BLD-Foundation | 11/5/2018 | 11/6/2018 | 11/6/2018 | A | PASS |
Jim Storey
|
|
|
rebar- Mark Phone #: ###-####
|
Issue PAID IN FULL permit | | | 11/1/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 10/16/2018 | | |
|
|
|
|
Routing Walk-In (BLD) | 10/16/2018 | 10/16/2018 | 10/16/2018 | A | DONE |
Josh Bogle
|
|
|
|
Plan assigned to (JAB) Josh | 10/4/2018 | 10/4/2018 | 10/16/2018 | | PASS |
Josh Bogle
|
|
|
10/10 pool, paper - 1st done
|
Routing PW Grading-Hillside | 10/16/2018 | | 10/16/2018 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the pool subgrade is acceptable must be approved by Public Works prior to scheduling inspections. Please allow 24 hours for subgrade approval processing. If you have any questions call Melissa Jannusch ###-####.
|
Routing - PUBLIC WORKS | 10/16/2018 | | 10/16/2018 | | PASS |
Morgan Webb
|
|
|
|
Routing - PLAN CHECK | 10/16/2018 | | 10/16/2018 | | PASS |
Josh Bogle
|
|
|
all good with Hillside now
|
Inspection Record Card- Bld | | | 10/16/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 10/16/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/16/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 10/16/2018 | | DONE |
|
|
|
Need
RP
|
Telephone call | | | 10/16/2018 | | DONE |
|
|
|
Spoke with Lance to inform him the permit is ready, we need a RP and what fees are due.
|
1st review completed | | | 10/9/2018 | | FAIL |
Josh Bogle
|
|
|
see Hillside review
|
Routing - Erosion and Sediment | 10/4/2018 | | 10/9/2018 | | PASS |
Andy J. Long
|
|
|
Approved. Utilize SFH ESC plan. No site prep required. Certified RP
|
Routing - PLAN CHECK | 10/4/2018 | | 10/9/2018 | | PASS |
Josh Bogle
|
|
|
|
Routing PW Grading-Hillside | 10/4/2018 | | 10/8/2018 | | FAIL |
Melissa Jannusch
|
|
|
Please provide copies of the geotechnical report and grading and drainage plans.
|
Plan resubmittals received | | | 10/8/2018 | | DONE |
|
|
|
received two sets of Geotech report and 18 X 24 C1 drawing. Plans stamped and taken to plan review
|
Routing Walk-In (Zoning) | 10/4/2018 | 10/4/2018 | 10/4/2018 | A | DONE |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 10/4/2018 | 10/4/2018 | 10/4/2018 | A | PASS |
Josh Bogle
|
|
|
took in as a level 2 for Hillside & ESC review
|
Routing Walk-In (Zoning) | 9/27/2018 | 9/27/2018 | 9/27/2018 | P | PASS |
Josh Bogle
|
|
|
no contact with applicant
|
Application received | | 9/27/2018 | | | |
|
|
|
|
Routing - PUBLIC WORKS | 10/8/2018 | | | | FAIL |
|
|
|
SEE HILLSIDE FOR FAIL
|