Information based on query as of Tuesday, July 23, 2024.
Permit Information
Permit NumberBLD18-03672
StatusIssued
Name RECORD STEEL AND CONSTRUCTION INC
Site Address 3550 N WINSOME PL
Project NameJohnson Residence
Customer Number 
ePlanReviewYes
Description
**HILLSIDE** **WUI FOOTHILLS** **SPECIAL INSPECTIONS** **PRESCRIPTIVE ENERGY REQUIREMENTS** Permit for the construction of a new 5155 sq. ft., two story (first story 3620 sq. ft., second story 1535 sq. ft.) single family dwelling with 4 bedrooms, 4.5 bathrooms, approximately 1380 sq. ft. of covered patio/porch and a 1771 sq. ft. attached garage per the approved plans and any notations. A-1DA zoning and setbacks per planning. An NFPA 13D sprinkler system is being provided, as noted on revised cover sheet. Radiant heating system being provided for driveway. JJNA letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.

An erosion and sediment control site preparation inspection is required for this site. The site preparation inspection takes place after all required erosion and sediment control best management practices have been installed and BEFORE any earthwork takes place. Call 208-608-7070 to schedule an inspection.


All disturbed slopes included in the construction of this project must be stabilized and approved by Public Works before a Final Occupancy Permit is granted. If weather conditions prohibit revegetation and stabilization activities, the contractor shall provide a bond/surety agreement or an irrevocable letter of credit in the amount of 110% of the cost estimated by the project engineer to enable stabilization of the site. Call 208-608-7168 for an inspection. JJN
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection8/6/20208/6/20208/7/2020 PASS
DetailsTony Young
BLD-Framing/Rough-in3/24/20203/25/20203/25/2020APART
DetailsDave Hannah
The house has been approved plumbing and electrical. The HVAC has been approved for the second floor. The builder is requesting approval to apply gypboard to the second floor only. A follow on inspection will be scheduled for later next week? or when the fireplace chimney flue is installed. The delivery of the flue pipe has been delayed. Phone #: ###-#### Inspection requested via web by John Cloninger ok to cover second floor
BLD-Framing/Rough-in11/12/201911/13/201911/13/2019PPART
DetailsTony Young
Structural inspection prior to application of foam insulation. Third party inspection log on site. The roof deck will receive 8" of foam insulation on the underside. This inspection is to check to see if the City will approve the cover of the structural components for cover.The Electrical, Plumbing and Mechanical will be added after the insulation is installed. Phone #: ###-#### Inspection requested via web by John Cloninger/
top of floor/ceiling cavities ok to spray foam,, trades will be under,, structural engineer to inspect prior to foam..
OVERRIDE  9/13/2019  
CHANGE STATUS TO (ISS)  9/13/2019 DONE
Cancelled plan mod and work flow mistakenly stared on this permit.
BLD-Footing1/13/20191/14/20191/14/2019APEND
DetailsTony Young
Pouring caissons for grade beams to bear on. Continuous inspection will be provided by MTI and the pour time is noon. Phone #: ###-#### Inspection requested via web by John Cloninger,, ok pending special inspection report
BLD-Conference1/10/20191/10/20191/10/2019PPART
DetailsTony Young
piers ok per J Taylor,, pending special inspection report,, see his notes on this day
BLD-Footing1/9/20191/10/20191/10/2019AFAIL
DetailsBrandon Shaw
Need soil subgrade submitted and approved by PW before inspection can be completed...
PubWorks Subgrade Approval1/10/20191/10/20191/10/2019 CANC
DetailsJason C. Taylor
Driller piers are regulated under the building code for Special Inspections. No subgrade report will be required, only special inspection reports from Third Party Inspections. Jason Taylor ###-#### .
OVERRIDE  12/11/2018  
Plan assigned to (J_N)11/2/201811/2/201812/11/2018 DONE
DetailsJenny Nelson
11/21 sfd L2 ePlan. 3rd review failed mechanical and hillside. 2nd review, need ICC-ESR for foam insulation. mechanical and PW corrections. 1st review 11/15, carbon detectors, upper floor egress windows, ICC-ES reports
Inspection Record Card- Bld  12/11/2018 DONE
Issue PAID IN FULL permit  12/11/2018 DONE
Routing PW Grading-Hillside12/11/2018 12/11/2018 PASS
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.

