018 | | | |
|
|
|
|