BLD-Final | 11/16/2018 | 11/19/2018 | 11/19/2018 | A | PASS |
Jim Sly
|
|
|
Johan Phone #: ###-####
|
DOC - Permit Finaled | 11/19/2018 | 11/19/2018 | 11/19/2018 | P | PASS |
Jim Sly
|
|
|
|
BLD-Final | 10/29/2018 | 10/29/2018 | 10/29/2018 | P | NR |
Jim Sly
|
|
|
Tim Phone #: ###-#### Need handrail.
|
Routing Walk-In (BLD) | 10/12/2018 | 10/12/2018 | 10/12/2018 | P | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 10/12/2018 | | 10/12/2018 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 10/12/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 10/12/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/12/2018 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy no
|
Permit Ready to Issue | | | 10/12/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 10/12/2018 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 10/11/2018 | 10/11/2018 | 10/11/2018 | P | PASS |
Susan Riggs
|
|
|
|
Routing Walk-In (BLD) | 10/11/2018 | 10/11/2018 | 10/11/2018 | P | FAIL |
Josh Bogle
|
|
|
|
Plan assigned to (JAB) Josh | 10/11/2018 | 10/11/2018 | 10/11/2018 | | DONE |
Josh Bogle
|
|
|
10/11 deck, paper - 1st done
|
Routing - PLAN CHECK | 10/11/2018 | | 10/11/2018 | | FAIL |
Josh Bogle
|
|
|
deck at manufactured home, missing some code compliance details - called carpenter (Tim) to work through design, left a msg
|
1st review completed | | | 10/11/2018 | | FAIL |
Josh Bogle
|
|
|
|
Application received | | 10/11/2018 | | | |
|
|
|
|