BLD-Foundation | 2/6/2019 | 2/7/2019 | 2/7/2019 | P | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Clayn Sonderegger
|
BLD-Foundation | 2/5/2019 | 2/5/2019 | 2/6/2019 | P | DONE |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Clayn Sonderegger
|
BLD-Foundation | 2/1/2019 | 2/4/2019 | 2/5/2019 | P | PEND |
Dave Hannah
|
|
|
As late as possible. Please call 30 minutes before arriving. Phone #: ###-#### Inspection requested via web by Clayn Sonderegger ok after sp inpection sign off
|
Issue PAID IN FULL permit | | | 1/16/2019 | | DONE |
|
|
|
emailed cmatthews@neudesignarch.com (GC has no email attached) the building permit to sign and send back
|
Inspection Record Card- Bld | | | 1/16/2019 | | DONE |
|
|
|
|
Telephone call | | | 1/15/2019 | | DONE |
|
|
|
emailed Clayn the fees due
|
Plan assigned to (JAR) | 10/10/2018 | 10/10/2018 | 1/10/2019 | | DONE |
Julie Romig
|
|
|
1st Rev Comp - 3rd Rev Comp - L3 Cambridge Apartments
|
Routing - PLAN CHECK | 1/7/2019 | | 1/10/2019 | | PASS |
Julie Romig
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/10/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/10/2019 | | DONE |
|
|
|
all met-NEED
GC-met
Rev cert of val-met
|
Routing - PLAN CHECK | 1/4/2019 | | 1/7/2019 | | FAIL |
Julie Romig
|
|
|
|
Routing - Design Review | 1/4/2019 | | 1/4/2019 | | PASS |
KayCee Babb
|
|
|
|
Routing - PLAN CHECK | 12/12/2018 | | 12/19/2018 | | FAIL |
Julie Romig
|
|
|
2nd Review - report emailed to architect.
|
Routing Off Site - STRUCTURAL | 12/12/2018 | | 12/19/2018 | | PASS |
Julie Romig
|
|
|
AHJ 2nd Review
|
Routing - Design Review | 12/19/2018 | | 12/19/2018 | | PASS |
KayCee Babb
|
|
|
per CZC18-00218 revised plans.
|
Route to Impact Fee Review | 11/15/2018 | 11/18/2018 | 11/15/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 11/14/2018 | | FAIL |
Julie Romig
|
|
|
|
Routing - PLAN CHECK | 10/10/2018 | | 11/14/2018 | | FAIL |
Julie Romig
|
|
|
|
Routing - FIRE | 10/10/2018 | 10/10/2018 | 11/13/2018 | | CANC |
Adele J Schaffeld-Griffin
|
|
|
no fire review 11/01 Cambridge Apt L3
|
Routing Off Site - STRUCTURAL | 10/10/2018 | | 10/23/2018 | | FAIL |
Julie Romig
|
|
|
AHJ - Corrections required per ePlanReview
|
Routing - Design Review | 10/10/2018 | | 10/15/2018 | | PASS |
KayCee Babb
|
|
|
Per CZC18-00218 revised 10-12-18. Front stairs meet setback requirements and may be reconstructed.
|
Routing - Erosion and Sediment | 10/10/2018 | | 10/11/2018 | | PASS |
Michael Zawacki
|
|
|
|
Routing - Addressing | 10/10/2018 | | 10/10/2018 | | PASS |
Doug Chausow
|
|
|
|
Intake Approval | | | 10/5/2018 | | FAIL |
Joe Bruce
|
|
|
1) Provide a #520 - Major TI Submittal Checklist that is completely filled out with all required items uploaded. This checklist must be completed even for electronic submittal.
2) Missing form #304 - Registered Design Professional form.
3) Missing site specific fire flow at hydrants letter.
4) Missing planning and zoning letters of approval.
5) Some sheets do not have the required space reserved for City approval stamps as specified in the Electronic Plans Submittal Standards. Revise sheets with a blank 4” x 2” space located 3” off the right sheet edge to allow for the title block. Verify all sheets have the required space for city approval stamp. The cover sheet (G-001) needs to have a 4"x4" space located 3” off the right sheet edge to allow for the title block.
6) On the Checklist: List the page that the required information is on for the architectural and structural plans.
|
Intake Approval | | | 10/5/2018 | | PASS |
|
|
|
|
Application received | | | 10/1/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 1 2018 1:26PM
|