Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD18-03595
StatusFinaled
Name STRAIGHT LINE BUILDING SOLUTIONS LL
Site Address 5941 W VANDAL LN
Project NameVanilla
Customer Number 
ePlanReviewYes
Description
**(VANILLA)** NO OCCUPANCY ALLOWED UNDER THIS PERMIT. TENANT SHALL APPLY FOR CERTIFICATE OF OCCUPANCY PRIOR TO OCCUPYING THE SPACE. Permit is to remodel an existing 17,855 sq. ft. vanilla warehouse tenant space that was created under BLD18-03157. Approval is contingent upon adhering to the approved plans on file and plan review report. Work to include: removal of select overhead doors and man door in unpermitted openings by previous tenants, construction of select 2-hour rated wall infill to address unpermitted interior rated wall openings by previous tenants, construction of select interior nonbearing walls within the existing warehouse area to create a mechanical room, a closet, a break room, a conference room, an office, open office area and (2) accessible restrooms, select new door/door frames, millwork, Hi/Lo drinking fountain, select new suspended acoustic and gypsum ceiling, select new light fixtures, electrical work, plumbing work, mechanical work and interior finishes in compliance with Ch. 8 of the current IBC. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 2/17/20192/14/2019 DONE
This permit finaled on the web by Brian McCoy
First Notice1/17/20191/17/20192/7/2019 DONE
DetailsMike Jordan
mailed 2-11-19
BLD-Final1/16/20191/17/20191/17/2019PPASS
DetailsMike Jordan
Shawn Phone #: ###-####
DOC - Permit Finaled1/17/20191/17/20191/17/2019PPASS
DetailsMike Jordan
FIRE-Final Inspection1/16/20191/17/20191/17/2019APASS
DetailsTroy Cobbley
Life safety passed. One plan shows exit sign at door from warehouse to office, another plan does not show this exit sign. Currently there is no exit sign installed. May be required at occupancy. This permit is for Vanilla Finish, no occupancy.

Shawn Phone #: ###-####
BLD-Ceiling Grid Inspection1/3/20191/3/20191/3/2019PPASS
DetailsMike Jordan
Shawn Phone #: ###-####
BLD-Framing/Rough-in11/26/201811/26/201811/26/2018PPASS
DetailsMike Jordan
Sean Phone #: ###-####
Plan assigned to (JG)10/18/201810/18/201811/5/2018 PASS
DetailsJavier Guzman
10/30 L2 Vanilla ePlan, pend fire
1st review completed  11/5/2018 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  11/5/2018 DONE
Permit Ready to Issue  11/5/2018 DONE
NEED- all met
GC FORM
REVISED VALUE
Inspection Record Card- Bld  11/5/2018 DONE
Issue PAID IN FULL permit  11/5/2018 DONE
Routing - FIRE10/18/201810/18/201811/1/2018 PASS
DetailsErika Akin
Attached comments to case
Routing - PLAN CHECK10/18/2018 10/31/2018 PASS
DetailsJavier Guzman
Routing - MECHANICAL10/18/2018 10/24/2018 PASS
DetailsTroy James
Routing PW Environmental10/18/2018 10/23/2018 PASS
DetailsRick Christenson
Routing - Addressing10/18/2018 10/19/2018 PASS
DetailsDoug Chausow
Updated address: 5941 W Vandal Ln
Routing - PUBLIC WORKS10/18/2018 10/18/2018 PASS
DetailsMorgan Webb
REACHED OUT TO CONTACT AND THEY VERIFIED THERE WERE NO EXISTING FIXTURES.
Routing - Design Review10/18/2018 10/18/2018 PASS
DetailsKatelyn Menuge
Intake Approval  10/17/2018 PASS
DetailsJavier Guzman
Intake Approval  10/2/2018 FAIL
DetailsJavier Guzman
Provide and upload the following:
• Letter of approval for the new storefront
• Engineered mechanical plans for new mechanical work being installed
• The existing south demising wall with the openings is a two-hour wall, the openings were never approved in the past and the wall is required to maintain the two-hour rating, provide details of the rated openings
Application received  9/29/2018 DONE
Application submitted via PDS Online on Sep 29 2018 8:56AM