Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD18-03747
StatusFinaled
Name CARLSON MATERIAL HANDLING
Site Address 6707 S EISENMAN RD
Project NameIntegrity Audio Visual - Racks
Customer Number 
ePlanReviewNo
Description
(INTEGRITY AUDIO VISUAL – RACKING – SOUTH END OF BUILDING A) The fire sprinkler system is used for building area increase and for fire area. To install steel storage racks a maximum of 12 feet tall within the 8,356 square foot warehouse portion of a 10,162 square foot tenant space. Interior tenant improvement work was done under permit BLD18-02561 for “Integrity Audio Visual”. The racks will be attached to the existing concrete floor using one 1/2" Hilti Kwik Bolt TZ anchor embedded 3.5 inches for each base plate. Anchors post-installed in hardened concrete are required to comply with ESR-1917 and are required to have Special Inspection. The racks and their installation are required to comply with RMI/ANSI MH 16.1--12. The work is required to comply with the approved drawings, with the structural design, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Plan Reviewer's activity  12/21/2018 DONE
Took the paper drawings to records
First Notice10/30/201810/30/201811/6/2018 DONE
DetailsJim Storey
mailed 11-12
BLD-Final10/30/201810/30/201810/30/2018PPASS
DetailsJim Storey
Becky Phone #: ###-####
DOC - Permit Finaled10/30/201810/30/201810/30/2018PPASS
DetailsJim Storey
BLD-Final10/23/201810/29/201810/29/2018PFAIL
DetailsJim Storey
brandon Phone #: ###-#### missing clips and slide engagement to posts.
FIRE-Final Inspection10/23/201810/29/201810/29/2018APASS
DetailsJim Page
Life fire safety inspection for racking permit complete.

brandon Phone #: ###-####
Issue PAID IN FULL permit  10/23/2018 DONE
Routing - FIRE10/19/201810/19/201810/22/2018 PASS
DetailsTim Frost
Plan assigned to (CJW)10/11/201810/11/201810/22/2018 PASS
DetailsCarl Westfall
(1st done) 10/17/18 (L1 - 5 days) (ePlan - 5 sheets) Integrity Audio - racking
Routing - PLAN CHECK10/22/2018 10/22/2018 DONE
DetailsCarl Westfall
PLANS/APPL TAKEN TO FRONT DESK  10/22/2018 DONE
Permit Ready to Issue  10/22/2018 DONE
MET
Inspection Record Card- Bld  10/22/2018 DONE
Telephone call  10/22/2018 DONE
Left a message for Mike informing permit is ready and the fee amount due
Routing - PLAN CHECK10/11/2018 10/19/2018 PASS
DetailsCarl Westfall
Plans ACCEPTED BY PLAN TECH  10/11/2018 DONE
Intake Approval  10/11/2018 PASS
Recd Pcfee & Taken To Pln CK  10/11/2018 DONE
Application received 10/11/2018