BLD-Final | 12/28/2018 | 12/31/2018 | 12/31/2018 | A | PASS |
Mike Jordan
|
|
|
Plumbing final was completed so I was told. Thanks Phone #: ###-#### Inspection requested via web by Dustin Collins
|
DOC - Permit Finaled | 12/31/2018 | 12/31/2018 | 12/31/2018 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Final | 12/17/2018 | 12/18/2018 | 12/18/2018 | P | NR |
Mike Jordan
|
|
|
Gas pipe has been inspected and nothing more is being done for that. We have requested the plumber close that permit. Electrical has been completed as well. Thanks Phone #: ###-#### Inspection requested via web by Dustin Collins. A final mech. inspection is required prior to building final. Dustin was called and notified.
|
BLD-Final | 12/13/2018 | 12/13/2018 | 12/13/2018 | P | NR |
Mike Jordan
|
|
|
Please call prior to arrival so we can give you access to building. Shop is located in the back yard with a gate either on the side of the house or the rear of the yard. Thanks Phone #: ###-#### Inspection requested via web by Dustin Collins. Needs electrical and mech. finals first.
|
BLD-Framing/Rough-in | 11/16/2018 | 11/19/2018 | 11/19/2018 | A | PASS |
Mike Jordan
|
|
|
access is in back (eary as possible)- Kevin Phone #: ###-####
|
BLD-Framing/Rough-in | 11/19/2018 | 11/19/2018 | 11/19/2018 | P | PASS |
Mike Jordan
|
|
|
All framing issues have been resolved. Per contractor electrical and mech. rough in work will take place at later date, no sheet rock at htis time. only underground for mech and electrical work.
|
BLD-Wall Bracing | 11/16/2018 | 11/19/2018 | 11/19/2018 | A | PASS |
Mike Jordan
|
|
|
access is in back (eary as possible)- Kevin Phone #: ###-####
|
BLD-Wall Bracing | 11/16/2018 | 11/16/2018 | 11/16/2018 | P | NH |
Jim Sly
|
|
|
shear // Kevin Phone #: ###-####
|
BLD-Framing/Rough-in | 11/16/2018 | 11/16/2018 | 11/16/2018 | P | NH |
Jim Sly
|
|
|
Kevin Phone #: ###-#### No one at home......no access.
|
BLD-Framing/Rough-in | 11/15/2018 | 11/16/2018 | 11/16/2018 | A | FAIL |
Mike Jordan
|
|
|
Kevin Phone #: ###-####. Provide truss engineering. Nail off missed seams on north wall. Nail off portal frame per provided deatil. Install the missing straps from header to jack studs.
|
BLD-Foundation | 10/23/2018 | 10/24/2018 | 10/24/2018 | P | PASS |
Mike Jordan
|
|
|
Rick Phone #: ###-####
|
BLD-Footing | 10/19/2018 | 10/19/2018 | 10/19/2018 | P | PASS |
Dave Hannah
|
|
|
Rick Sullivan Phone #: ###-####
|
OVERRIDE | | | 10/8/2018 | | |
|
|
|
|
Routing Walk-In (BLD) | 10/8/2018 | 10/8/2018 | 10/8/2018 | P | PASS |
Josh Bogle
|
|
|
took in as a level two, routed to Floodplain
|
Plan assigned to (JAB) Josh | 10/4/2018 | 10/4/2018 | 10/8/2018 | | PASS |
Josh Bogle
|
|
|
10/10 shop, ePlan - floodplain
|
Routing - PLAN CHECK | | | 10/8/2018 | | PASS |
Josh Bogle
|
|
|
|
Routing - PLANNING | 10/4/2018 | | 10/8/2018 | | PASS |
Ted Vanegas
|
|
|
|
Routing PW Flood Plain | 10/8/2018 | | 10/8/2018 | | PASS |
Jason C. Taylor
|
|
|
Approved LOMR on File. No floodplain review required. If you have any questions, please call Jason Taylor at ###-####.
|
1st review completed | | | 10/8/2018 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 10/8/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 10/8/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/8/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 10/8/2018 | | DONE |
|
|
|
need RP
|
Telephone call | | | 10/8/2018 | | DONE |
|
|
|
called Dustin to let knwo permit is ready
|
Issue PAID IN FULL permit | | | 10/8/2018 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 10/4/2018 | | DONE |
|
|
|
|
Intake Approval | | | 10/4/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/4/2018 | | DONE |
|
|
|
|
Application received | | 10/4/2018 | | | |
|
|
|
|