Case Summary (BLD) | | | 5/4/2020 | | DONE |
|
|
|
|
BLD-Final | 4/21/2020 | 4/21/2020 | 4/21/2020 | P | PASS |
Brandon Shaw
|
|
|
Thames Phone #: ###-####
|
DOC - Permit Finaled | 4/21/2020 | 4/21/2020 | 4/21/2020 | P | PASS |
Brandon Shaw
|
|
|
|
PubWorks Occupancy Approval | 3/3/2020 | 3/3/2020 | 3/3/2020 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s design professional indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
CHANGE STATUS TO (ISS) | | | 2/24/2020 | | DONE |
|
|
|
Per Brandon no fee to put back in ISS status, not sure why expired in june
|
BLD-Aging Inspection | 6/13/2019 | 6/13/2019 | 6/13/2019 | | DONE |
Brandon Shaw
|
|
|
|
Expired/Cancelled | 6/13/2019 | 6/13/2019 | 6/13/2019 | A | DONE |
Brandon Shaw
|
|
|
|
BLD-Foundation | 1/30/2019 | 1/30/2019 | 1/30/2019 | P | PASS |
Brandon Shaw
|
|
|
Work in progress
|
BLD-Footing | 1/23/2019 | 1/24/2019 | 1/24/2019 | A | PART |
Brandon Shaw
|
|
|
Work in progress
|
BLD-Foundation | 12/24/2018 | 12/26/2018 | 12/26/2018 | A | PART |
Jim Storey
|
|
|
Tim Phone #: ###-#### retaining wall rebar ok lower wall
|
BLD-Footing | 12/12/2018 | 12/12/2018 | 12/12/2018 | P | PASS |
Brandon Shaw
|
|
|
Work in progress... Frost protection is required...
|
PubWorks Subgrade Approval | 11/28/2018 | 11/28/2018 | 11/28/2018 | | DONE |
Melissa Jannusch
|
|
|
NORTH RETAINING WALL A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
OVERRIDE | | | 10/24/2018 | | |
|
|
|
|
Plan assigned to (JAB) Josh | 10/4/2018 | 10/4/2018 | 10/24/2018 | | PASS |
Josh Bogle
|
|
|
10/10 retaining wall, ePlan - 1st done
|
Routing - Erosion and Sediment | 10/23/2018 | | 10/24/2018 | | PASS |
Michael Zawacki
|
|
|
|
Routing PW Grading-Hillside | 10/24/2018 | | 10/24/2018 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
All disturbed slopes included in the construction of this project must be stabilized and approved by Public Works before a Final Occupancy Permit is granted. If weather conditions prohibit revegetation and stabilization activities, the contractor shall provide a bond/surety agreement or an irrevocable letter of credit in the amount of 110% of the cost estimated by the project engineer to enable stabilization of the site. Call ###-#### for an inspection.
|
Routing - PLAN CHECK | 10/24/2018 | | 10/24/2018 | | PASS |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/24/2018 | | DONE |
Josh Bogle
|
|
|
ESC yes - Energy no
|
Permit Ready to Issue | | | 10/24/2018 | | DONE |
|
|
|
NEED
GC FORM
|
Issue PAID IN FULL permit | | | 10/24/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/24/2018 | | DONE |
|
|
|
|
(F) Reprint permit | | | 10/24/2018 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 10/23/2018 | | DONE |
Josh Bogle
|
|
|
accepted resubmittals and routed to Hillside and Plan Review
|
1st review completed | | | 10/16/2018 | | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 10/4/2018 | | 10/16/2018 | | FAIL |
Josh Bogle
|
|
|
needs current engineering, rock wall engineering, clarity for construction
|
Routing - PLANNING | 10/4/2018 | | 10/15/2018 | | PASS |
Leon Letson
|
|
|
|
Routing - Erosion and Sediment | 10/15/2018 | | 10/15/2018 | | PASS |
Michael Zawacki
|
|
|
RP needed, site inspection required. Double permit fee do to starting work without permit, MIS18-00101.
|
Routing PW Grading-Hillside | 10/5/2018 | | 10/11/2018 | | FAIL |
Melissa Jannusch
|
|
|
see change marks in ePlan
|
Routing - PUBLIC WORKS | 10/4/2018 | | 10/5/2018 | | PASS |
Beverly Mountain
|
|
|
|
Application received | | | 10/4/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 4 2018 12:13PM
|
Plans ACCEPTED BY PLAN TECH | | | 10/4/2018 | | DONE |
|
|
|
|
Intake Approval | | | 10/4/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/4/2018 | | DONE |
|
|
|
|