BLD-Final | 4/16/2019 | 4/16/2019 | 4/16/2019 | P | PASS |
Mike Jordan
|
|
|
Sean Phone #: ###-####
|
DOC - Permit Finaled | 4/16/2019 | 4/16/2019 | 4/16/2019 | P | PASS |
Mike Jordan
|
|
|
All issues were resolved.
|
BLD-Final | 4/15/2019 | 4/16/2019 | 4/16/2019 | A | FAIL |
Mike Jordan
|
|
|
Shawn Phone #: ###-####. Provide blower door test result and post. 20 min. door to be self closing. Firecaulk penetrations in garage.
|
BLD-Energy code compliance | 1/24/2019 | 1/24/2019 | 1/24/2019 | P | PASS |
Jim Sly
|
|
|
Jason Phone #: ###-#### FRAME AND ENERGY.........Pass.
|
BLD-Framing/Rough-in | 1/22/2019 | 1/23/2019 | 1/23/2019 | A | NR |
Mike Jordan
|
|
|
Call 20 minutes ahead // Shawn Phone #: ###-####. Will need to nail on tall walls. Ok to insulate.
|
BLD-Framing/Rough-in | 1/22/2019 | 1/22/2019 | 1/22/2019 | P | PART |
Jim Sly
|
|
|
Sean Phone #: ###-#### Most of corrections completed.....some deficiencies per tall wall Engineering.....missed hd's Staple spacing alternate hd,s Meet with inspector for conference.
|
BLD-Framing/Rough-in | 1/17/2019 | 1/17/2019 | 1/17/2019 | P | FAIL |
Mike Jordan
|
|
|
Shawn Phone #: ###-####. Complete lateral bracing on A03, A04,A05, A08 and A011 trusses. NAil BX1 and G2 trusses per the enginering. Roll block E4 trusses. Trusses in hangars on D4 truss not seated. All portal frames shall be nailed. Install all missed blocking and nail, install LIB. Provide the engineering for the tall walls in garage. Correction notice posted.
|
BLD-Footing | 11/7/2018 | 11/7/2018 | 11/7/2018 | P | PART |
Mike Jordan
|
|
|
Nate Phone #: ###-####
|
OVERRIDE | | | 11/6/2018 | | |
|
|
|
|
Plan assigned to (J_N) | 10/24/2018 | 10/24/2018 | 11/6/2018 | | DONE |
Jenny Nelson
|
|
|
11/06 sfd L1 ePlan. 2nd review 11/5, garage header. 1st review complete, wall bracing, foundation spread footing, garage beam
|
Issue PAID IN FULL permit | | | 11/6/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/6/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 11/6/2018 | | 11/6/2018 | | PASS |
Jenny Nelson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/6/2018 | | DONE |
Jenny Nelson
|
|
|
|
Permit Ready to Issue | | | 11/6/2018 | | DONE |
|
|
|
met
|
Routing - PLAN CHECK | 11/5/2018 | | 11/5/2018 | | FAIL |
Jenny Nelson
|
|
|
|
1st review completed | | | 11/2/2018 | | FAIL |
Jenny Nelson
|
|
|
Foundation spread footing, garage beam, wall bracing
|
Routing - PLAN CHECK | 10/24/2018 | | 11/2/2018 | | FAIL |
Jenny Nelson
|
|
|
|
Route to Impact Fee Review | 10/24/2018 | 10/27/2018 | 10/25/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - MECHANICAL | 10/24/2018 | | 10/24/2018 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 10/24/2018 | | 10/24/2018 | | PASS |
Brent Moore
|
|
|
|
Routing - Addressing | 10/24/2018 | | 10/24/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 10/24/2018 | | 10/24/2018 | | PASS |
Rita DeYoung
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 10/24/2018 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/24/2018 | | DONE |
|
|
|
|
Intake Approval | | | 10/24/2018 | | PASS |
|
|
|
|
Intake Approval | | | 10/23/2018 | | FAIL |
|
|
|
2nd Prescreen 10-23-18 Please provide res check or prescriptive energy code (2015)
|
Telephone call | | | 10/19/2018 | | DONE |
|
|
|
talked to Steve-link is fixed-was broken-changed l/b for him and address and all he needs now is the prescriptive- ###-####
|
Intake Approval | | | 10/9/2018 | | FAIL |
|
|
|
need res check or prescription
|
Application received | | | 10/8/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 8 2018 11:00PM
|