BLD-Final | 7/29/2020 | 7/30/2020 | 7/30/2020 | A | PASS |
Brandon Shaw
|
|
|
Lockbox on the hose bib. Code is 1987 Phone #: ###-#### Inspection requested via web by Tyler Hildebrand
|
DOC - Permit Finaled | 7/30/2020 | 7/30/2020 | 7/30/2020 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 7/30/2020 | 7/30/2020 | 7/30/2020 | A | DONE |
Brandon Shaw
|
|
|
ACH50- 4.2
|
BLD-Final | 6/17/2020 | 6/18/2020 | 6/18/2020 | A | FAIL |
Brandon Shaw
|
|
|
Address to be readily visable... Post Blower door test... Glazing at stiar landing to be tempered...
|
BLD-Aging Inspection | 12/27/2019 | 12/27/2019 | 12/27/2019 | | DEFR |
Brandon Shaw
|
|
|
|
Extend Permit 90/180 days | 12/27/2019 | 12/27/2019 | 12/27/2019 | P | DONE |
Brandon Shaw
|
|
|
|
BLD-Aging Inspection | 8/15/2019 | 8/15/2019 | 8/15/2019 | | PASS |
Brandon Shaw
|
|
|
|
Extend Permit 90/180 days | 8/15/2019 | 8/15/2019 | 8/15/2019 | P | DEFR |
Brandon Shaw
|
|
|
|
BLD-Energy code compliance | 4/3/2019 | 4/3/2019 | 4/3/2019 | P | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Tyler Hildebrand
|
BLD-Framing/Rough-in | 4/1/2019 | 4/2/2019 | 4/2/2019 | A | PASS |
Jim Storey
|
|
|
* see Joist calculations for penetrations located with the plans on the drywall mud located in kitchen area. Please call after inspection. Phone #: ###-#### Inspection requested via web by Tyler Hildebrand
|
BLD-Framing/Rough-in | 3/22/2019 | 3/25/2019 | 3/25/2019 | A | PART |
Jim Storey
|
|
|
Call if any questions or concerns. Phone #: ###-#### Inspection requested via web by Tyler Hildebrand plm drilled top chord of I joist two locatins need engineer fix from manufacture/ fire blk drop ceilling at walls// need mech insp. // air seal not done.
|
BLD-Aging Inspection | 3/14/2019 | 3/14/2019 | 3/14/2019 | | PASS |
Jim Storey
|
|
|
|
Plan Modification Accepted | | | 1/14/2019 | | DONE |
|
|
|
New manual j report
|
Routing - MECHANICAL | 1/14/2019 | | 1/14/2019 | | PASS |
Troy James
|
|
|
Resubmitted manual j report
|
BLD-Footing | 10/30/2018 | 10/30/2018 | 10/30/2018 | P | PASS |
Jim Storey
|
|
|
Pat Phone #: ###-####
|
Issue PAID IN FULL permit | | | 10/29/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/29/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 10/26/2018 | | |
|
|
|
|
Plan assigned to (J_N) | 10/8/2018 | 10/8/2018 | 10/26/2018 | | DONE |
|
|
|
10/19 sfd L1 ePlan. 2nd review, braced wall line offsets. 1st Review 10/18 need bracing calculations
|
Routing - PLAN CHECK | 10/26/2018 | | 10/26/2018 | | PASS |
Jenny Nelson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/26/2018 | | DONE |
Jenny Nelson
|
|
|
|
Permit Ready to Issue | | | 10/26/2018 | | DONE |
|
|
|
Need
GC FORM
|
Routing - PLAN CHECK | 10/23/2018 | | 10/23/2018 | | FAIL |
Jenny Nelson
|
|
|
|
1st review completed | | | 10/18/2018 | | FAIL |
Jenny Nelson
|
|
|
Need bracing calculations
|
Routing - PLAN CHECK | 10/8/2018 | | 10/18/2018 | | FAIL |
Jenny Nelson
|
|
|
|
Route to Impact Fee Review | 10/8/2018 | 10/11/2018 | 10/9/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - MECHANICAL | 10/8/2018 | | 10/9/2018 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 10/8/2018 | | 10/8/2018 | | PASS |
Sue Cummings
|
|
|
|
Routing - Addressing | 10/8/2018 | | 10/8/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 10/8/2018 | | 10/8/2018 | | PASS |
Morgan Webb
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 10/8/2018 | | DONE |
|
|
|
|
Intake Approval | | | 10/8/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/8/2018 | | DONE |
|
|
|
|
Application received | | | 10/2/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 2 2018 1:47PM
|
Intake Approval | | | 10/2/2018 | | FAIL |
|
|
|
NEED
RESCHECK
MANUAL J
INDICATE ATTICE/CRAWL SPACE
MEC EQUIPMENT (DID NOT SEE FURNACE, AC OR W.H)
|