Permit Information
Permit NumberBLD18-03757
StatusFinaled
Name ORCHARD PARTNERS LLP
Site Address 1301 N ORCHARD ST Unit: STE 200
Project NameVanilla Suite #200
Customer Number 
ePlanReviewYes
Description
(VANILLA - CSC BUILDING - 2ND FLOOR – SUITE #200) NO OCCUPANCY ALLOWED UNDER THIS PERMIT. TENANT SHALL APPLY FOR CERTIFICATE OF OCCUPANCY PRIOR TO OCCUPYING THE SPACE. Permit is to remodel an existing 19,315 sq. ft. business space on the second floor within the existing building. Approval is contingent upon adhering to the approved plans on file and plan review report. Work to include: removal of select interior nonbearing walls, removal of select door/door frames and relocate select doors, removal of select interior windows, removal of select suspended acoustic ceiling, construction of interior non-bearing walls to create offices throughout the floor, select new door/door frames, select wall infill, a new electric oven in the breakroom, select new suspended acoustic ceiling, relocated light fixtures, electrical work, mechanical work and interior finishes in compliance with Ch. 8 of the current IBC. This building is fully Fire Sprinklered. The fire sprinkler is used for area and height increase. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/5/20193/6/20193/6/2019APASS
DetailsJim Sly
Carl Phone #: ###-####
DOC - Permit Finaled  3/6/2019 DONE
final passed permit not for occupancy
Letter of compliance/Occupancy  3/6/2019 DONE
FIRE-Final Inspection3/4/20193/5/20193/5/2019PPASS
DetailsTroy Cobbley
Life safety passed

KARL Phone #: ###-####
BLD-Framing/Rough-in2/1/20192/4/20192/4/2019APASS
DetailsJim Sly
Carl Phone #: ###-####
Inspection Record Card- Bld  1/15/2019 DONE
Issue PAID IN FULL permit  1/15/2019 DONE
Route to Impact Fee Review11/7/201811/10/201811/7/2018 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Routing - FIRE11/1/201811/1/201811/7/2018 PASS
DetailsErika Akin
Attached comments to case
Plan assigned to (JG)10/23/201810/23/201811/7/2018 PASS
DetailsJavier Guzman
11/05 L2 CSC Building Second Floor TI ePlan, pend fire
Routing - PLAN CHECK10/23/2018 11/7/2018 PASS
DetailsJavier Guzman
1st review completed  11/7/2018 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  11/7/2018 DONE
Permit Ready to Issue  11/7/2018 DONE
NEED- all met
GC
Rev cert of val
Routing - MECHANICAL11/1/2018 11/1/2018 PASS
DetailsTroy James
Outside air is required to the new offices and conference rooms. Return air path is also required.
Routing - Addressing10/23/2018 10/23/2018 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS10/23/2018 10/23/2018 PASS
DetailsRita DeYoung
Intake Approval  10/23/2018 PASS
DetailsJavier Guzman
Intake Approval  10/16/2018 FAIL
DetailsJoe Bruce
1) The architectural stamp/signature is not legible. Revise and upload drawings with a clear architectural stamp and signature.
2) Since lights are being relocated and modifications made to the floorplan: Show locations of exit signs and emergency lighting on the plans even if they are existing.
Application received  10/11/2018 DONE
Application submitted via PDS Online on Oct 11 2018 3:09PM