BLD-Final | 10/7/2019 | 10/7/2019 | 10/7/2019 | P | PASS |
Brandon Shaw
|
|
|
call 20 mins. before // greg Phone #: ###-####
|
DOC - Permit Finaled | 10/7/2019 | 10/7/2019 | 10/7/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 10/7/2019 | 10/7/2019 | 10/7/2019 | P | DONE |
Brandon Shaw
|
|
|
ACH50- 2.39
|
BLD-Final | 10/3/2019 | 10/4/2019 | 10/4/2019 | A | NR |
Dave Hannah
|
|
|
call for access 20 mins- Greg Phone #: ###-#### ok to final after energy cert and blower door is done
|
BLD-Energy code compliance | 7/11/2019 | 7/12/2019 | 7/12/2019 | A | PASS |
Dave Hannah
|
|
|
MIKE Phone #: ###-####
|
BLD-Framing/Rough-in | 7/2/2019 | 7/2/2019 | 7/2/2019 | P | PASS |
Dave Hannah
|
|
|
Scott Phone #: ###-####
|
BLD-Wall Bracing | 6/13/2019 | 6/13/2019 | 6/13/2019 | P | PASS |
Dave Hannah
|
|
|
Phone #: ###-####
|
BLD-Wall Bracing | 6/7/2019 | 6/7/2019 | 6/7/2019 | P | PASS |
Dave Hannah
|
|
|
SHEAR // Scott Phone #: ###-####
|
BLD-Conference | 3/25/2019 | 3/25/2019 | 3/25/2019 | P | PASS |
Brandon Shaw
|
|
|
Foundation... Work in progress...
|
BLD-Footing | 3/22/2019 | 3/22/2019 | 3/22/2019 | P | PASS |
Dave Hannah
|
|
|
As early as possible Phone #: 2089656103 >> Inspection requested via mobile web by Alvaro
|
PubWorks Subgrade Approval | 3/21/2019 | 3/21/2019 | 3/21/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. A footing inspection may now be scheduled with the Building Department.
|
PubWorks Subgrade Approval | 1/15/2019 | 1/15/2019 | 1/15/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Issue PAID IN FULL permit | | | 11/20/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 10/17/2018 | | |
|
|
|
|
Telephone call | | | 10/17/2018 | | DONE |
|
|
|
called Falash & Co. and told recep permit is ready and fee due.
|
1st review completed | | | 10/17/2018 | | DONE |
Michael Hanson
|
|
|
|
Case Summary (BLD) | | | 10/17/2018 | | DONE |
Michael Hanson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/17/2018 | | DONE |
Michael Hanson
|
|
|
|
Inspection Record Card- Bld | | | 10/17/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/17/2018 | | DONE |
|
|
|
all met
|
Plan assigned to (M_H) | 9/25/2018 | | 10/17/2018 | | DONE |
Michael Hanson
|
|
|
10/15 #402 L2 Paper
|
Routing - PLAN CHECK | 10/2/2018 | | 10/17/2018 | | PASS |
Michael Hanson
|
|
|
|
Routing - PLANNING | 9/27/2018 | | 10/17/2018 | | PASS |
Sue Cummings
|
|
|
Per Sue Cummings plan signature. MDH
|
Routing - MECHANICAL | | | 10/2/2018 | | PASS |
Troy James
|
|
|
|
Routing - PUBLIC WORKS | 9/25/2018 | | 9/27/2018 | | PASS |
Beverly Mountain
|
|
|
|
Route to Impact Fee Review | 9/25/2018 | 9/28/2018 | 9/26/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - Addressing | 9/25/2018 | | 9/26/2018 | | PASS |
Doug Chausow
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/25/2018 | | DONE |
|
|
|
|
Intake Approval | | | 9/25/2018 | | PASS |
|
|
|
|
Override - Parcel Holds | | | 9/25/2018 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/25/2018 | | DONE |
|
|
|
|
Application received | | 9/25/2018 | | | |
|
|
|
|