BLD-Final | 5/23/2019 | 5/24/2019 | 5/24/2019 | P | PASS |
Jim Sly
|
|
|
Heather- please call for access Phone #: ###-####
|
DOC - Permit Finaled | 5/24/2019 | 5/24/2019 | 5/24/2019 | P | PASS |
Jim Sly
|
|
|
|
BLD-Energy code compliance | 2/1/2019 | 2/4/2019 | 2/4/2019 | P | PASS |
Jim Sly
|
|
|
Michael Phone #: ###-####
|
BLD-Final | 1/31/2019 | 1/31/2019 | 1/31/2019 | P | CANC |
Dave Hannah
|
|
|
Michael Phone #: ###-####
|
BLD-Framing/Rough-in | 1/31/2019 | 1/31/2019 | 1/31/2019 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Conference | 1/29/2019 | 1/30/2019 | 1/30/2019 | A | DONE |
Brandon Shaw
|
|
|
As per discussion with electrician, insulator, and home owner- Fire caulk all openings in electrical service box, and foam/air seal around said box. Electrician and insulator to take pictures and submit to home owner....
|
BLD-Final | 1/29/2019 | 1/30/2019 | 1/30/2019 | A | CANC |
Brandon Shaw
|
|
|
Michael Phone #: ###-####
|
BLD-Wall Bracing | 1/22/2019 | 1/23/2019 | 1/23/2019 | A | PASS |
Jim Sly
|
|
|
Mikael Phone #: ###-####
|
BLD-Footing | 1/17/2019 | 1/18/2019 | 1/18/2019 | A | PASS |
Jim Sly
|
|
|
Val Phone #: ###-#### Footing for Patio cover........OK.
|
Plan assigned to (JAB) Josh | 1/15/2019 | 1/15/2019 | 1/15/2019 | | PASS |
Josh Bogle
|
|
|
|
Routing Walk-In (Zoning) | 1/15/2019 | 1/15/2019 | 1/15/2019 | P | DONE |
Sue Cummings
|
|
|
plan mod, adding patio cover
|
Routing Walk-In (BLD) | 1/15/2019 | 1/15/2019 | 1/15/2019 | P | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 1/15/2019 | | 1/15/2019 | | PASS |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 1/15/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/15/2019 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 1/15/2019 | | DONE |
|
|
|
plan mod approved
|
CHANGE STATUS TO (ISS) | | | 1/15/2019 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 1/15/2019 | | DONE |
|
|
|
adding patio cover
|
BLD-Framing/Rough-in | 12/17/2018 | 12/18/2018 | 12/18/2018 | A | NR |
Jim Sly
|
|
|
Troy Phone #: ###-#### Need all trade approvals.
|
BLD-Footing | 12/17/2018 | 12/18/2018 | 12/18/2018 | A | PASS |
Jim Sly
|
|
|
Troy Phone #: ###-####
|
Issue PAID IN FULL permit | | | 10/17/2018 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 10/16/2018 | 10/16/2018 | 10/16/2018 | A | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 10/16/2018 | | 10/16/2018 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 10/16/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 10/16/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/16/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 10/16/2018 | | DONE |
|
|
|
met
|
Telephone call | | | 10/16/2018 | | DONE |
|
|
|
Left voicemail stating the permit is ready and what fees are due.
|
Routing Walk-In (Zoning) | 10/5/2018 | 10/5/2018 | 10/5/2018 | P | DONE |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 10/5/2018 | 10/5/2018 | 10/5/2018 | P | FAIL |
Josh Bogle
|
|
|
|
1st review completed | | | 10/5/2018 | | DONE |
Josh Bogle
|
|
|
|
Application received | | | 9/25/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 25 2018 10:57AM
|