Second Notice | | 12/24/2018 | 1/8/2019 | | DONE |
|
|
|
mailed 1-11-19
|
First Notice | 11/27/2018 | 11/27/2018 | 12/14/2018 | | DONE |
Dave Hannah
|
|
|
MAILED 12-17
|
BLD-Final | 11/26/2018 | 11/27/2018 | 11/27/2018 | A | PASS |
Dave Hannah
|
|
|
Zach Phone #: ###-####
|
DOC - Permit Finaled | 11/27/2018 | 11/27/2018 | 11/27/2018 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 11/21/2018 | 11/23/2018 | 11/23/2018 | A | NH |
Jim Storey
|
|
|
Zach Phone #: ###-####
|
FIRE-Final Inspection | 11/20/2018 | 11/21/2018 | 11/21/2018 | A | PASS |
Jim Page
|
|
|
Final life fire safety inspection for scope of work complete.
Zack Phone #: ###-####
|
BLD-Framing/Rough-in | 11/20/2018 | 11/20/2018 | 11/20/2018 | P | PASS |
Dave Hannah
|
|
|
call 20 min before to meet for access // Zach Smith Phone #: ###-####
|
Inspection Record Card- Bld | | | 11/19/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 11/19/2018 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 10/18/2018 | 10/18/2018 | 10/25/2018 | | PASS |
Carl Westfall
|
|
|
* 10/25/18 (L2 - 7 days) (ePlan - 2 sheets) Knitting Factory Fire Repair
|
Routing - PLAN CHECK | 10/18/2018 | | 10/25/2018 | | PASS |
Carl Westfall
|
|
|
|
1st review completed | | | 10/25/2018 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/25/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/25/2018 | | DONE |
|
|
|
NEED
GC FORM
REVISED VALUE
|
Routing Off Site - STRUCTURAL | 10/18/2018 | | 10/22/2018 | | PASS |
Carl Westfall
|
|
|
Jordan Terry (KPFF)
|
Intake Approval | | | 10/17/2018 | | FAIL |
Javier Guzman
|
|
|
Provide and upload the following:
1. Provide an existing floor plan and show the location of the damage within the building
2. Provide a vicinity map showing location of property with street names
3. The code analysis report uploaded is not valid since the permit has not been issued, therefore provide a code analysis of the building
4. All items listed above can be resolved by reaching out to our records department ###-#### and acquiring existing plans on file and upload them and just cloud or circle the area of damage
|
Intake Approval | | | 10/17/2018 | | PASS |
Javier Guzman
|
|
|
|
Application received | | | 10/11/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 11 2018 11:15AM
|