Third Notice | | 2/12/2019 | 3/11/2019 | | DONE |
|
|
|
mailed 3-12-19
|
Second Notice | | 1/17/2019 | 2/7/2019 | | DONE |
|
|
|
mailed 2-11-19
|
First Notice | 12/18/2018 | 12/18/2018 | 1/7/2019 | | DONE |
Brandon Shaw
|
|
|
mailed 1-11-19
|
BLD-Final | 12/17/2018 | 12/18/2018 | 12/18/2018 | A | PASS |
Brandon Shaw
|
|
|
opens at 9 // paul Phone #: ###-####
|
DOC - Permit Finaled | 12/18/2018 | 12/18/2018 | 12/18/2018 | P | PASS |
Brandon Shaw
|
|
|
|
FIRE-Final Inspection | 12/14/2018 | 12/17/2018 | 12/17/2018 | A | PASS |
Jim Page
|
|
|
Final life fire safety inspection for area of work complete.
Paul Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 11/14/2018 | 11/14/2018 | 11/14/2018 | P | PASS |
Jim Sly
|
|
|
Paul Phone #: ###-####
|
BLD-Framing/Rough-in | 10/25/2018 | 10/26/2018 | 10/26/2018 | A | PART |
Tony Young
|
|
|
Paul Phone #: ###-####,, walls ok
|
Issue PAID IN FULL permit | | | 10/15/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/15/2018 | | DONE |
|
|
|
|
Plan assigned to (JHB) | 10/8/2018 | 10/8/2018 | 10/12/2018 | | PASS |
Joe Bruce
|
|
|
10/10 (L1) - Idaho Central Credit Union
|
Routing - PLAN CHECK | 10/8/2018 | | 10/12/2018 | | PASS |
Joe Bruce
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/12/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/12/2018 | | DONE |
|
|
|
NEED
GC
Rev cert of val
|
1st review completed | | | 10/12/2018 | | DONE |
|
|
|
|
Intake Approval | | | 10/4/2018 | | PASS |
|
|
|
|
Intake Approval | | | 10/1/2018 | | FAIL |
Joe Bruce
|
|
|
1) Sheets M0.0 and M1.1 do not have the required space reserved for City approval stamps as specified in the Electronic Plans Submittal Standards. Revise sheets with a blank 4” x 2” space located 3” off the right sheet edge to allow for the title block. Verify all sheets have the required space for city approval stamp.
|
Application received | | | 9/26/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 26 2018 9:06AM
|