BLD-Final | 6/12/2019 | 6/13/2019 | 6/13/2019 | A | PASS |
Brandon Shaw
|
|
|
Wes Phone #: ###-####
|
DOC - Permit Finaled | 6/13/2019 | 6/13/2019 | 6/13/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 6/13/2019 | 6/13/2019 | 6/13/2019 | A | DONE |
Brandon Shaw
|
|
|
ACH50- 3.43
|
PubWorks Occupancy Approval | 6/13/2019 | 6/13/2019 | 6/13/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department.
|
BLD-Energy code compliance | 3/14/2019 | 3/15/2019 | 3/15/2019 | A | PASS |
Mike Jordan
|
|
|
les Phone #: ###-####
|
BLD-Framing/Rough-in | 3/13/2019 | 3/13/2019 | 3/13/2019 | P | PASS |
Jim Sly
|
|
|
Les Phone #: ###-#### Met Les for frame. Verbal....girder truss point loads......fireblock concealed space. Les marked....Red paint. OK to insulate.
|
BLD-Other | 3/6/2019 | 3/6/2019 | 3/6/2019 | P | PASS |
Brandon Shaw
|
|
|
sofit // les Phone #: ###-####
|
BLD-Wall Bracing | 2/12/2019 | 2/13/2019 | 2/13/2019 | A | PART |
Brandon Shaw
|
|
|
First floor only... Straps per Engineering S pgs to be installed before framing rough-in...
|
BLD-Foundation | 12/19/2018 | 12/20/2018 | 12/20/2018 | P | PASS |
Brandon Shaw
|
|
|
Work in progress
|
BLD-Footing | 12/19/2018 | 12/19/2018 | 12/19/2018 | A | PASS |
Brandon Shaw
|
|
|
Work in progress
|
OVERRIDE | | | 12/14/2018 | | |
|
|
|
|
PubWorks Subgrade Approval | 12/14/2018 | 12/14/2018 | 12/14/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Plan assigned to (BJM) | 12/13/2018 | 12/13/2018 | 12/14/2018 | | DONE |
Brian McGowan
|
|
|
rerouted for hillside review
|
Routing PW Grading-Hillside | 12/14/2018 | | 12/14/2018 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
|
Permit Ready to Issue | | | 12/14/2018 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS | 12/13/2018 | | 12/14/2018 | | PASS |
Morgan Webb
|
|
|
|
Routing - PLAN CHECK | 12/13/2018 | | 12/14/2018 | | PASS |
Brian McGowan
|
|
|
|
CHANGE STATUS TO (ISS) | | | 12/14/2018 | | DONE |
|
|
|
|
Meeting | | | 12/13/2018 | | DONE |
|
|
|
Started new workflow, missed Hillside Review.
|
Issue PAID IN FULL permit | | | 11/29/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/29/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 11/21/2018 | | |
|
|
|
|
Plan assigned to (BJM) | 10/5/2018 | 10/5/2018 | 11/21/2018 | | DONE |
Brian McGowan
|
|
|
10/24 sfd L2 ePlan- 2nd Review Complete - Corrections required
|
Routing - PLAN CHECK | 11/21/2018 | | 11/21/2018 | | PASS |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/21/2018 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 11/21/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 11/19/2018 | | 11/19/2018 | | FAIL |
Brian McGowan
|
|
|
Wrong truss package was uploaded. I could not verify point loads to verify corresponding beam sizes.
|
Routing - FIRE | 11/2/2018 | 11/2/2018 | 11/2/2018 | | PASS |
Tim Frost
|
|
|
|
Routing - PLAN CHECK | 11/1/2018 | | 11/1/2018 | | FAIL |
Brian McGowan
|
|
|
|
1st review completed | | | 10/23/2018 | | FAIL |
Brian McGowan
|
|
|
Elevations do not match the floor plans
|
Routing - PLAN CHECK | 10/5/2018 | | 10/23/2018 | | FAIL |
Brian McGowan
|
|
|
Elevations do not match the floor plans
|
Route to Impact Fee Review | 10/5/2018 | 10/8/2018 | 10/8/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - FIRE | 10/5/2018 | 10/5/2018 | 10/8/2018 | | FAIL |
Tim Frost
|
|
|
Please, see attached review.
|
Routing - Erosion and Sediment | 10/5/2018 | | 10/8/2018 | | PASS |
Michael Zawacki
|
|
|
Foothills lot, site prep inspection required.
|
Routing - MECHANICAL | 10/5/2018 | | 10/8/2018 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 10/5/2018 | | 10/5/2018 | | PASS |
Sue Cummings
|
|
|
|
Routing - Addressing | 10/5/2018 | | 10/5/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 10/5/2018 | | 10/5/2018 | | PASS |
Beverly Mountain
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 10/5/2018 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/5/2018 | | DONE |
|
|
|
|
Intake Approval | | | 10/5/2018 | | PASS |
|
|
|
|
Application received | | | 10/4/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 4 2018 10:55AM
|
Intake Approval | | | 10/4/2018 | | FAIL |
|
|
|
NEED
LETTER FROM SUEZ
ALL DRAWINGS IN DRAWINGS FOLDER
|