BLD-Final | 1/25/2019 | 1/28/2019 | 1/28/2019 | A | PASS |
Jim Storey
|
|
|
Call half hour before to be let in // Andy Phone #: ###-####
|
DOC - Permit Finaled | 1/28/2019 | 1/28/2019 | 1/28/2019 | P | PASS |
Jim Storey
|
|
|
|
BLD-Framing/Rough-in | 11/1/2018 | 11/2/2018 | 11/2/2018 | A | PASS |
Jim Storey
|
|
|
Please call ahead for access - Andy Phone #: ###-####
|
Routing Walk-In (BLD) | 10/16/2018 | 10/16/2018 | 10/16/2018 | A | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 10/16/2018 | | 10/16/2018 | | PASS |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 10/16/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/16/2018 | | DONE |
Josh Bogle
|
|
|
no fee
|
CHANGE STATUS TO (ISS) | | | 10/16/2018 | | |
|
|
|
|
Inspection Record Card- Bld | | | 10/16/2018 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 10/16/2018 | | DONE |
|
|
|
Plan mod accepted-turned in sheets A6.0, A7.0, SK-S1-additional engineering on roof/changing roof system-1 set of eng calcs
|
Routing Walk-In (BLD) | 9/28/2018 | 9/28/2018 | 9/28/2018 | P | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 9/28/2018 | | 9/28/2018 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 9/28/2018 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 9/28/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 9/28/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/28/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 9/28/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 9/28/2018 | | DONE |
|
|
|
|
Application received | | 9/28/2018 | | | |
|
|
|
|