BLD-Aging Inspection | 2/28/2019 | 2/28/2019 | 3/6/2019 | | PEND |
Dave Hannah
|
|
|
|
BLD-Foundation | 10/15/2018 | 10/16/2018 | 10/16/2018 | P | PASS |
Mike Jordan
|
|
|
Ryan-rebar Phone #: ###-####
|
OVERRIDE | | | 10/2/2018 | | |
|
|
|
|
Routing Walk-In (Zoning) | 10/2/2018 | 10/2/2018 | 10/2/2018 | P | PASS |
David Moser
|
|
|
Site Plan is not accurate. The apron to the swiming pool shall be a minimum of 3-feet from teh south and west property lines. This is noted on the site plan and is a requirement.
|
Routing Walk-In (BLD) | 10/2/2018 | 10/2/2018 | 10/2/2018 | P | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 10/2/2018 | | 10/2/2018 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 10/2/2018 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 10/2/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 10/2/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/2/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 10/2/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 10/2/2018 | | DONE |
|
|
|
|
Application received | | 10/2/2018 | | | |
|
|
|
|