Information based on query as of Thursday, July 4, 2024.
Permit Information
Permit NumberBLD18-03713
StatusFinaled
Name STRAIGHT LINE BUILDING SOLUTIONS LL
Site Address 1211 W MYRTLE ST Unit: #300
Project NameGuild Mortgage
Customer Number 
ePlanReviewYes
Description
(GUILD MORTGAGE) This building is fully fire sprinklered for 1-hr. substitution. Vanilla shell permit was issued under BLD15-03655 and the core and shell under BLD97-01839. This building has quick response heads installed in the fire sprinkler system FIR10-00590. The corridors are not required to be rated per 2015 IBC 1020.1. Tenant is located on the 3rd floor, suite #300. Scope of work: interior demolition work, new interior non-bearing partition walls, new doors and hardware breakroom millwork, and new interior finish that meets IBC chapter 8 requirements. Ceiling grid and lighting will remain and be altered as needed for repairs in areas of construction. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JHB**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 2/17/20192/14/2019 DONE
This permit finaled on the web by Brian McCoy
First Notice 1/19/20192/7/2019 DONE
mailed 2-11-19
Permanent Occupancy  1/9/2019 DONE
BLD-Final1/7/20191/8/20191/8/2019APASS
DetailsDave Hannah
Tom Phone #: ###-####
FIRE-Final Inspection1/4/20191/7/20191/7/2019APASS
DetailsJim Page
Fire sprinkler inspection complete, fire alarm inspection complete, fire extinguisher is placed with a current inspection tag. Final life fire safety inspection for area of work complete.

Tom Phone #: ###-####
FIRE-Final Inspection12/27/20181/2/20191/2/2019ACANC
DetailsJim Page
Life fire safety inspection will be completed with fire alarm inspection on 3JAN2019, this request is cancelled due to coodination issues on fire alarm inspectiion.

Tom Phone #: ###-####
BLD-Ceiling Grid Inspection12/11/201812/12/201812/12/2018APASS
DetailsDave Hannah
Tom Phone #: ###-####
BLD-Framing/Rough-in11/2/201811/5/201811/5/2018APASS
DetailsDave Hannah
Tom Phone #: ###-####
Issue PAID IN FULL permit  10/29/2018 DONE
Print Occupancy Form  10/29/2018 DONE
Plan assigned to (JHB)10/12/201810/12/201810/26/2018 PASS
DetailsJoe Bruce
10/29 (L2) - Guild Mortgage
Routing - PLAN CHECK10/12/2018 10/26/2018 PASS
DetailsJoe Bruce
1st review completed  10/26/2018 DONE
DetailsJoe Bruce
PLANS/APPL TAKEN TO FRONT DESK  10/26/2018 DONE
Permit Ready to Issue  10/26/2018 DONE
NEED- all met
GC
Rev cert of val
Intake Approval  10/10/2018 PASS
Application received  10/9/2018 DONE
Application submitted via PDS Online on Oct 9 2018 3:31PM