Permit Information
Permit NumberBLD18-03514
StatusFinaled
Name HAUDER BUILDING CO
Site Address 2814 W PLEASANTON AVE
Project NameRoss Townhomes
Customer NumberDEMO BLD18-03073
ePlanReviewNo
Description
(TOWNHOME - WITH BLD18-03513) UNIT #1 - Permit for the construction of a new 1538 sq. ft., two story (first story 658 sq. ft., second story 880 sq. ft.) townhouse with 3 bedrooms, 2.5 bathrooms, approximately 144 sq. ft. of covered patio/porch and a 484 sq. ft. attached garage per the approved plans and any notations. R-2 zoning and setbacks per planning. Prescriptive Energy Code proposed. ***BJM***
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/8/20197/10/20197/10/2019APASS
DetailsDave Hannah
Nate Phone #: ###-####
DOC - Permit Finaled7/10/20197/10/20197/10/2019PPASS
DetailsDave Hannah
BLD-Blower Door Test Results7/10/20197/10/20197/10/2019PPASS
DetailsDave Hannah
4.5
BLD-Energy code compliance3/12/20193/13/20193/13/2019APASS
DetailsDave Hannah
nate Phone #: ###-####
BLD-Framing/Rough-in3/7/20193/7/20193/7/2019PPASS
DetailsDave Hannah
Nate Phone #: ###-####
BLD-Wall Bracing1/31/20192/1/20192/1/2019APASS
DetailsJim Sly
Nate Phone #: ###-####
Exterior Nailing Only.....OK
BLD-Conference1/22/20191/23/20191/23/2019AFAIL
DetailsMike Jordan
Nate Phone #: ###-####. Contractor to provide a listed assembly to reflect the as built condition. The as built 2hr. fire wall does not match the approved plans.
BLD-Foundation12/21/201812/21/201812/21/2018PPASS
DetailsDave Hannah
Brandon-pour time 4:00 Phone #: ###-####
BLD-Footing12/19/201812/20/201812/20/2018PPASS
DetailsDave Hannah
Brandon-pour time 4:00 Phone #: ###-####
BLD-Footing12/19/201812/19/201812/19/2018PCANC
DetailsDave Hannah
Brandon-pour time 4:00 Phone #: ###-####
Issue PAID IN FULL permit  12/10/2018 DONE
Inspection Record Card- Bld  12/10/2018 DONE
Telephone call  11/2/2018 DONE
called Nate and told him permit is ready and fee due
OVERRIDE  11/1/2018  
Plan assigned to (BJM)10/9/201810/9/201811/1/2018 DONE
DetailsBrian McGowan
10/09 #402 L2 paper- Corrections Required
Routing - PLAN CHECK11/1/2018 11/1/2018 PASS
DetailsBrian McGowan
Case Summary (BLD)  11/1/2018 DONE
DetailsBrian McGowan
PLANS/APPL TAKEN TO FRONT DESK  11/1/2018 DONE
DetailsBrian McGowan
Inspection Record Card- Bld  11/1/2018 DONE
Permit Ready to Issue  11/1/2018 DONE
DO NOT ISSUE WITHOUT BLD18-03513

1st review completed  10/9/2018 FAIL
DetailsBrian McGowan
Structural questions
Routing - PLAN CHECK10/3/2018 10/9/2018 FAIL
DetailsBrian McGowan
Structural questions
Routing - MECHANICAL  10/3/2018 PASS
DetailsTroy James
Routing - PLANNING9/25/2018 10/2/2018 PASS
DetailsLeon Letson
Route to Impact Fee Review9/25/20189/28/20189/26/2018 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - Addressing9/25/2018 9/25/2018 PASS
DetailsDoug Chausow
Corrected address 2614 W Pleasonton Ave (this side of duplex faces Pleasonton Ave)
Routing - PUBLIC WORKS  9/25/2018 PASS
Plans ACCEPTED BY PLAN TECH  9/25/2018 DONE
Intake Approval  9/25/2018 PASS
Recd Pcfee & Taken To Pln CK  9/25/2018 DONE
Plan assigned to (M_H)9/25/2018 9/25/2018 DEFR
DetailsMichael Hanson
10/09 #402 L1 ePlan
Application received 9/24/2018