An erosion and sediment control site preparation inspection is required for this site. The site preparation inspection takes place after all required erosion and sediment control best management practices have been installed and BEFORE any earthwork takes place. Call ###-#### to schedule an inspection.


All disturbed slopes included in the construction of this project must be stabilized and approved by Public Works before a Final Occupancy Permit is granted. If weather conditions prohibit revegetation and stabilization activities, the contractor shall provide a bond/surety agreement or an irrevocable letter of credit in the amount of 110% of the cost estimated by the project engineer to enable stabilization of the site. Call ###-#### for an inspection.

PLANS/APPL TAKEN TO FRONT DESK  12/11/2018 DONE
DetailsJenny Nelson
Permit Ready to Issue  12/11/2018 DONE
Routing - PLUMBING11/30/2018 11/30/2018 PASS
DetailsDan Ediger
Per ISPC. Backflow requirements will be determined on receipt of the snowmelt and radiant design.
Routing - MECHANICAL11/29/2018 11/29/2018 PASS
DetailsTroy James
Routing PW Grading-Hillside11/27/2018 11/27/2018 FAIL
DetailsMelissa Jannusch
See unresolved changemark in ePlan
Routing - MECHANICAL11/20/2018 11/20/2018 FAIL
DetailsTroy James
Previous comments have not been addressed.
Routing - PLAN CHECK11/20/2018 11/20/2018 PASS
DetailsJenny Nelson
Routing - PLAN CHECK11/19/2018 11/19/2018 FAIL
DetailsJenny Nelson
Need ICC-ESR for foam insulation
Routing PW Grading-Hillside11/16/2018 11/16/2018 FAIL
DetailsMelissa Jannusch
see changemarks in e-plan
1st review completed  11/15/2018 FAIL
DetailsJenny Nelson
ICC-ES report for ICF and foam insulation, upper floor egress windows, carbon detectors
Routing - PLAN CHECK11/2/2018 11/15/2018 FAIL
DetailsJenny Nelson
Routing PW Grading-Hillside11/2/2018 11/14/2018 FAIL
DetailsMelissa Jannusch
Driveway. See changemarks in ePlan for details
Routing - FIRE11/2/201811/2/201811/13/2018 PASS
DetailsLee G Meredith
New SFH

See fire review comments.
11-13-18 Cprey Barnes resubmitted cover drawing and a letter indicating that a NFPA 13D sprinkler system will be provided.
Route to Impact Fee Review11/2/201811/5/201811/6/2018 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - Erosion and Sediment11/2/2018 11/5/2018 PASS
DetailsMichael Zawacki
Foothills home. Site prep inspection required.
Routing - MECHANICAL11/2/2018 11/5/2018 FAIL
DetailsTroy James
Talked to mechanical engineer. They have not completed their mechanical design.
Routing - PLANNING11/2/2018 11/5/2018 PASS
DetailsNicolette Womack
Routing - Addressing11/2/2018 11/2/2018 PASS
DetailsDoug Chausow
Please note: address is on Winsome Pl, not Rd.
Routing - PUBLIC WORKS11/2/2018 11/2/2018 PASS
DetailsMorgan Webb
Plans ACCEPTED BY PLAN TECH  11/2/2018 DONE
Recd Pcfee & Taken To Pln CK  11/2/2018 DONE
Intake Approval  11/2/2018 PASS
Intake Approval  10/8/2018 FAIL
Fire Department satisfaction of non-build agreement not in place for Win Hollow Subdivision. Unable to accept building permit applications for this subdivision until this is complete. All other plan submittal checklist requirements met.
Application received  10/4/2018 DONE
Application submitted via PDS Online on Oct 4 2018 4:24PM
BLD-Aging Inspection8/7/20208/7/2020   
DetailsTony Young