Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD18-03753
StatusFinaled
Name OWYHEE ENTERPRISES LLC
Site Address 416 S 9TH ST
Project NameHawkins Companies Fire Repair
Customer Number 
ePlanReviewYes
Description
(HAWKINS COMPANIES – FLOOR REPAIRS – FIRE DAMAGE FROM SPACE BELOW) The fire sprinkler system is used for building area increase, story increase, and for fire area. To repair the floor structure that was damaged by a fire that occurred in the space below. The floor is located between the “Knitting Factory” below and “Hawkins Companies” above. Work is to include new floor joists, new 1x6 diagonal sheathing above new floor joists, new plywood floor sheathing above new diagonal sheathing, and a new gyp-crete topping slab above the new floor sheathing. The work is required to comply with the approved drawings, with the structural calculations, with the plan review report, and with all applicable codes and ordinances. This is a scope of work permit only. This permit is not intended to establish a Certificate of Occupancy for any tenant. The existing Certificate of Occupancy is still valid. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. The existing fire wall, including opening protection, is required to be maintained in compliance with the Building Code. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 12/24/20181/8/2019 DONE
mailed 1-11-19
First Notice11/27/201811/27/201812/14/2018 DONE
DetailsDave Hannah
MAILED 12-17
BLD-Final11/26/201811/27/201811/27/2018APASS
DetailsDave Hannah
Zach Phone #: ###-####
DOC - Permit Finaled11/27/201811/27/201811/27/2018PPASS
DetailsDave Hannah
BLD-Final11/21/201811/23/201811/23/2018ANH
DetailsJim Storey
Zach Phone #: ###-####
FIRE-Final Inspection11/20/201811/21/201811/21/2018APASS
DetailsJim Page
Final life fire safety inspection for scope of work complete.

Zack Phone #: ###-####
BLD-Framing/Rough-in11/20/201811/20/201811/20/2018PPASS
DetailsDave Hannah
call 20 min before to meet for access // Zach Smith Phone #: ###-####
Inspection Record Card- Bld  11/19/2018 DONE
Issue PAID IN FULL permit  11/19/2018 DONE
Plan assigned to (CJW)10/18/201810/18/201810/25/2018 PASS
DetailsCarl Westfall
* 10/25/18 (L2 - 7 days) (ePlan - 2 sheets) Knitting Factory Fire Repair
Routing - PLAN CHECK10/18/2018 10/25/2018 PASS
DetailsCarl Westfall
1st review completed  10/25/2018 DONE
PLANS/APPL TAKEN TO FRONT DESK  10/25/2018 DONE
Permit Ready to Issue  10/25/2018 DONE
NEED
GC FORM
REVISED VALUE
Routing Off Site - STRUCTURAL10/18/2018 10/22/2018 PASS
DetailsCarl Westfall
Jordan Terry (KPFF)
Intake Approval  10/17/2018 FAIL
DetailsJavier Guzman
Provide and upload the following:
1. Provide an existing floor plan and show the location of the damage within the building
2. Provide a vicinity map showing location of property with street names
3. The code analysis report uploaded is not valid since the permit has not been issued, therefore provide a code analysis of the building
4. All items listed above can be resolved by reaching out to our records department ###-#### and acquiring existing plans on file and upload them and just cloud or circle the area of damage
Intake Approval  10/17/2018 PASS
DetailsJavier Guzman
Application received  10/11/2018 DONE
Application submitted via PDS Online on Oct 11 2018 11:15AM