Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD18-03662
StatusFinaled
Name DARYL Hegerle
Site Address 406 N MOBLEY DR
Project Name406 N Mobley
Customer Number 
ePlanReviewYes
Description
**USES UA ENERGY TRADE OFF** **SPECIAL INSPECTIONS** Permit for the construction of a new 2,618 sq. ft., one story (first story 1,583 sq. ft., below grade 1,035 sq. ft.) single family dwelling with 4 bedrooms, 3 bathrooms, approximately 195 sq. ft. of covered patio/porch and a 592 sq. ft. attached garage per the approved plans and any notations. R-1Czoning and setbacks per planning. JJN
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/19/20203/20/20203/20/2020APASS
DetailsDave Hannah
call 30 mins ahead for access Daryl Phone #: ###-####
DOC - Permit Finaled3/20/20203/20/20203/20/2020PPASS
DetailsDave Hannah
BLD-Wall cover9/26/20199/26/20199/26/2019PPASS
DetailsMike Jordan
Daryli Phone #: ###-####
BLD-Framing/Rough-in9/12/20199/13/20199/17/2019PPASS
DetailsDave Hannah
Call 30 mins for access- Daryl Phone #: ###-####
BLD-Wall Bracing8/20/20198/20/20198/20/2019PPASS
DetailsDave Hannah
daryl Phone #: ###-####
BLD-Footing4/4/20194/5/20194/5/2019APASS
DetailsBrandon Shaw
Daryl- Rebar inspection Phone #: ###-####
BLD-Footing3/25/20193/25/20193/26/2019PPASS
DetailsDave Hannah
rebard // Daryl Phone #: ###-#### garage ftgs
BLD-Footing3/20/20193/21/20193/22/2019APEND
DetailsDave Hannah
Daryl Phone #: ###-#### front set back looks to be at 15 ft
BLD-Wall Bracing3/18/20193/19/20193/20/2019PPASS
DetailsDave Hannah
Daryl Phone #: ###-#### first floor wall
BLD-Footing3/19/20193/20/20193/20/2019ADONE
DetailsDave Hannah
Daryl Phone #: ###-####-per Daryl cancelled
BLD-Foundation3/1/20193/4/20193/4/2019APASS
DetailsBrandon Shaw
Work in progress...
BLD-Foundation2/21/20192/22/20192/22/2019APASS
DetailsDave Hannah
Rebar inspection, please call 30 min ahead for access- Daryl Phone #: ###-####
BLD-Foundation1/9/20191/10/20191/10/2019APASS
DetailsDave Hannah
rebar // Daryl Phone #: ###-#### basement slap and ftgs ok
BLD-Foundation11/27/201811/29/201811/29/2018APASS
DetailsDave Hannah
rebar, pouring at 11:30 - Daryl Phone #: ###-#### basement ok to place concrete
BLD-Foundation11/15/201811/16/201811/16/2018APART
DetailsDave Hannah
rebar // Daryl Phone #: ###-#### basement ftgs ok to place concrete
Inspection Record Card- Bld  10/22/2018 DONE
Issue PAID IN FULL permit  10/22/2018 DONE
OVERRIDE  10/19/2018  
Plan assigned to (J_N)10/4/201810/4/201810/19/2018 DONE
Details
10/17 sfd L1 ePlan. 1st review 10/15 ICC-ES Report for ICF walls, show smoke alarms and CO alarms, provide full packet for foam spray.
Routing - PLAN CHECK10/19/2018 10/19/2018 PASS
DetailsJenny Nelson
PLANS/APPL TAKEN TO FRONT DESK  10/19/2018 DONE
DetailsJenny Nelson
Permit Ready to Issue  10/19/2018 DONE
Need
GC Form
Routing - MECHANICAL10/17/2018 10/17/2018 PASS
DetailsTroy James
Routing - PLANNING10/16/2018 10/16/2018 PASS
DetailsColleen T Carroll
1st review completed  10/15/2018 FAIL
DetailsJenny Nelson
ICC-ES Report for ICF walls, show smoke alarms and CO alarms, provide full packet for foam spray.
Routing - PLAN CHECK10/4/2018 10/15/2018 FAIL
DetailsJenny Nelson
ICC-ES Report for ICF walls, show smoke alarms and CO alarms, provide full packet for foam spray
Route to Impact Fee Review10/4/201810/7/201810/5/2018 PASS
DetailsEric Bilimoria
Can not find the parcel in the GIS system, the building permit may have been assigned a temporary parcel number
Routing - MECHANICAL10/4/2018 10/5/2018 FAIL
DetailsTroy James
emailed corrections to Air comfort zone
Routing - Addressing10/4/2018 10/5/2018 PASS
DetailsDoug Chausow
Updated parcel number.
Application received  10/4/2018 DONE
Application submitted via PDS Online on Oct 4 2018 9:07AM
Intake Approval  10/4/2018 FAIL
1.Manual J
2.REScheck as a document or prescriptive method on plans.
3.Elevations – Please provide all heights of structure to the top of the tallest point.
Plans ACCEPTED BY PLAN TECH  10/4/2018 DONE
Intake Approval  10/4/2018 PASS
Recd Pcfee & Taken To Pln CK  10/4/2018 DONE
Routing - PUBLIC WORKS10/4/2018 10/4/2018 PASS
DetailsMorgan Webb
Routing - PLANNING10/4/2018   FAIL
Attach garage to home or apply for a CUP