BLD-Final | 7/8/2019 | 7/10/2019 | 7/10/2019 | A | PASS |
Dave Hannah
|
|
|
Nate Phone #: ###-####
|
DOC - Permit Finaled | 7/10/2019 | 7/10/2019 | 7/10/2019 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Blower Door Test Results | 7/10/2019 | 7/10/2019 | 7/10/2019 | P | PASS |
Dave Hannah
|
|
|
4.5
|
BLD-Energy code compliance | 3/12/2019 | 3/13/2019 | 3/13/2019 | A | PASS |
Dave Hannah
|
|
|
nate Phone #: ###-####
|
BLD-Framing/Rough-in | 3/7/2019 | 3/7/2019 | 3/7/2019 | P | PASS |
Dave Hannah
|
|
|
Nate Phone #: ###-####
|
BLD-Wall Bracing | 1/31/2019 | 2/1/2019 | 2/1/2019 | A | PASS |
Jim Sly
|
|
|
Nate Phone #: ###-#### Exterior Nailing Only.....OK
|
BLD-Conference | 1/22/2019 | 1/23/2019 | 1/23/2019 | A | FAIL |
Mike Jordan
|
|
|
Nate Phone #: ###-####. Contractor to provide a listed assembly to reflect the as built condition. The as built 2hr. fire wall does not match the approved plans.
|
BLD-Foundation | 12/21/2018 | 12/21/2018 | 12/21/2018 | P | PASS |
Dave Hannah
|
|
|
Brandon-pour time 4:00 Phone #: ###-####
|
BLD-Footing | 12/19/2018 | 12/20/2018 | 12/20/2018 | P | PASS |
Dave Hannah
|
|
|
Brandon-pour time 4:00 Phone #: ###-####
|
BLD-Footing | 12/19/2018 | 12/19/2018 | 12/19/2018 | P | CANC |
Dave Hannah
|
|
|
Brandon-pour time 4:00 Phone #: ###-####
|
Issue PAID IN FULL permit | | | 12/10/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/10/2018 | | DONE |
|
|
|
|
Telephone call | | | 11/2/2018 | | DONE |
|
|
|
called Nate and told him permit is ready and fee due
|
OVERRIDE | | | 11/1/2018 | | |
|
|
|
|
Plan assigned to (BJM) | 10/9/2018 | 10/9/2018 | 11/1/2018 | | DONE |
Brian McGowan
|
|
|
10/09 #402 L2 paper- Corrections Required
|
Routing - PLAN CHECK | 11/1/2018 | | 11/1/2018 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 11/1/2018 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/1/2018 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 11/1/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/1/2018 | | DONE |
|
|
|
DO NOT ISSUE WITHOUT BLD18-03513
|
1st review completed | | | 10/9/2018 | | FAIL |
Brian McGowan
|
|
|
Structural questions
|
Routing - PLAN CHECK | 10/3/2018 | | 10/9/2018 | | FAIL |
Brian McGowan
|
|
|
Structural questions
|
Routing - MECHANICAL | | | 10/3/2018 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 9/25/2018 | | 10/2/2018 | | PASS |
Leon Letson
|
|
|
|
Route to Impact Fee Review | 9/25/2018 | 9/28/2018 | 9/26/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - Addressing | 9/25/2018 | | 9/25/2018 | | PASS |
Doug Chausow
|
|
|
Corrected address 2614 W Pleasonton Ave (this side of duplex faces Pleasonton Ave)
|
Routing - PUBLIC WORKS | | | 9/25/2018 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/25/2018 | | DONE |
|
|
|
|
Intake Approval | | | 9/25/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/25/2018 | | DONE |
|
|
|
|
Plan assigned to (M_H) | 9/25/2018 | | 9/25/2018 | | DEFR |
Michael Hanson
|
|
|
10/09 #402 L1 ePlan
|
Application received | | 9/24/2018 | | | |
|
|
|
|