Information based on query as of Tuesday, July 23, 2024.
Permit Information
Permit NumberBLD18-03720
StatusFinaled
Name TRADEWINDS GENERAL CONTRACTING INC
Site Address 1538 S ROBERT ST
Project NameLot 1
Customer Number 
ePlanReviewNo
Description
**PRESCRIPTIVE ENERGY REQUIREMENTS** Permit for the construction of a new 1643 sq. ft., two story (first story 867 sq. ft., second story 776 sq. ft.) single family dwelling with 3 bedrooms, 3 bathrooms, approximately 120 sq. ft. of covered patio/porch and a 399 sq. ft. detached garage per the approved plans and any notations. L-OD zoning and setbacks per planning. JJN
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/29/20195/29/20195/29/2019PPASS
DetailsBrandon Shaw
Jason Phone #: ###-####
DOC - Permit Finaled5/29/20195/29/20195/29/2019PPASS
DetailsBrandon Shaw
BLD-Final5/24/20195/24/20195/24/2019PFAIL
DetailsMike Jordan
Jason Phone #: ###-####. Tempered glazing required in window next to back door. Correction notice posted.
BLD-Energy code compliance4/9/20194/10/20194/10/2019APASS
DetailsBrandon Shaw
Jason Phone #: ###-####
BLD-Framing/Rough-in4/9/20194/10/20194/10/2019APASS
DetailsBrandon Shaw
Corrections SAT...
BLD-Framing/Rough-in4/3/20194/3/20194/3/2019PPART
DetailsJim Storey
Call to meet there // jASON Phone #: ###-#### c/n missing hangers e4/fire blk ceilling both tubs/add floor joist cut by plm.
BLD-Wall Bracing3/28/20193/28/20193/28/2019PPASS
DetailsDave Hannah
re-inspection // Jason Phone #: ###-####
BLD-Wall Bracing3/21/20193/22/20193/22/2019AFAIL
DetailsBrandon Shaw
Straps at PHF, back wall, to be nailed per manufactures instalation instruction...
Add 2x2 washer at garage PHF...
As per plans, install interior shear panels- 4 locations, see plans...
Routing - MECHANICAL2/19/2019 2/19/2019 PASS
DetailsChad Schwendiman
Revised acca report
BLD-Footing1/17/20191/18/20191/18/2019APASS
DetailsJim Storey
Matt Phone #: ###-####
BLD-Foundation12/11/201812/12/201812/12/2018PPASS
DetailsJim Sly
Jose Phone #: ###-####
BLD-Footing12/10/201812/11/201812/11/2018PPART
DetailsMike Jordan
Jose Phone #: ###-####
Issue PAID IN FULL permit  11/19/2018 DONE
OVERRIDE  11/2/2018  
Plan assigned to (J_N)10/10/201810/10/201811/2/2018 DONE
DetailsJenny Nelson
10/23 sfd L1 paper. 1st review complete 10/23 Garage header, update to current PFH detail, clarify upper bedroom flooring, 1-hour fire wall garage
Inspection Record Card- Bld  11/2/2018 DONE
Telephone call  11/2/2018 DONE
Left message for Steve informing permit is ready, fee amount due and RP needed
Routing - PLAN CHECK11/2/2018 11/2/2018 PASS
DetailsJenny Nelson
Case Summary (BLD)  11/2/2018 DONE
DetailsJenny Nelson
PLANS/APPL TAKEN TO FRONT DESK  11/2/2018 DONE
DetailsJenny Nelson
Permit Ready to Issue  11/2/2018 DONE
Need
RP
Routing - PLANNING10/11/2018 11/1/2018 PASS
DetailsBrent Moore
Plan resubmittals received  10/30/2018 DONE
Two copies of full size plans(SA1,S2,S3 and S3.1) and one set of small plans and Roof Drop beam. Two extra copies of SA1 Site plan, stamped and taken to Jenny.
1st review completed  10/23/2018 DONE
DetailsJenny Nelson
Garage header, update to current PFH detail, clarify upper bedroom flooring, 1-hour fire wall garage
Routing - PLAN CHECK10/12/2018 10/23/2018 FAIL
DetailsJenny Nelson
Routing - MECHANICAL10/12/2018 10/12/2018 PASS
DetailsTroy James
Route to Impact Fee Review10/10/201810/13/201810/11/2018 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - Addressing10/10/2018 10/11/2018 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS10/10/2018 10/11/2018 PASS
DetailsMorgan Webb
Plans ACCEPTED BY PLAN TECH  10/10/2018 DONE
Recd Pcfee & Taken To Pln CK  10/10/2018 DONE
Intake Approval  10/10/2018 PASS
Application received 10/10/2018