First Notice | 12/12/2019 | 12/12/2019 | 12/16/2019 | | DONE |
Jim Storey
|
|
|
This permit finaled on the web by Jimmy Martin
|
BLD-Final | 12/11/2019 | 12/12/2019 | 12/12/2019 | P | PASS |
Jim Storey
|
|
|
Prefer 1pm if possible Phone #: ###-#### Inspection requested via web by Jimmy Martin
|
DOC - Permit Finaled | 12/12/2019 | 12/12/2019 | 12/12/2019 | P | PASS |
Jim Storey
|
|
|
|
FIRE-Final Inspection | 12/10/2019 | 12/11/2019 | 12/11/2019 | A | PASS |
Jim Page
|
|
|
Final life fire safety inspection for scope of work complete, signature card not available at time of inspection.
Phone #: ###-#### Inspection requested via web by Jimmy Martin
|
FIRE-Final Inspection | 10/28/2019 | 10/29/2019 | 10/29/2019 | A | PASS |
Jim Page
|
|
|
No fire sprinklers, no fire alarms, fire extinguishers are placed with current inspection tags. Final life fire safety inspection for scope of work complete, permenant addressing to be installed when received.
Phone #: ###-#### Inspection requested via web by Jimmy Martin
|
BLD-Framing/Rough-in | 10/21/2019 | 10/21/2019 | 10/21/2019 | P | PASS |
Brandon Shaw
|
|
|
OK to cover, handrails/guardrails to be installed before final...
|
CHANGE STATUS TO (ISS) | | | 3/14/2019 | | DONE |
|
|
|
|
Plan assigned to (JAR) | 1/25/2019 | 1/25/2019 | 2/28/2019 | | DONE |
Julie Romig
|
|
|
03/01 - 1st Rev Comp -2nd Rev - Plan Mod Cottonwoods Apt Glu-lam Beam - revise Glu-Lam beam size at exposed walkway support to qualify as heavy timber and revise detail of dimensional walkway support beam to include full GWB wrap for fireproofing.
Include new column splice detail for replacing damaged portions of heavy timber columns.
|
Routing - PLAN CHECK | 2/21/2019 | | 2/28/2019 | | PASS |
Julie Romig
|
|
|
|
Permit Ready to Issue | | | 2/28/2019 | | DONE |
|
|
|
PLAN MOD FEE ONLY UNDER THIS PERMIT (BLD18-03640) CHANGE STATUS FOR OTHER PERMITS TO ISS
|
Routing - PLAN CHECK | 1/28/2019 | | 2/1/2019 | | FAIL |
Julie Romig
|
|
|
Corrections in ePlanReview
|
Plan Modification Accepted | | | 1/25/2019 | | DONE |
|
|
|
Plan mod - revise Glu-Lam beam size at exposed walkway support to qualify as heavy timber and revise detail of dimensional walkway support beam to include full GWB wrap for fireproofing.
Include new column splice detail for replacing damaged portions of heavy timber columns.
|
Issue PAID IN FULL permit | | | 12/24/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/24/2018 | | DONE |
|
|
|
|
(F) Reprint permit | | | 12/24/2018 | | DONE |
|
|
|
|
Telephone call | | | 12/20/2018 | | DONE |
|
|
|
Spoke with GC to inform them all the fees for all 13 buildings need to be paid before we can issue the permits.
|
Plan assigned to (JAR) | 10/24/2018 | 10/24/2018 | 12/18/2018 | | DONE |
Julie Romig
|
|
|
12/17 - Pending Floodplain Approval - 1st Rev Comp - L3 Cottonwood Apartments Bldg 1
|
Routing - PLANNING | 12/13/2018 | | 12/18/2018 | | PASS |
Nicolette Womack
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/18/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/18/2018 | | DONE |
|
|
|
Need- all met (email jimmy@wood-solution.com)
GC Form
Revised Cert of Value for each building (13 buildings)
(DO NOT ISSUE WITHOUT ALL 13 BUILDING PERMITS HAVE BEEN PAID)(BLD18-03640, BLD18-03644 TO BLD18-03655)
|
Routing PW Flood Plain | 12/13/2018 | | 12/13/2018 | | PASS |
Jason C. Taylor
|
|
|
Project is outside SFHA no floodplain review required. If you have any questions, please call Jason Taylor at ###-####.
|
Routing - PLAN CHECK | 12/13/2018 | | 12/13/2018 | | PASS |
Julie Romig
|
|
|
|
Routing - PLANNING | 11/30/2018 | | 12/11/2018 | | FAIL |
Nicolette Womack
|
|
|
Appeal period ends December 17 at 5 pm for CFH18-00116.
|
Routing PW Flood Plain | 11/30/2018 | | 12/10/2018 | | FAIL |
Jason C. Taylor
|
|
|
A portion of the subject property is within the regulatory floodplain. Please upload all elevation certificates for this site. This project must comply with the Boise Floodplain Ordinance (B.C.C. 11-08). If you have any questions, please call Jason Taylor at ###-####.
|
Plan Reviewer's activity | | | 12/6/2018 | | DONE |
|
|
|
Permit cannot be issued until flood plain certificate CFH18-00116 is approved and the appeal period has passed. All other department reviews have passed.
|
Routing - PLAN CHECK | 11/30/2018 | | 12/6/2018 | | PASS |
Julie Romig
|
|
|
|
Routing - Design Review | 11/30/2018 | | 12/3/2018 | | PASS |
Katelyn Menuge
|
|
|
No Design Review required. Current Planning to ensure floodplain approval.
|
Route to Impact Fee Review | 11/16/2018 | 11/19/2018 | 11/19/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing - PLAN CHECK | 10/24/2018 | | 11/16/2018 | | FAIL |
Julie Romig
|
|
|
|
1st review completed | | | 11/16/2018 | | FAIL |
Julie Romig
|
|
|
|
Routing - FIRE | 10/24/2018 | 10/24/2018 | 10/30/2018 | | CANC |
Adele J Schaffeld-Griffin
|
|
|
scope of work does not require fire plan review, will complete fire life safety insepction 11/16 - L3 Cottonwood Apartments Repair
|
Routing PW Flood Plain | 10/24/2018 | | 10/29/2018 | | FAIL |
Jason C. Taylor
|
|
|
A portion of the subject property is within the regulatory floodplain. This project must comply with the Boise Floodplain Ordinance (B.C.C. 11-08). If you have any questions, please call Jason Taylor at ###-####.
|
Routing - Design Review | 10/24/2018 | | 10/25/2018 | | FAIL |
Katelyn Menuge
|
|
|
No Design Review Required. Floodplain application required.
|
Intake Approval | | | 10/22/2018 | | PASS |
|
|
|
|
Intake Approval | | | 10/17/2018 | | FAIL |
Michael Hanson
|
|
|
Provide planning and zoning approval letter. MDH
|
Application received | | | 10/2/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 2 2018 6:11PM
|